flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

45-story tower planned for Miami Worldcenter

Mixed-Use

45-story tower planned for Miami Worldcenter

Pickard Chilton Architects will design the 600,000-sf 110 10th Street.


By David Malone, Associate Editor | May 23, 2017

Rendering courtesy of Hines

Miami Worldcenter occupies 27 acres in the heart of downtown Miami and is one of the largest private real estate developments currently underway in the U.S. The newest planed addition to Miami Worldcenter is 110 10th Street, a 45-story, 600,000-sf office-led mixed-use tower developed by Hines.

In addition to its Class A office space, the tower, which will be designed by Pickard Chilton Architects, will provide high-street retail. The tower represents the first Class A office building of scale constructed in Miami’s Central Business District in eight years. It will rise between northeast 1st and 2nd Avenues and northeast 9th and 10th Streets, adjacent to Miami Worldcenter’s 360,000 sf high-street retail promenade.

“It has been nearly a decade since Miami has received an office tower of this size and scale. We strongly believe that the quality, location and accessibility of this building will be appealing to a wide range of tenants,” says Hines Senior Managing Director Michael Harrison in a release.

110 10th Street and Miami Worldcenter will link Miami’s Central Business District with its Arts & Entertainment District. Miami Worldcenter will include retail, hospitality, residential, and commercial space when completed. The first phase is currently under construction and includes high-street retail, a 50-story Paramount luxury condominium, and a Class A rental apartment building.

Related Stories

High-rise Construction | Sep 18, 2019

Central Park Tower tops out in New York City

The building will be the tallest residential skyscraper in the world.

AEC Innovators | Aug 27, 2019

7 AEC industry disruptors and their groundbreaking achievements

From building prefab factories in the sky to incubating the next generation of AEC tech startups, our 2019 class of AEC Innovators demonstrates that the industry is poised for a shakeup. Meet BD+C’s 2019 AEC Innovators.

Museums | Jul 29, 2019

A new museum debuts inside the Empire State Building

A $165 million, 10,000-sf museum opened on the second floor of the Empire State Building in New York City, completing the second of a four-phase “reimagining” of that building’s observatory experience, which draws four million visitors annually.

High-rise Construction | Jul 25, 2019

Could this 500 foot, Bjarke Ingels-designed observation tower rise in San Diego?

The tower would be part of the $2.4 billion Seaport San Diego project.

Building Tech | Jun 26, 2019

Modular construction can deliver projects 50% faster

Modular construction can deliver projects 20% to 50% faster than traditional methods and drastically reshape how buildings are delivered, according to a new report from McKinsey & Co.

High-rise Construction | Apr 11, 2019

Top new skyscrapers for 2019: Salesforce Tower named best worldwide

The San Francisco tower was recognized for its innovations in seismic engineering and a design that "gives back" to the community. 

High-rise Construction | Apr 10, 2019

*Updated* A Tulip is ready to bloom in London

Designed by Foster + Partners, the Tulip will rise 1,001 feet and be a new cultural and tourist attraction.

High-rise Construction | Mar 4, 2019

Goettsch Partners' tallest tower ever tops out in China

The tower will become the tallest in Nanning, China upon completion.

boombox1
boombox2
native1

More In Category




Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021