flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

2016 GIANTS 300 REPORT: Ranking the nation's largest architecture, engineering, and construction firms

2016 GIANTS 300 REPORT: Ranking the nation's largest architecture, engineering, and construction firms

Now in its 40th year, BD+C’s annual Giants 300 report ranks AEC firms by discipline and across more than 20 building sectors and specialty services.


By BD+C Staff | July 19, 2016

Photo courtesy Corgan

For 40 years, the editors of Building Design+Construction have ranked the nation's largest AEC firms as part of the Giants 300 report. Below, we present the findings of our 2016 Giants 300 Report. 

Data for our Giants 300 charts is based on information supplied by the respective firms. Firms are asked to verify the accuracy of their data.

The Construction section includes two types of statistics. The Contractors chart reflects revenues for general contracting, design-build, CM at risk, and IPD—projects where all revenues flow through the contractor. The CM Agent + PM chart lists firms that derive their revenues through fees.

In the subsequent market-specific sections (Healthcare, Data Centers, Multifamily, Government, etc.) data labeled “Construction” includes all delivery methods combined (GC, DB, CM at risk, IPD, CM agent, PM).

We'd like to thank our Giants 300 sponsors for their support of the recognition program:

 

 
       
 
       
     
       
   
     
 

 

 

Rankings By Discipline 

ARCHITECTURE GIANTS (top A and AE firms) | Read Report | Sponsored by SageGlass
ENGINEERING GIANTS (top E and EA firms) | Read Report | Sponsored by Viega
CONSTRUCTION GIANTS (top GC and CM firms) | Read Report | Sponsored by AGC of America

Rankings by Specialty

BIM REPORT | Read Report
GREEN BUILDING SECTOR GIANTS | Read ReportSponsored by Trane
RECONSTRUCTION SECTOR GIANTS | Read Report

Rankings by Building Sector

AIRPORT TERMINAL SECTOR GIANTS | Read ReportSponsored by Leidos
CONVENTION CENTER GIANTS | Read Report
COURTHOUSE SECTOR GIANTS | Read Report
CULTURAL FACILITIES GIANTS | Read Report
DATA CENTER SECTOR GIANTS | Read Report
FEDERAL GOVERNMENT GIANTS | Read Report
HEALTHCARE SECTOR GIANTS | Read Report
HOTEL SECTOR GIANTS | Read Report
INDUSTRIAL SECTOR GIANTS | Read Report
K-12 SCHOOL SECTOR GIANTS | Read Report | Sponsored by MortarNet
LOCAL GOVERNMENT GIANTS | Read Report
MILITARY SECTOR GIANTS | Read Report
MULTIFAMILY SECTOR GIANTS | Read ReportSponsored by Delta Faucet
OFFICE SECTOR GIANTS | Read Report
RELIGIOUS FACILITIES GIANTS Read Report
RETAIL SECTOR GIANTS | Read Report
SCIENCE AND TECHNOLOGY SECTOR GIANTS | Read Report
SPORTS FACILITY SECTOR GIANTS | Read Report
STATE GOVERNMENT GIANTS | Read Report
TRANSIT/TOD SECTOR GIANTS | Read Report
UNIVERSITY SECTOR GIANTS | Read Report
 

Related Stories

| Nov 2, 2010

Energy Analysis No Longer a Luxury

Back in the halcyon days of 2006, energy analysis of building design and performance was a luxury. Sure, many forward-thinking AEC firms ran their designs through services such as Autodesk’s Green Building Studio and IES’s Virtual Environment, and some facility managers used Honeywell’s Energy Manager and other monitoring software. Today, however, knowing exactly how much energy your building will produce and use is survival of the fittest as energy costs and green design requirements demand precision.

| Nov 2, 2010

Yudelson: ‘If It Doesn’t Perform, It Can’t Be Green’

Jerry Yudelson, prolific author and veteran green building expert, challenges Building Teams to think big when it comes to controlling energy use and reducing carbon emissions in buildings.

| Nov 2, 2010

Historic changes to commercial building energy codes drive energy efficiency, emissions reductions

Revisions to the commercial section of the 2012 International Energy Conservation Code (IECC)  represent the largest single-step efficiency increase in the history of the national, model energy. The changes mean that new and renovated buildings constructed in jurisdictions that follow the 2012 IECC will use 30% less energy than those built to current standards.

| Nov 1, 2010

Sustainable, mixed-income housing to revitalize community

The $41 million Arlington Grove mixed-use development in St. Louis is viewed as a major step in revitalizing the community. Developed by McCormack Baron Salazar with KAI Design & Build (architect, MEP, GC), the project will add 112 new and renovated mixed-income rental units (market rate, low-income, and public housing) totaling 162,000 sf, plus 5,000 sf of commercial/retail space.

| Nov 1, 2010

John Pearce: First thing I tell designers: Do your homework!

John Pearce, FAIA, University Architect at Duke University, Durham, N.C., tells BD+C’s Robert Cassidy  about the school’s construction plans and sustainability efforts, how to land work at Duke, and why he’s proceeding with caution when it comes to BIM.

| Nov 1, 2010

Vancouver’s former Olympic Village shoots for Gold

The first tenants of the Millennium Water development in Vancouver, B.C., were Olympic athletes competing in the 2010 Winter Games. Now the former Olympic Village, located on a 17-acre brownfield site, is being transformed into a residential neighborhood targeting LEED ND Gold. The buildings are expected to consume 30-70% less energy than comparable structures.

| Oct 27, 2010

Grid-neutral education complex to serve students, community

MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.

| Oct 21, 2010

GSA confirms new LEED Gold requirement

The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.

| Oct 18, 2010

World’s first zero-carbon city on track in Abu Dhabi

Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021