flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

5 building projects that put the 'team' in teamwork

5 building projects that put the 'team' in teamwork

The 2013 Building Team Award winners exemplify excellence in team collaboration. 


By BD+C Editors | June 12, 2013
The Georgia Tech Carbon-Neutral Energy Solutions Laboratory was the lone Platinu
The Georgia Tech Carbon-Neutral Energy Solutions Laboratory was the lone Platinum Award winner in the 2013 Building Team Awards competition.
This article first appeared in the BD+C June 2013 issue of BD+C.
The BD+C editors proudly present the winners of the 2013 Building Team Awards. Now in its 16th year, the Building Team Awards program honors commercial building projects that set the standard of excellence in design and construction, while meeting the needs of the owner, the occupant, and the community—all of which could not be accomplished without the successful collaboration of the Building Team.
 
 
 
 
 
 
 
 
 
 
 

Platinum Award Winner—Georgia Tech Carbon-Neutral Energy Solutions (CNES) Laboratory

Building Team cooperation and expertise help Georgia Tech create a LEED Platinum building for energy science. Read the article.
 
 
 
 

Gold Award Winner—Roosevelt University Wabash Building, Chicago

Roosevelt University builds a 32-story tower to satisfy students’ needs for housing, instruction, and recreation. Read the article.
 
 
 
 

Gold Award Winner—Endo Health Solutions, Malvern, Pa.

Working together for the first time, a unified Building Team executes a large pharmaceutical office program in just 12 months—while meeting the needs of two demanding clients. Read the article.
 
 
 
 

Silver Award Winner—Old Town School of Folk Music, East Building, Chicago

A LEED Gold project enhances a busy Chicago neighborhood, meeting ambitious criteria for acoustical design and adaptability. Read the article.
 
 
 
 

Bronze Award Winner—Vernon S. Broyles Jr. Leadership Center, Decatur, Ga.

A renovation/addition project at Columbia Theological Seminary unites a historic residence hall with a modern classroom facility. Read the article.
 
 
 

 

2013 Building Team Awards Judges

 

 
2013 Building Team Awards jury members (left to right): Peter Rumpf, LEED AP; Daniel Hughes; Cierine M. Nicolas, PE, LEED AP; Meggan M. Lux, AIA, NCARB, LEED AP BD+C; Terry Fielden, LEED AP BD+C. The editors of BD+C (not pictured) also participated in the judging. The jury was held April 24 at the Cliff Dwellers Club, Chicago, founded in 1907 by author Hamlin Garland (in portrait).
 
 
Daniel Hughes
Senior Manager, Facility Operations
Discover
Riverwoods, Ill.
 
Terry Fielden, LEED AP BD+C
Director of K-12 Education
International Contractors, Inc.
Elmhurst, Ill.
 
Meggan M. Lux, AIA, NCARB, 
LEED AP BD+C
Partner
UrbanWorks
Chicago
 
Cierine M. Nicolas, PE, LEED AP
Vice President
Environmental Systems Design, Inc.
Chicago
 
Peter Rumpf, LEED AP
Integrated Construction Manager
Mortenson Construction
Elk Grove Village, Ill.

Related Stories

Sustainability | Sep 18, 2024

3 living buildings made by a living practice

Prompting humans to reexamine our relationship to the environment, architecture creates the opportunity for us to physically experience ideas of beauty, performance, and structure through the distinct lens of place.

3D Printing | Sep 17, 2024

Alquist 3D and Walmart complete one of the nation’s largest free-standing, 3D-printed commercial structures

Walmart has completed one of the largest free-standing, 3D-printed commercial structures in the US. Alquist 3D printed the almost 8,000-sf, 20-foot-high addition to a Walmart store in Athens, Tenn. The expansion, which will be used for online pickup and delivery, is the first time Walmart has applied 3D printing technology at this scale. 

Retail Centers | Sep 17, 2024

Thinking outside the big box (store)

For over a decade now, the talk of the mall industry has been largely focused on what developers can do to fill the voids left by a steady number of big box store closures. But what do you do when big box tenants stay put?

Government Buildings | Sep 17, 2024

OSHA’s proposed heat standard published in Federal Register

The Occupational Safety and Health Administration (OSHA) has published a proposed standard addressing heat illness in outdoor and indoor settings in the Federal Register. The proposed rule would require employers to evaluate workplaces and implement controls to mitigate exposure to heat through engineering and administrative controls, training, effective communication, and other measures.

Codes and Standards | Sep 17, 2024

New California building code encourages, but does not mandate heat pumps

New California homes are more likely to have all-electric appliances starting in 2026 after the state’s energy regulators approved new state building standards. The new building code will encourage installation of heat pumps without actually banning gas heating. 

Mass Timber | Sep 17, 2024

Marina del Rey mixed-use development is L.A.’s largest mass timber project

An office-retail project in Marina del Rey is Los Angeles’ largest mass timber project to date. Encompassing about 3 acres, the 42XX campus consists of three low-rise buildings that seamlessly connect with exterior walkways and stairways. The development provides 151,000 sf of office space and 1,500 sf of retail space.

Education Facilities | Sep 16, 2024

Hot classrooms, playgrounds spur K-12 school districts to go beyond AC for cooling

With hotter weather occurring during the school year, school districts are turning to cooling strategies to complement air conditioning. Reflective playgrounds and roads, cool roofs and window films, shade structures and conversion of asphalt surfaces to a natural state are all being tried in various regions of the country. 

Office Buildings | Sep 16, 2024

Maximizing office square footage through ‘agile planning’

Lauren Elliott, RID, NCIDQ, Director of Interior Design, Design Collaborative, shares tips for a designing with a popular and flexible workspace model: Agile planning.

3D Printing | Sep 13, 2024

Swiss researchers develop robotic additive manufacturing method that uses earth-based materials—and not cement

Researchers at ETH Zurich, a university in Switzerland, have developed a new robotic additive manufacturing method to help make the construction industry more sustainable. Unlike concrete 3D printing, the process does not require cement.

Libraries | Sep 12, 2024

How space supports programming changes at university libraries

GBBN Associate Sarah Kusuma Rubritz, AIA, uses the University of Pittsburgh's Hillman Library to showcase how libraries are transforming to support students’ needs.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021