flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

2016 GIANTS 300 REPORT: Ranking the nation's largest architecture, engineering, and construction firms

2016 GIANTS 300 REPORT: Ranking the nation's largest architecture, engineering, and construction firms

Now in its 40th year, BD+C’s annual Giants 300 report ranks AEC firms by discipline and across more than 20 building sectors and specialty services.


By BD+C Staff | July 19, 2016

Photo courtesy Corgan

For 40 years, the editors of Building Design+Construction have ranked the nation's largest AEC firms as part of the Giants 300 report. Below, we present the findings of our 2016 Giants 300 Report. 

Data for our Giants 300 charts is based on information supplied by the respective firms. Firms are asked to verify the accuracy of their data.

The Construction section includes two types of statistics. The Contractors chart reflects revenues for general contracting, design-build, CM at risk, and IPD—projects where all revenues flow through the contractor. The CM Agent + PM chart lists firms that derive their revenues through fees.

In the subsequent market-specific sections (Healthcare, Data Centers, Multifamily, Government, etc.) data labeled “Construction” includes all delivery methods combined (GC, DB, CM at risk, IPD, CM agent, PM).

We'd like to thank our Giants 300 sponsors for their support of the recognition program:

 

 
       
 
       
     
       
   
     
 

 

 

Rankings By Discipline 

ARCHITECTURE GIANTS (top A and AE firms) | Read Report | Sponsored by SageGlass
ENGINEERING GIANTS (top E and EA firms) | Read Report | Sponsored by Viega
CONSTRUCTION GIANTS (top GC and CM firms) | Read Report | Sponsored by AGC of America

Rankings by Specialty

BIM REPORT | Read Report
GREEN BUILDING SECTOR GIANTS | Read ReportSponsored by Trane
RECONSTRUCTION SECTOR GIANTS | Read Report

Rankings by Building Sector

AIRPORT TERMINAL SECTOR GIANTS | Read ReportSponsored by Leidos
CONVENTION CENTER GIANTS | Read Report
COURTHOUSE SECTOR GIANTS | Read Report
CULTURAL FACILITIES GIANTS | Read Report
DATA CENTER SECTOR GIANTS | Read Report
FEDERAL GOVERNMENT GIANTS | Read Report
HEALTHCARE SECTOR GIANTS | Read Report
HOTEL SECTOR GIANTS | Read Report
INDUSTRIAL SECTOR GIANTS | Read Report
K-12 SCHOOL SECTOR GIANTS | Read Report | Sponsored by MortarNet
LOCAL GOVERNMENT GIANTS | Read Report
MILITARY SECTOR GIANTS | Read Report
MULTIFAMILY SECTOR GIANTS | Read ReportSponsored by Delta Faucet
OFFICE SECTOR GIANTS | Read Report
RELIGIOUS FACILITIES GIANTS Read Report
RETAIL SECTOR GIANTS | Read Report
SCIENCE AND TECHNOLOGY SECTOR GIANTS | Read Report
SPORTS FACILITY SECTOR GIANTS | Read Report
STATE GOVERNMENT GIANTS | Read Report
TRANSIT/TOD SECTOR GIANTS | Read Report
UNIVERSITY SECTOR GIANTS | Read Report
 

Related Stories

| Oct 13, 2010

Editorial

The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.

| Oct 13, 2010

Test run on the HP Z200 SFF Good Value in a Small Package

Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.

| Oct 13, 2010

Prefab Trailblazer

The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.

| Oct 13, 2010

Thought Leader

Sundra L. Ryce, President and CEO of SLR Contracting & Service Company, Buffalo, N.Y., talks about her firm’s success in new construction, renovation, CM, and design-build projects for the Navy, Air Force, and Buffalo Public Schools.

| Oct 13, 2010

Hospital tower gets modern makeover

The Wellmont Holston Valley Medical Center in Kingsport, Tenn., expanded its D unit, a project that includes a 243,443-sf addition with a 12-room operating suite, a 36-bed intensive care unit, and an enlarged emergency department.

| Oct 13, 2010

Modern office design accentuates skyline views

Intercontinental|Exchange, a Chicago-based financial firm, hired design/engineering firm Epstein to create a modern, new 31st-floor headquarters.

| Oct 13, 2010

Hospital and clinic join for better patient care

Designed by HGA Architects and Engineers, the two-story Owatonna (Minn.) Hospital, owned by Allina Hospitals and Clinics, connects to a newly expanded clinic owned by Mayo Health System to create a single facility for inpatient and outpatient care.

| Oct 13, 2010

Biloxi’s convention center bigger, better after Katrina

The Mississippi Coast Coliseum and Convention Center in Biloxi is once again open for business following a renovation and expansion necessitated by Hurricane Katrina.

| Oct 13, 2010

Tower commemorates Lewis & Clark’s historic expedition

The $4.8 million Lewis and Clark Confluence Tower in Hartford, Ill., commemorates explorers Meriwether Lewis and William Clark at the point where their trek to the Pacific Ocean began—the confluence of the Mississippi and Missouri Rivers.

| Oct 13, 2010

Maryland replacement hospital expands care, changes name

The new $120 million Meritus Regional Medical Center in Hagerstown, Md., has 267 beds, 17 operating rooms with high-resolution video screens, a special care level II nursery, and an emergency room with 53 treatment rooms, two trauma rooms, and two cardiac rooms.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021