A new industrial-focused business park is currently under construction in West Henderson near Las Vegas. The $50 million project, designed by Lee & Sakahara, will comprise light industrial, showroom, flex, and amenity space.
The 300,000-sf project will span 17 acres and feature four flex/showroom and warehouse/distribution buildings. Buildings one and two will be divisible to 2,700 sf while buildings three and four are divisible to 24,000 sf with 32 foot clear height and ample dock high and grade level loading doors.
See Also: The burgeoning Port San Antonio lays out growth plans
The property’s street front location puts it in a unique position to appeal to businesses that are both consumer facing as well as logistics, showroom, or warehouse users. In addition to Lee & Sakahara, the build team includes Burke Construction Group (general contractor), Slater Hanifan Group (engineer), and Nuvis Landscape Architecture (landscape architect). The project is slated for completion in late 2019.
Related Stories
| Nov 5, 2012
Brasfield & Gorrie awarded new steel processing facility for Kloeckner Metals
The construction will take place on a 16-acre greenfield site at ThyssenKrupp Industrial Park in Calvert.
| Jun 1, 2012
New BD+C University Course on Insulated Metal Panels available
By completing this course, you earn 1.0 HSW/SD AIA Learning Units.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| Apr 25, 2012
Bubble skyscraper design aims to purify drinking water
The Freshwater Skyscraper will address the issue of increasing water scarcity through a process known as transpiration
| Dec 19, 2011
Survey: Job growth driving demand for office and industrial real estate in Southern California
Annual USC Lusk Center for Real Estate forecast reveals signs of slow market recovery.
| Nov 22, 2011
Saskatchewan's $1.24 billion carbon-capture project
The government of Saskatchewan has approved construction of the Boundary Dam Integrated Carbon Capture and Storage Demonstration Project.
| Oct 3, 2011
Balance bunker and Phase III projects breaks ground at Mitsubishi Plant in Georgia
The facility, a modification of similar facilities used by Mitsubishi Heavy Industries, Inc. (MHI) in Japan, was designed by a joint design team of engineers and architects from The Austin Company of Cleveland, Ohio, MPSA and MHI.