flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

6 must reads for the AEC industry today: May 6, 2020

Market Data

6 must reads for the AEC industry today: May 6, 2020

5 questions engineers will ask after COVID-19 and coronavirus threatens push for denser housing.


By BD+C Editors | May 6, 2020


1. 5 valuable questions building engineers will be asking after COVID-19 (CannonDesign)
"There are so many unanswered questions we are sorting through during this pandemic. The big one for me is: what will be the new normal in the post-COVID-19 world and to what extent will the way we interact with the built environment change?"

2. Video: Fresh ideas for converting idle hotel rooftops to amenity spaces (Base4)
"From fire pits to infinity pools to urban gardens, hotel design experts with Base4 offer smart ideas for making the most of hotel rooftop amenity spaces."

3. A few ways contractors can manage COVID-19 risks (BD+C)
"The goal is to alter project management and safety protocols to enable social distancing and enhance hygiene on job sites. Some contractors have added shifts and staggered start times and lunch breaks to reduce the number of workers on site at any given time."

4. National Construction Association and Procore to release new data showing the impacts of the coronavirus on the constructionindustry (AGC)  
"Data will be released on Friday, may 8 at 12 pm EDT."

5. Coronavirus Crisis Threatens Push for Denser Housing (New York Times)
"Transit-oriented developments were seen as a solution to severe housing shortages, but experts say developers need to rethink the design for a post-pandemic world."

6. Array Architects' Toolkit Provides Resources for Resuming Outpatient Services (Array Architects)
"As healthcare providers prepare to resume outpatient services, there are several considerations and opportunities to improve the safety of staff and patients. Array has developed a consolidated toolkit to reduce infection risk, acknowledge and ameliorate patient and staff anxiety, and streamline patient throughput. We have also included links to expanded resources and sample products to support healthcare teams."

 

 

Related Stories

Market Data | Aug 2, 2017

Nonresidential Construction Spending falls in June, driven by public sector

June’s weak construction spending report can be largely attributed to the public sector.

Market Data | Jul 31, 2017

U.S. economic growth accelerates in second quarter; Nonresidential fixed investment maintains momentum

Nonresidential fixed investment, a category of GDP embodying nonresidential construction activity, expanded at a 5.2% seasonally adjusted annual rate.

Multifamily Housing | Jul 27, 2017

Apartment market index: Business conditions soften, but still solid

Despite some softness at the high end of the apartment market, demand for apartments will continue to be substantial for years to come, according to the National Multifamily Housing Council. 

Market Data | Jul 25, 2017

What's your employer value proposition?

Hiring and retaining talent is one of the top challenges faced by most professional services firms.

Market Data | Jul 25, 2017

Moderating economic growth triggers construction forecast downgrade for 2017 and 2018

Prospects for the construction industry have weakened with developments over the first half of the year.

Industry Research | Jul 6, 2017

The four types of strategic real estate amenities

From swimming pools to pirate ships, amenities (even crazy ones) aren’t just perks, but assets to enhance performance.

Market Data | Jun 29, 2017

Silicon Valley, Long Island among the priciest places for office fitouts

Coming out on top as the most expensive market to build out an office is Silicon Valley, Calif., with an out-of-pocket cost of $199.22.

Market Data | Jun 26, 2017

Construction disputes were slightly less contentious last year

But poorly written and administered contracts are still problems, says latest Arcadis report.

Industry Research | Jun 26, 2017

Time to earn an architecture license continues to drop

This trend is driven by candidates completing the experience and examination programs concurrently and more quickly.

Industry Research | Jun 22, 2017

ABC's Construction Backlog Indicator rebounds in 2017

The first quarter showed gains in all categories.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021