flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

2012 LEED for Homes Award recipients announced

2012 LEED for Homes Award recipients announced

USGBC recognizes excellence in the green residential building community at its Greenbuild Conference & Expo in San Francisco


By Posted by Tim Gregorski, Senior Editor | November 13, 2012

The U.S. Green Building Council (USGBC) has named the recipients of the 2012 LEED for Homes Awards, recognizing projects, developers and homebuilders that have demonstrated leadership in the residential green building marketplace. The awards will be presented during the Residential Summit reception on Thursday, Nov. 15, 2012, at the Greenbuild International Conference & Expo held in San Francisco. The award categories recognize innovative multi- and single-family projects, production builders, affordable housing projects and developers, an overall commitment to LEED for Homes and Project of the Year.

“This year’s leadership recipients represent a dynamic field showcasing the range of residential developments that certify under USGBC’s LEED for Homes program each year,” said Nate Kredich, vice president, Residential Market Development, USGBC. “The fact that our project of the year is an affordable housing development that achieved LEED Platinum certification is a shining example of how diversified the LEED for Homes portfolio has become.”

Winners for this year include:

  • Project of the Year – The Puyallup Longhouse’s the Place of Hidden Waters: This LEED Platinum certified housing project is a culturally and environmentally responsive new model for the Puyallup Tribe in the Pacific NW. It’s located on the Puyallup reservation on a hill overlooking the Puget Sound tide flats, which were traditional Puyallup tribal lands. The buildings are designed to emulate the rectangular, shed roofed form of a traditional Coast Salish longhouse using a variation of the modern townhouse courtyard building. Structural insulated panels with excellent air sealing for a well-insulated envelope, triple pane windows and ground source heat pumps for both domestic hot water and hydronic heating systems are some of the sustainable features.
  • Outstanding Production Builder – Clarum Communities for Cambridge Plaza: Located in Palo Alto, Calif., Cambridge Plaza is a three-story townhome project constructed by Clarum Homes that achieved a LEED Platinum rating thanks to sustainable building materials and a commitment to energy and water efficiency. Its “smart” design features include a photovoltaic system and a thermal solar hot water system using a 80 gallon pre-heat storage tank and a G.E. GeoSpring electric heat pump back up waterheater.
  • Outstanding Affordable Developer - Avesta Housing for Oak Street Lofts: This project is the first affordable multifamily building to achieve LEED Platinum in Maine. The building is a four-story, 37-unit building located in the heart of Portland's Art District. The project stands out as it incorporates many design innovations, which illustrate that even affordable housing projects, with limited capital budgets, can achievehigh rates of energy efficiency and enhanced comfort for occupants. The building achieved a preliminary energy savings of 35 percent better than ASHRAE with a 40.94 percent energy cost savings.
  • Outstanding Affordable Project – Rio Vista Apartments, Abode Communities: This is the first development in LA County to co-locate affordable housing with an educational component owned and operated by the Los Angeles Unified School District on the District’s surplus land. The LEED Platinum apartments transform a vacant parking lot into a model joint-use development addressing the needs of 50 low-income families. The site is a high-density infill, a former brownfield with existing infrastructure, and is located with access to outstanding community resources. Rio Vista is energy efficient (exceeds Title 24 by 40 percent) and includes an edible garden atop the roof with a central trellised courtyard providing a shaded outdoor space to reduce heat island effects.
  • Outstanding Commitment to LEED for Homes – McGuyer Homebuilders, Inc. (MHI): The Texas-based company is the only national-scale production homebuilder that has successfully implemented LEED for Homes across multiple communities and across multiple product offerings. MHI is a practical, profit-oriented builder who pursues LEED as a strategy to meet client needs. MHI strives to find ways to successfully compete with the publically traded homebuilding companies by offering something new and different.
  • Outstanding Multifamily Project – Specialized Real Estate Group for Eco Modern Flats: This LEED Platinum project is a gut rehab of a 96-unit market rate apartment complex built between 1968 and1972 and located in Fayetteville, Ark. The developers’ goals were to deliver a product that was not currently available in the market—modern, urban, green multifamily rental—and to save operations costs through energy and water-saving updates. In addition to the rehab itself, a blog and other informational resources were developed, and hundreds of people toured a model unit highlighting 32 sustainable strategies employed in the project.
  • Outstanding Single Family Project – Brooks Residence (architect Isabelle Duvivier): Located in Venice, Calif., the Brooks Residence is a 1,700 sq. ft. LEED Platinum home. Homeowner and architect, Isabelle Duvivier, purchased the 100-year-old home in a well-established, low-income neighborhood in order to restore it. The goal was to reduce the footprint/impact of the house on the planet through water, energy and material efficiency. Above and beyond that goal, the home designworks to restore habitats for birds, bees and butterflies and creates educational opportunities for the local community. +

Related Stories

MFPRO+ New Projects | Oct 30, 2024

BIG’s One High Line finally reaches completion in New York City’s West Chelsea neighborhood

One High Line, a luxury residential project spanning a full city block in New York’s West Chelsea neighborhood, reached completion this summer following years of delays related to investor lawsuits. 

Urban Planning | Oct 30, 2024

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.

MFPRO+ New Projects | Oct 30, 2024

Luxury waterfront tower in Brooklyn features East River and Manhattan skyline views

Leasing recently began for The Dupont, a 41-story luxury rental property along the Brooklyn, N.Y., waterfront. Located within the 22-acre Greenpoint Landing, where it overlooks the newly constructed Newtown Barge Park, the high-rise features East River and Manhattan skyline views along with 20,000 sf of indoor and outdoor communal space.

Libraries | Oct 30, 2024

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

Resiliency | Oct 29, 2024

Climate change degrades buildings slowly but steadily

While natural disasters such as hurricanes and wildfires can destroy buildings in minutes, other factors exacerbated by climate change degrade buildings more slowly but still cause costly damage.

Office Buildings | Oct 29, 2024

Editorial call for Office Building project case studies

BD+C editors are looking to feature a roundup of office building projects for 2024, including office-to-residential conversions. Deadline for submission: December 6, 2024.

Healthcare Facilities | Oct 28, 2024

New surgical tower is largest addition to UNC Health campus in Chapel Hill

Construction on UNC Health’s North Carolina Surgical Hospital, the largest addition to the Chapel Hill campus since it was built in 1952, was recently completed. The seven-story, 375,000-sf structure houses 26 operating rooms, four of which are hybrid size to accommodate additional equipment and technology for newly developed procedures. 

Multifamily Housing | Oct 28, 2024

A case for mid-rise: How multifamily housing can reshape our cities

Often referred to as “five-over-ones,” the mid-rise apartment type is typically comprised of five stories of apartments on top of a concrete “podium” of ground-floor retail. The main criticism of the “five-over-one” is that they are often too predictable.

Sports and Recreational Facilities | Oct 24, 2024

Stadium renovation plans unveiled for Boston’s National Women’s Soccer League

A city-owned 75-year-old stadium in Boston’s historic Franklin Park will be renovated for a new National Women’s Soccer League team. The park, designed by Fredrick Law Olmsted in the 1880s, is the home of White Stadium, which was built in 1949 and has since fallen into disrepair.

Laboratories | Oct 23, 2024

From sterile to stimulating: The rise of community-centric life sciences campuses

To distinguish their life sciences campuses, developers are partnering with architectural and design firms to reimagine life sciences facilities as vibrant, welcoming destinations. By emphasizing four key elements—wellness, collaboration, biophilic design, and community integration—they are setting their properties apart. 

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021