To promote construction of tall mass timber buildings in the U.S., the Softwood Lumber Board (SLB) and USDA Forest Service (USDA) have joined forces on a competition to showcase mass timber’s application, commercial viability, and role as a natural climate solution.
The entry period is now open for the Mass Timber Competition: Building to Net-Zero Carbon. The competition will award funds totaling $2 million to support projects that “demonstrate mass timber’s application across select building types and ability to aggressively reduce the carbon footprint of the built environment,” according to a news release.
Many jurisdictions now prohibit wood-framed buildings higher than 5-6 stories due to fire hazard concerns. The competition is part of an effort by the lumber industry to change that mindset. However, the 2021 edition of the International Building Code increased the maximum height for mass timber buildings in the U.S. to 18 stories. California, Maine, Oegon, Utah, Virginia, and Washington have adopted this standard, as have Denver and Austin, Texas.
The entry deadline is March 30, 2022, and results will be announced June 24, 2022, at the AIA Conference on Architecture. Lessons learned from the competition will be shared with the design and construction community including cost analyses, life cycle assessments, and other research results. Eligible building types include commercial, institutional, industrial, educational, mixed-use, and multifamily housing developments.
Related Stories
| Apr 26, 2012
Energy efficiency requirements heighten the importance of proper protection for roofing systems
Now more than ever, a well-insulated and well protected roof is critical in new or renovated commercial buildings.
| Apr 16, 2012
Drake joins EYP as science and technology project executive
Drake’s more than 30 years of diversified design and project delivery experience spans a broad range of complex building types.
| Feb 26, 2012
Milwaukee U-Haul facility receives LEED-CI Silver
The new elements of the facility now include: efficient lighting with day-lighting controls and occupancy sensors, a high-efficiency HVAC system used in conjunction with a newly constructed thermal envelope to help reduce energy consumption, and the installation of low-flow fixtures to reduce water consumption.
| Feb 10, 2012
Task force addresses questions regarding visually graded Southern Pine lumber
Answers address transition issues, how to obtain similar load-carrying capabilities, and why only some grades and sizes are affected at this time.
| Feb 2, 2012
Call for Entries: 2012 Building Team Awards. Deadline March 2, 2012
Winning projects will be featured in the May issue of BD+C.
| Feb 1, 2012
New ways to work with wood
New products like cross-laminated timber are spurring interest in wood as a structural material.
| Jan 26, 2012
Hendrick Construction completes Osso Restaurant in Charlotte
Designed by François Fossard, Osso's upscale interior includes tapered, twisted decorative columns and an elegant fireplace in the center of the lounge.
| Dec 20, 2011
BCA’s Best Practices in New Construction available online
This publicly available document is applicable to most building types and distills the long list of guidelines, and longer list of tasks, into easy-to-navigate activities that represent the ideal commissioning process.
| Dec 19, 2011
HGA renovates Rowing Center at Cornell University
Renovation provides state-of-the-art waterfront facility.