DESIGN/CONSTRUCTION ASPECTS
Unusual owner/client requirements
Inventive use of materials, products, or systems
Structural engineering solutions
M/E/P innovations, fresh approaches
Energy/environment breakthroughs
Sustainable design, green bldg. design, LEED
Craftsmanship, detailing, elegance of execution
Use of innovative technology, methods, tools
Cost/budget issues – and evidence of resolution
Overall design & construction quality
Security issues, unusual approaches, results
Social or cultural relevance of project
Other measures of success (jobs, neighhood renewal, etc.)
Innovative construction methods, approaches
Unusual scheduling issues, timing demands, and solutions
Metrics of satisfaction (energy savings, $$$, etc.)
Project complexity – Was it challenging? In what way?
SUMMARY: Did this project push the envelope? How?
PROJECT EXECUTION
Involvement of surrounding community, neighbors, affected stakeholders
Involvement of public officials, public agencies
Attention to surrounding environment, historic areas, community sensitivities
Attention to environmental issues: wetlands, open space, recreation areas, etc.
Overcoming unanticipated changes in the program
Overcoming natural disaster (flood, hurricane), man-made disaster (loss of power supply), materials shortages
Unusual solutions to budget restrictions
Unusual solutions to keep project schedule on time
Special social or cultural relevance of project
SUMMARY: Did the project perform a public good?
Related Stories
Reconstruction Awards | Nov 16, 2015
Lumberyard turned into Chicago charter school
While the existing structures were in poor condition, the Building Team preserved and restored 75% of the spaces and incorporated historic elements in the final design of the Intrinsic School on Chicago's Northwest side.
Reconstruction Awards | Nov 12, 2015
Columbia Grammar and Preparatory School grows with the times
The 251-year-old NYC school was a design-build project that overcame issues like tight space and zoning appeals during its redevelopment.
Reconstruction Awards | Nov 10, 2015
Restoration of the Whitney Building provides hope for Detroit
Four years ago, Whitney Partners purchased the 253,000-sf Whitney for $3.3 million. Their mission was to turn the 19-story structure into a mixed-use hotel, rental apartment, and retail center that would serve as a reminder of more prosperous times in Detroit’s past.
Reconstruction Awards | Nov 9, 2015
University of Chicago uses space economically with Saieh Hall
The five-story, 100,000-sf seminary was converted into a modern education facility that would be fully integrated into the university’s Hyde Park campus. The project demonstrated the university’s commitment to finding a balance between new construction and adaptive reuse of historically significant buildings.
Reconstruction Awards | Nov 9, 2015
King of kings: Classic brooklyn movie theater stages a return engagement
The theater, which withstood vacancy, neglect and vandalism, has been redeveloped with a goal: balance preservation with the creation of a modern performance space.