1. Chicago’s Bank of America Tower completes, opens (BD+C)
"Designed by Goettsch Partners, the 1,770,000-sf tower includes a stepped center core, which allows for a 45-foot lease span on each side. Interior space planning is enhanced by the five-foot setbacks along the river, providing the equivalent of 14 corner offices."
2. Altering facilities for a post-COVID-19 world (Burns & McDonnell)
"There are several possibilities when it comes to reconfiguring or adjusting a space to maintain the health and safety of workers, from reorganizing spaces to enable social distancing measures to full teardown and reconstruction of a plant. Each increasing level of complexity adds to the amount of investment required and the possible disruption to an operation’s processes."
3. Repurposeability: The future of college campuses (GBBN)
"With COVID-19 putting additional pressures on budgets and shutting down or restricting campus access, endless campus expansions are even less tenable."
4. Standard contract document for prefab and modular building released (BD+C)
"The ConsensusDocs Coalition is offering the first standard contract document that addresses prefabricated construction."
5. The Weekly Show: AI for building facade inspections; designing a world-class architecture firm (BD+C)
"The October 15 episode of BD+C's "The Weekly" is available for viewing on demand."
6. L.A., all the way (BD+C)
"Over the past 40 years, KFA has designed more than 17,000 units of housing in over 300 different buildings for scores of developers in Los Angeles County. A dozen of these projects, comprising more than 1,000 affordable units, are on the city’s Skid Row. More than 40 of these buildings are of vintage quality; 11 are listed on the National Register of Historic Places."
Related Stories
Market Data | Jan 31, 2022
Canada's hotel construction pipeline ends 2021 with 262 projects and 35,325 rooms
At the close of 2021, projects under construction stand at 62 projects/8,100 rooms.
Market Data | Jan 27, 2022
Record high counts for franchise companies in the early planning stage at the end of Q4'21
Through year-end 2021, Marriott, Hilton, and IHG branded hotels represented 585 new hotel openings with 73,415 rooms.
Market Data | Jan 27, 2022
Dallas leads as the top market by project count in the U.S. hotel construction pipeline at year-end 2021
The market with the greatest number of projects already in the ground, at the end of the fourth quarter, is New York with 90 projects/14,513 rooms.
Market Data | Jan 26, 2022
2022 construction forecast: Healthcare, retail, industrial sectors to lead ‘healthy rebound’ for nonresidential construction
A panel of construction industry economists forecasts 5.4 percent growth for the nonresidential building sector in 2022, and a 6.1 percent bump in 2023.
Market Data | Jan 24, 2022
U.S. hotel construction pipeline stands at 4,814 projects/581,953 rooms at year-end 2021
Projects scheduled to start construction in the next 12 months stand at 1,821 projects/210,890 rooms at the end of the fourth quarter.
Market Data | Jan 19, 2022
Architecture firms end 2021 on a strong note
December’s Architectural Billings Index (ABI) score of 52.0 was an increase from 51.0 in November.
Market Data | Jan 13, 2022
Materials prices soar 20% in 2021 despite moderating in December
Most contractors in association survey list costs as top concern in 2022.
Market Data | Jan 12, 2022
Construction firms forsee growing demand for most types of projects
Seventy-four percent of firms plan to hire in 2022 despite supply-chain and labor challenges.
Market Data | Jan 7, 2022
Construction adds 22,000 jobs in December
Jobless rate falls to 5% as ongoing nonresidential recovery offsets rare dip in residential total.
Market Data | Jan 6, 2022
Inflation tempers optimism about construction in North America
Rider Levett Bucknall’s latest report cites labor shortages and supply chain snags among causes for cost increases.