The healthcare sector faces grave financial uncertainties, even with the June 28 Supreme Court decision upholding the Affordable Care Act. To help us sort out the factors impacting this lucrative segment, we turned to Philip Tobey, a Fellow of both the AIA and the American College of Healthcare Architects and Senior Vice President with SmithGroupJJR.
“Health industry providers legitimately expect significant efficiencies and lower costs for design and construction services, to go along with the economies that they themselves face with tighter and value-based reimbursement terms under health reform,” says Tobey, a member of Building Design+Construction’s Editorial Board.
In other words, AEC firms are going to have to share some of their healthcare clients’ pain. The drive for greater operational efficiency and lower cost in healthcare will be unrelenting, with bundled payments and shared savings models in lieu of traditional fee-for-service reimbursement forcing healthcare providers to eliminate wasteful practices.
Tobey sees three major trends emerging: 1) growing emphasis on ambulatory care, 2) medical systems integration, and 3) the “bundling/unbundling” of services.
SCROLL DOWN FOR GIANTS 300 TOP 25 AEC HEALTHCARE FIRM RANKINGS
1. PUSHING AMBULATORY CARE FACILITIES OUT
“The trend to push services out of the hospital into ambulatory settings will only intensify,” says Tobey. He notes, however, that there will be an “overwhelming need” to expand the front end of delivery—primary care, urgent care, and emergency departments—and to rationalize procedural and imaging resource capacity. At the same time, freestanding surgery and imaging centers may not be as prevalent in the future, and may need to be consolidated into larger hospital centers.
“Hospitals are not going away,” says Tobey, even though inpatient volumes are predicted to fall 5%, vs. 30% growth in outpatient volume. The sheer increased volume of patients, especially as baby boomers age, will inevitably drive up acute-care admissions. In the face of these seemingly countervailing trends, says Tobey, “The need to renovate outdated or obsolete facilities will be a strong driver in the healthcare business.”
2. INTEGRATING MEDICAL SYSTEMS MORE TIGHTLY
Tobey says the need for greater efficiency and ever-higher quality of care are not new goals for medical care or medical design, but hospital systems are being encouraged further by healthcare reform to streamline processes, with more mergers, acquisitions, and hospital-physician staff integrations on the horizon. “The industry’s even been talking about including services like long-term care and home care into this integrated approach,” he says.
Although there will always be a need for acute-care hospitals, Tobey sees a possible shift toward more community-based portals. As health systems continue to integrate, they will rely more and more on treatment venues outside the hospital to provide patients with coordinated preventive care and treatment for chronic conditions.
The IT component of hospital systems is already a natural for systems integration. “Providing the right information where it’s needed is essential for clinical care,” says Tobey, who foresees greater implementation of electronic medical records.
Are hospitals ready for lean?
“Everybody’s talking about it, but many hospital owners are wary of taking on lean,” says SmithGroupJJR’s Phil Tobey, FAIA, FACHA, whose firm is on the team for Sutter Health’s California Pacific Medical Center in San Francisco, the largest lean project in the U.S. “You have Sutter, which is totally lean, then you have clients who tell us not even to mention the word,” he says. “Others are applying the basic principles of lean construction without carrying the heavy weight of all that lean entails.”
Applying Lean/Six Sigma principles to healthcare, says Jeffrey C. Stouffer, AIA, a Principal with HKS, would result in “measurable outcomes and even risk sharing as part of the design and construction process” by eliminating unnecessary waste in construction and operations and increasing staff efficiency and safety, while reducing energy and staff costs for the hospital.
3. UNBUNDLING/BUNDLING OF HEALTHCARE SERVICES
Healthcare providers are “decanting” non-core functions—services like pharmacy, lab support, materials handling, and environmental management—from the mother ship into cheaper B-occupancy buildings. “Anything soft, anything that’s not high-tech, is being taken out,” says Tobey. “That’s the unbundling.”
However, once the unbundling of less-intense services has been accomplished, says Tobey, some hospital systems are opting to bundle the remaining hospital space, by placing beds back on top of the structure’s base diagnostic and support block, instead of having the traditional diagnostic/support chassis with attached nursing wings.
“You unbundle and decant the support services, then take the remaining high-intensity hospital base and put the beds on top,” says Tobey. A recent study for a 100-bed community hospital found that following such a scheme would result in 39% savings in construction costs per bed. +
TOP 25 HEALTHCARE SECTOR ARCHITECTURE FIRMS
Rank | Company | 2011 Healthcare Revenue ($) |
1 | HDR Architecture | 205,200,000 |
2 | HKS | 124,736,964 |
3 | Perkins+Will | 122,895,589 |
4 | Cannon Design | 121,000,000 |
5 | NBBJ | 116,401,000 |
6 | HOK | 102,695,248 |
7 | SmithGroupJJR | 74,600,000 |
8 | RTKL Associates | 68,421,405 |
9 | Perkins Eastman | 63,700,000 |
10 | Hammel, Green and Abrahamson | 61,900,000 |
11 | ZGF Architects | 54,338,355 |
12 | Heery International | 48,583,000 |
13 | HMC Architects | 42,715,899 |
14 | PageSoutherlandPage | 38,670,000 |
15 | IBI Group | 37,349,554 |
16 | Skidmore, Owings & Merrill | 33,950,000 |
17 | FKP Architects | 33,947,200 |
18 | Gresham, Smith and Partners | 32,876,981 |
19 | FreemanWhite | 28,500,000 |
20 | RBB Architects | 28,500,000 |
21 | LEO A DALY | 26,900,325 |
22 | BSA LifeStructures | 26,323,759 |
23 | EwingCole | 24,000,000 |
24 | KMD Architects | 20,161,678 |
25 | Ennead Architects | 19,875,000 |
TOP 25 HEALTHCARE SECTOR ENGINEERING FIRMS
Rank | Company | 2011 Healthcare Revenue ($) |
1 | AECOM Technology Corp. | 314,000,000 |
2 | Stantec | 109,980,000 |
3 | URS Corp. | 41,298,918 |
4 | Smith Seckman Reid | 38,300,000 |
5 | Jacobs | 32,950,000 |
6 | Parsons Brinckerhoff | 30,600,000 |
7 | KPFF Consulting Engineers | 28,000,000 |
8 | TTG|TMAD TAYLOR & GAINES | 27,677,900 |
9 | Mazzetti Nash Lipsey Burch | 24,988,296 |
10 | Degenkolb Engineers | 22,454,591 |
11 | Allen & Shariff | 21,577,769 |
12 | Bard, Rao + Athanas Consulting Engineers | 18,000,000 |
13 | ccrd partners | 17,100,000 |
14 | Atkins North America | 16,173,240 |
15 | AKF Group | 15,200,000 |
16 | KJWW Engineering Consultants | 14,607,369 |
17 | Syska Hennessy Group | 14,462,238 |
18 | Zak Companies | 13,882,705 |
19 | TLC Engineering for Architecture | 13,874,283 |
20 | Dewberry | 10,613,564 |
21 | Thornton Tomasetti | 9,860,000 |
22 | Sparling | 9,658,825 |
23 | Walter P Moore | 7,718,326 |
24 | M/E Engineering | 7,700,000 |
25 | Rutherford & Chekene | 7,650,000 |
TOP 25 HEALTHCARE SECTOR CONSTRUCTION FIRMS
Rank | Company | 2011 Healthcare Revenue ($) |
1 | Turner Corporation, The | 1,807,050,000 |
2 | McCarthy Holdings | 1,231,000,000 |
3 | Gilbane Building Co. | 1,091,777,000 |
4 | Clark Group | 1,067,411,678 |
5 | PCL Construction Enterprises | 869,130,091 |
6 | Brasfield & Gorrie | 833,522,003 |
7 | Skanska USA | 724,418,042 |
8 | JE Dunn Construction | 636,206,095 |
9 | Robins & Morton | 599,073,000 |
10 | DPR Construction | 588,199,172 |
11 | Whiting-Turner Contracting Co., The | 464,779,240 |
12 | Mortenson | 455,620,000 |
13 | Lend Lease | 434,626,482 |
14 | Hensel Phelps Construction | 425,760,000 |
15 | Suffolk Construction | 420,343,563 |
16 | Pepper Construction Group | 415,064,000 |
17 | Tutor Perini Corp. | 409,583,000 |
18 | Balfour Beatty US | 389,253,907 |
19 | Hunt Construction Group | 369,500,000 |
20 | Hoar Construction | 313,937,000 |
21 | Flintco | 291,400,000 |
22 | Layton Construction | 287,300,000 |
23 | HBE Corp. | 279,200,000 |
24 | Power Construction | 275,000,000 |
25 | Swinerton | 274,627,440 |
Related Stories
Engineers | Jun 14, 2023
The high cost of low maintenance
Walter P Moore’s Javier Balma, PhD, PE, SE, and Webb Wright, PE, identify the primary causes of engineering failures, define proactive versus reactive maintenance, recognize the reasons for deferred maintenance, and identify the financial and safety risks related to deferred maintenance.
University Buildings | Jun 14, 2023
Calif. State University’s new ‘library-plus’ building bridges upper and lower campuses
A three-story “library-plus” building at California State University, East Bay (CSUEB) that ties together the upper and lower campuses was recently completed. The 100,977-sf facility, known as the Collaborative Opportunities for Research & Engagement (“CORE”) Building, is one of the busiest libraries in the CSU system. The previous library served 1.2 million visitors annually.
Higher Education | Jun 14, 2023
Designing higher education facilities without knowing the end users
A team of architects with Page offers five important factors to consider when designing spaces for multiple—and potentially changing—stakeholders.
Resiliency | Jun 14, 2023
HUD offers $4.8 billion in funding for green and resilient building retrofit projects
The Department of Housing and Urban Development (HUD) recently released guidelines for its Green and Resilient Retrofit Program (GRRP) that has $4.8 billion for funding green projects.
Arenas | Jun 14, 2023
A multipurpose arena helps revitalize a historic African American community in Georgia
In Savannah, Ga., Enmarket Arena, a multipurpose arena that opened last year, has helped revitalize the city’s historic Canal District—home to a largely African American community that has been historically separated from the rest of downtown.
Building Materials | Jun 14, 2023
Construction input prices fall 0.6% in May 2023
Construction input prices fell 0.6% in May compared to the previous month, according to an Associated Builders and Contractors analysis of the U.S. Bureau of Labor Statistics’ Producer Price Index data released today. Nonresidential construction input prices declined 0.5% for the month.
Mass Timber | Jun 13, 2023
Mass timber construction featured in two-story mixed-use art gallery and wine bar in Silicon Valley
The Edes Building, a two-story art gallery and wine bar in the Silicon Valley community of Morgan Hill, will prominently feature mass timber. Cross-laminated timber (CLT) and glulam posts and beams were specified for aesthetics, biophilic properties, and a reduced carbon footprint compared to concrete and steel alternatives.
Mixed-Use | Jun 12, 2023
Goettsch Partners completes its largest China project to date: a mixed-used, five-tower complex
Chicago-based global architecture firm Goettsch Partners (GP) recently announced the completion of its largest project in China to date: the China Resources Qianhai Center, a mixed-use complex in the Qianhai district of Shenzhen. Developed by CR Land, the project includes five towers totaling almost 472,000 square meters (4.6 million sf).
Engineers | Jun 12, 2023
Stantec to acquire Environmental Systems Design
Stantec, a global leader in sustainable design and engineering, has signed an agreement to acquire Environmental Systems Design, Inc. (ESD), a 270-person engineering firm headquartered in Chicago. Founded in 1967, ESD has built a reputation for excellence and innovation in high-performance design with a roster of industry-leading clients. The terms of the transaction are not disclosed.
University Buildings | Jun 9, 2023
Cornell’s new information science building will foster dynamic exchange of ideas and quiet, focused research
Construction recently began on Cornell University’s new 135,000-sf building for the Cornell Ann S. Bowers College of Computing and Information Science (Cornell Bowers CIS). The structure will bring together the departments of Computer Science, Information Science, and Statistics and Data Science for the first time in one complex.