This September, the 21,000-seat Little Caesars Arena is scheduled to open in downtown Detroit. The $732.6 million arena will be the new homes to the Detroit Red Wings professional hockey team and the Detroit Pistons basketball team.
The Red Wings is owned by Illitch Holdings, whose Olympia Entertainment division will operate the arena, and whose other holdings include the Detroit Tigers baseball team and the Little Caesars pizza chain.
The eight-story arena, owned by the Downtown Development Authority, will anchor The District Detroit, a 50-block, $1.2 billion, 650,000-sf revitalization project that, when completed, will energize five neighborhoods—Columbia Street, Columbia Park, Woodward Square, Wildcat Corner, and Case Park Village—with new businesses, parks, restaurants, bars, offices, retail, and residential spaces. The District’s event destinations will include six theaters and three multi-use sports facilities.
A unique glass-roofed concourse will connect the arena to the offices and shops around it.
Little Caesars is expanding its headquarters in the District with a new $150 million, nine-story, 234,000-sf office building, the first newly built global headquarters in Detroit in a decade. (Blaze Contracting is this building’s GC. Its completion is expected next year.)
To drum up interest in The District Detroit—which is projected to generate $2.1 billion in local economic impact and 1,100 new permanent jobs—Olympia partnered with Detroit-based Zoyes Creative Group to create The District Detroit Preview Center, whose main feature is two large 3D printed models: one of the arena and one of the District.
The arena is the centerpiece of The District Detroit, a revitalization of 50 blocks in downtown Detroit that will add 650,000 sf of new offices, retail, residential, sports and entertainment space. Image: Stratasys Direct Manufacturing
These are among the most intricately detailed 3D printed models ever created. They include light columns, office interiors, vehicles, and—the piece de resistance—a representation of every fan who would be seated in the arena at capacity.
Zoyes uses a Fortus 450mc 3D production system printer. But it quickly realized that it needed help to complete this project on time. So it hired Stratasys Direct Manufacturing, based in Valencia, Calif., whose arsenal includes a Fortus 900mc 3D printer, to assist in the concept modeling.
“No other company would have been able to jump on board as quickly as [Stratasys] did,” says Rich Rozeboom, who directs Zoyes’s imaging department.
The decision to create such elaborate 3D models “changed everything,” says Tom Wilson, Olympia’s president and CEO. Olympia’s original plan was that it would take six months to complete the models, after which it would start selling suites within the arena. But Zoyes and Stratasys completed the suite models in 40 days. “That changed all of our methods, all of our success models,” says Wilson.
He adds “3D printing makes the arena come to life just by making it real. That model puts you in real Detroit.”
The Building Team for the Little Caesars Arena includes HOK (designer), Barton Marlow/Hunt/White (GCs), Magnusson Klemenic Associates (SE), and Smith Seckman Reid (services engineer). A live webcam of the construction can be viewed here.
Related Stories
Sports and Recreational Facilities | Jul 17, 2019
FC Cincinnati unveils Populous-designed West End Stadium
The $250 million stadium is being privately funded by the team’s ownership group.
Sports and Recreational Facilities | Jun 27, 2019
Foster + Partners unveils design of wooden boathouse for Row New York
The project will sit on the banks of the Harlem River in Sherman Creek Park.
Sports and Recreational Facilities | Jun 19, 2019
Have a Coke and a smile: New Coca-Cola Arena in Dubai is on cutting edge of arena design
It is being called the only venue of its kind between Istanbul and Singapore that can host events throughout the year.
Sports and Recreational Facilities | May 29, 2019
HOK and SAP explore the future of eSports
Flexibility and connectivity between the digital and physical space are key.
Sports and Recreational Facilities | May 24, 2019
Beverly Hills’ La Cienega Park to be redesigned by Johnson Favaro
The park will include new indoor and outdoor space.
Sports and Recreational Facilities | May 9, 2019
Plainfield, Ill., recreation center projected to achieve the Passive House Institute US PHIUS+ Source Zero certification
Design-build firm Wight & Company completed the building.
Sports and Recreational Facilities | Apr 24, 2019
MLS stadium design unveiled for St. Louis
Plans capitalize on league’s plans to expand.
Sports and Recreational Facilities | Apr 12, 2019
New ballpark is another draw for thriving downtown in Summerlin, Nev.
Developer Howard Hughes views the stadium as an essential piece to this master-planned community’s growth.
Sports and Recreational Facilities | Apr 4, 2019
Texas Rangers’ Globe Life Field progresses toward its 2020 completion date
The stadium will be the cornerstone of the Texas Live! Development.
Sports and Recreational Facilities | Mar 28, 2019
This will be the Western Hemisphere’s first purpose-built eSports arena
Populous is designing the facility.