15 stellar historic preservation, adaptive reuse, and renovation projects

15 stellar historic preservation, adaptive reuse, and renovation projects

Meet the winners of Building Design+Construction's 2013 Reconstruction Awards


By BD+C Editor | October 30, 2013
Historic preservation adaptive reuse project: 510 Fifth Reno
Historic preservation adaptive reuse project: 510 Fifth Reno

The winners of the 2013 Reconstruction Awards showcase the best work of distinguished Building Teams, encompassing historic preservation, adaptive reuse, and renovations and additions.

 

 

 

 

 

Platinum Awards

 

Nation's first glass curtain wall exterior restored in San Francisco

The Hallidie Building's glass-and-steel skin is generally recognized as the forerunner of today’s curtain wall facilities. Read the story.
 
 
 
 

 

High-rise Art Deco courthouse gets a makeover in Amarillo, Texas

Recognized as one of the most significant Art Deco courthouses in Texas, the Potter County Courthouse is modernized and restored to its 1930s aesthetic. Read the story.
 
 
 
 

 

Toronto Maple Leafs arena converted to university recreation facility

Using steel reinforcement and massive box trusses, a Building Team methodically inserts four new floors in the landmark arena while preserving and restoring its historic exterior. Read the story.
 
 
 

 

Gold Awards

Cass Gilbert's landmark St. Louis Central Library gets a reboot

A $70 million project returns large sections of the building to their original Beaux Arts beauty, while modernizing the spaces to make them more inviting and useful for today’s patrons. Read the story.
 
 
 
 

From power plant to office: Ambler Boiler House conversion

The shell of a 19th-century industrial plant is converted into three levels of modern office space. Read the story.
 
 
 
 
 

SOM gets second crack at iconic modernist structure in New York

More than 50 years after SOM completed the Manufacturers Hanover Trust building, the firm is asked to restore and modernize the space. Read the story.
 
 
 
 
 

Statue of Liberty update brings patrons closer to the action

While past renovation and restoration work on Liberty Island received more fanfare, the latest update arguably has had a greater impact on the three million people that visit the monument each year. Read the story.
 
 
 

 

Silver Awards

 

Manhattan's landmark Marble Collegiate Church modernized

Marble Collegiate Church, built in 1854 on a dirt road, is now surrounded by a densely populated Manhattan neighborhood. Gaining national recognition during the 52-year tenure of Norman Vincent Peale, the Romanesque Revival landmark still serves more than 2,200 congregants. Read the story.
 
 
 
 
 

Everyman Theatre, Baltimore, Md.

The Baltimore structure that opened as the Empire Theatre in 1911 has seen stints as a vaudeville house, burlesque theater, cinema, bingo parlor, boxing venue, adult-movie theater, and parking garage. In 1990, the dilapidated building was abandoned. Everyman Theatre—a professional repertory company—took possession 16 years later through a $1 transfer from the Bank of America and the Harold A. Dawson Trust. Read the story. (TO COME)
 
 
 
 
 

Conrad B. Duberstein U.S. Bankruptcy Courthouse, Brooklyn, N.Y.

The narrative of this exterior restoration centers on the sheer scale of the project. The six-year, $61.7 million effort involved meticulously inspecting, cataloging, and restoring more than 75,000 sf of granite and terra cotta cladding. Read the story. (TO COME)
 
 
 
 
 

Thomas P. O’Neill Jr. Federal Building, Washington, D.C.

The District of Columbia, famed for neoclassical landmarks, also has its share of modernist behemoths. The Thomas P. O’Neill Jr. Federal Building is typical—more than half a million square feet in a nine-story structure occupying most of a city block. Built in 1965 for the FDA, the laboratory facility was recently transformed into green, Class A office space for several federal tenants, incorporating some bold interior changes and a thoughtful exterior upgrade. Read the story. (TO COME)
 
 
 
 
 

Paramount Theatre, Cedar Rapids, Iowa

In Stephen Sondheim’s musical “Follies,” an aging chorine sings of life’s ups and downs, punctuated by the refrain “I’m still here.” The phrase would be a fitting theme for the Paramount Theatre of Cedar Rapids, Iowa—a beloved building that has survived an entertainment revolution, economic upheavals, and a natural disaster. Read the story. (TO COME)
 
 
 

 

Bronze Awards

 

Oregon Department of Transportation, Salem, Ore.

Oregon’s Department of Transportation occupies one of the last state government facilities in Salem to receive an energy and seismic retrofit. The 1951 structure has been transformed with a reconstruction that significantly improved efficiency and occupant comfort. Read the story. (TO COME)
 
 
 
 
 

Wrigley Building, Chicago

The Wrigley Building, erected in two phases in the early 1920s, has always been a jewel of Chicago’s busy Michigan Avenue. The building’s two towers are connected by a 14th-floor bridge, but few passersby would know that the original design intent was to have an open plaza between the towers. Read the story. (TO COME)
 
 
 

 

Special Recognition

 

‘Daylighting’ the Saw Mill River at Larkin Plaza, Yonkers, N.Y.

A “daylighting” plan uncovered the Saw Mill River and made it the centerpiece of a new public park, restoring a long-absent feature of downtown Yonkers, N.Y. Read the story. (TO COME)
 
 
 

 

2013 Reconstruction Awards Judges

 
 
Judges for Building Design+Construction’s 30th Annual Reconstruction Awards (left to right): Bonnie McDonald, K. Nam Shiu, Rick Juneau, Daniel Doyle, Walker Johnson, Stephen Martinez, Gary Keclik. Not pictured: Martha Bell
 
 
HONORARY CHAIR
Walker C. Johnson, FAIA
Principal
Johnson Lasky Architects
Chicago, Ill.
 
DISTINGUISHED MEMBERS
Martha Bell, FAIA, LEED AP
Principal
Tilton, Kelly + Bell
Chicago, Ill.
 
Daniel L. Doyle, PE, LEED AP O+M
President
Grumman/Butkus Associates
Evanston, Ill.
 
Rick Juneau, LEED AP
President, Residential & Restoration
Bulley & Andrews
Chicago, Ill.
Gary B. Keclik, AIA, CSI, GGA, LEED AP
Principal Architect
Keclik Associates
Hoffman Estates, Ill.
 
Stephen L. Martinez, LEED AP
Senior VP,  Project Management & Development Services
Transwestern
Chicago, Ill.
 
Bonnie McDonald
President
Landmarks Illinois
Chicago, Ill.
 
K. Nam Shiu, SE, PE
Senior VP, Director of Restoration Services
Walker Restoration Consultants
Chicago, Ill.

Related Stories

MFPRO+ News | Jul 22, 2024

6 multifamily WAFX 2024 Prize winners

Over 30 projects tackling global challenges such as climate change, public health, and social inequality have been named winners of the World Architecture Festival’s WAFX Awards.

Office Buildings | Jul 22, 2024

U.S. commercial foreclosures increased 48% in June from last year

The commercial building sector continues to be under financial pressure as foreclosures nationwide increased 48% in June compared to June 2023, according to ATTOM, a real estate data analysis firm.

Codes and Standards | Jul 22, 2024

Tennessee developers can now hire their own building safety inspectors

A new law in Tennessee allows developers to hire their own building inspectors to check for environmental, safety, and construction violations. The law is intended to streamline the building process, particularly in rapidly growing communities.

Codes and Standards | Jul 22, 2024

New FEMA rules include climate change impacts

FEMA’s new rules governing rebuilding after disasters will take into account the impacts of climate change on future flood risk. For decades, the agency has followed a 100-year floodplain standard—an area that has a 1% chance of flooding in a given year.

Construction Costs | Jul 18, 2024

Data center construction costs for 2024

Gordian’s data features more than 100 building models, including computer data centers. These localized models allow architects, engineers, and other preconstruction professionals to quickly and accurately create conceptual estimates for future builds. This table shows a five-year view of costs per square foot for one-story computer data centers. 

Sustainability | Jul 18, 2024

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.

University Buildings | Jul 17, 2024

University of Louisville Student Success Building will be new heart of engineering program

A new Student Success Building will serve as the heart of the newly designed University of Louisville’s J.B. Speed School of Engineering. The 115,000-sf structure will greatly increase lab space and consolidate student services to one location.

Healthcare Facilities | Jul 16, 2024

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.

K-12 Schools | Jul 15, 2024

A Cleveland suburb opens a $31.7 million new middle school and renovated high school

Accommodating 1,283 students in grades 6-12, the Warrensville, Ohio school complex features flexible learning environments and offers programs ranging from culinary arts and firefighting training to e-sports.

MFPRO+ News | Jul 15, 2024

More permits for ADUs than single-family homes issued in San Diego

Popularity of granny flats growing in California

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021