DESIGN/CONSTRUCTION ASPECTS
Unusual owner/client requirements
Inventive use of materials, products, or systems
Structural engineering solutions
M/E/P innovations, fresh approaches
Energy/environment breakthroughs
Sustainable design, green bldg. design, LEED
Craftsmanship, detailing, elegance of execution
Use of innovative technology, methods, tools
Cost/budget issues – and evidence of resolution
Overall design & construction quality
Security issues, unusual approaches, results
Social or cultural relevance of project
Other measures of success (jobs, neighhood renewal, etc.)
Innovative construction methods, approaches
Unusual scheduling issues, timing demands, and solutions
Metrics of satisfaction (energy savings, $$$, etc.)
Project complexity – Was it challenging? In what way?
SUMMARY: Did this project push the envelope? How?
PROJECT EXECUTION
Involvement of surrounding community, neighbors, affected stakeholders
Involvement of public officials, public agencies
Attention to surrounding environment, historic areas, community sensitivities
Attention to environmental issues: wetlands, open space, recreation areas, etc.
Overcoming unanticipated changes in the program
Overcoming natural disaster (flood, hurricane), man-made disaster (loss of power supply), materials shortages
Unusual solutions to budget restrictions
Unusual solutions to keep project schedule on time
Special social or cultural relevance of project
SUMMARY: Did the project perform a public good?
Related Stories
Reconstruction Awards | Nov 16, 2016
BD+C's 2016 Reconstruction Award Winners
St. Patrick’s Cathedral, Lovejoy Wharf, and the Bay Area Metro Center are just a few of the projects recognized as 2016 Reconstruction Award winners.
Reconstruction Awards | Nov 16, 2016
Reconstruction Awards: The Renwick Gallery of The Smithsonian American Art Museum
The renovation restored two long-concealed vaulted ceilings in the second-floor galleries and recreated the original 19th-century window configuration.
Reconstruction Awards | Nov 16, 2016
Reconstruction Awards: Massachusetts Maritime Academy
The two-story “overbuild” employed block and plank construction with drag strut detailing to connect it to the existing building.
Reconstruction Awards | Nov 16, 2016
Reconstruction Awards: The Masonic Temple
The building team suspended a new eighth-floor mezzanine and added 18 9x15-foot windows to the north, south, and west façades.
Reconstruction Awards | Nov 16, 2016
Reconstruction Awards: San Francisco War Memorial Veterans Building
The building team used a system of rocking concrete shear walls, which eliminated the need for deep foundations and reduced the shear force on each wall.
Reconstruction Awards | Nov 16, 2016
Reconstruction Awards: Arc at Old Colony
The Arc at Old Colony's vintage floor plans, voluminous lobby, and myriad elevators were perfect for redevelopment as a historically charming residential building.
Reconstruction Awards | Nov 16, 2016
Reconstruction Awards: Noble Chapel
In May 2013 the 124-year-old Noble Chapel, suffered a three-alarm fire that almost completely destroyed its 1937 crematorium.
Reconstruction Awards | Nov 16, 2016
Reconstruction Awards: Bay Area Metro Center
The structure’s 60,000-sf floor plates made the interior dark and foreboding, and BAHA wanted to improve working conditions for its employees and tenants.