flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

47-story residential and office building set for San Francisco’s new ‘Hub’

Mixed-Use

47-story residential and office building set for San Francisco’s new ‘Hub’

Solomon Cordwell Buenz designed the project.


By David Malone, Asociate Editor | March 9, 2021
30 Van Ness aerial

All renderings courtesy SCB

30 Van Ness, a new mixed-use office and condominium tower, has recently been unveiled by Solomon Cordwell Buenz. The 824,000-sf tower will be located in San Francisco’s new “Hub,” an area created by the confluence of commercial, civic, and cultural uses at the corner of Market and Van Ness.

The all-electric building, which is targeting LEED Platinum, will be clad in linen-hued panels with deep, bronze-toned window surrounds. The facade will feature a prominently chiseled corner and be detailed with delicate twists. 

 

30 Van Ness podium

 

A nine-story podium will comprise 234,000 sf of open office space and be surrounded by walls of electrochromic glass. The office space will feature large, open floor plates with floor-to-floor heights of 14 feet, 6 inches. Each podium level will include a large outdoor landscaped terrace and a high-performance, fresh air circulating mechanical system.

Guests will enter the podium under the sculptural “Altos” canopy and be welcomed by the office lobby, an expansive multi-use space closely connected to the neighborhood outside through double-height glazing. Atop the podium, the residential tower will include 333 condominium units, beginning on the 11th floor, ranging from studios to three-bedrooms. Featured on the top floors will be six units with large private terraces. The 10th floor will serve as the amenity floor for the residences with a focus on wellness and catering to the creative.

 

30 Van Ness lobby entrance

 

The project will also give back over 3,000 sf for a public outdoor space as well as provide a 5,000 sf multi-purpose performance space, stadium-like seating, and micro-retail kiosks at the corner of Van Ness and Market.

The project is slated for completion in 2025.

Tags

Related Stories

Mixed-Use | Sep 7, 2020

Google proposes 40-acre redevelopment that includes nearly 2,000 housing units

Lendlease will manage the design and construction, as a partner in a multi-development deal struck last year between the two companies.

Mixed-Use | Sep 3, 2020

10 Design will redevelop the Nanjing Dajiaochang Airport

The old military airport will become a contemporary mixed-use destination.

Mixed-Use | Aug 17, 2020

New Sydney towers will have the world’s first AI-driven facade system

SOM and Fender Katsalidis are designing the project.

Mixed-Use | Aug 4, 2020

San Jose’s new tallest building tops out

Steinberg Hart designed the project.

Mixed-Use | Jul 27, 2020

$92 million reconstruction of St. Petersburg Municipal Pier completes

Rogers Partners, ASD | SKY, and landscape architect Ken Smith Workshop designed the project.

Mixed-Use | Jul 22, 2020

Skanska selects Pickard Chilton to design innovative office tower in Bellevue, Wash.

The 800,000-gsf mixed-use project is located at 10660 NE 8th Street.

Mixed-Use | Jul 21, 2020

Phase one of The Orbit masterplan detailed for Innisfil, Ontario

Partisans is designing the project.

Mixed-Use | Jul 20, 2020

J. Small Investments, Lyda Hill Philanthropies have unveiled plans for a 23-acre mixed-use development in Dallas

The vacant campus was purchased from ExxonMobil Oil Corporation in 2015.

Mixed-Use | Jul 17, 2020

Ryan Companies breaks ground on 122-acre Highland Bridge redevelopment in St. Paul, Minn.

The community’s goal is to provide 100% renewable energy to its houses and businesses.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021