flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

$61,000 awarded to students in Cleveland’s ACE Mentor Program

$61,000 awarded to students in Cleveland’s ACE Mentor Program

Mayor Frank G. Jackson gives keynote address at scholarship event for 80 Cleveland Metropolitan School District students involved in the ACE Mentor Program, which provides guidance and assistance for students interested in careers in the integrated construction industry.


By Posted by Tim Gregorski, Senior Editor | May 21, 2012
CMSD students in the ACE program received scholarships totaling more than $61,00
CMSD students in the ACE program received scholarships totaling more than $61,000

University Hospitals, together with Gilbane Building Co., and Regency Construction Services, Inc., awarded $61,000 in scholarships to students in the ACE (Architecture, Construction and Engineering) Mentor Program. This is the second $50,000 scholarship award made from the health system’s $200,000 donation to the ACE Mentor Program of Cleveland.  Individual student scholarships were provided by Gilbane and Regency while Kent State University, Cuyahoga Community College, and Cleveland State University provided matching scholarship awards to senior students entering architecture and engineering programs next fall.

Students presented their final design projects to a crowd of more than 250 family members, fellow students, community leaders and local businesses. A special guest panel of industry professionals provided input into the presentations, including Terry Schwartz, Director, Cleveland Urban Design Collaborative; Bob Brown, Director of City Planning, City of Cleveland; Hunter Morison, Director, YSU Urban Design Center; and Aparna Bapu, The Rise Group.

Thirty-five local architecture, engineering and construction firms provided more than 50 volunteers to mentor the students throughout the school year.  A selection of participating companies include Array Healthcare Facility Solutions, Architect; Barber & Hoffman, Structural Engineer; Chas E. Phipps Company, Material Supplier; Cleveland Educational Design Alliance, Architect; CT Consultants, Civil Engineer; Gilbane Building Company, Construction Manager; Herschman Architects, Architect; Michael Benza & Associates, Civil Engineer; PCS, Construction Manager; Regency Construction Services, Inc., Construction Manager; Stantec, Architect; Turner Construction Company, Construction Manager; URS, Architect/Engineer and VIP Restoration, Masonry Contractor. +

Related Stories

| Dec 2, 2011

What are you waiting for? BD+C's 2012 40 Under 40 nominations are due Friday, Jan. 20

Nominate a colleague, peer, or even yourself. Applications available here.

| Dec 2, 2011

Legrand joins White House initiative to spur energy efficiency in commercial buildings

Company agrees to aggressive energy savings and reporting.

| Dec 2, 2011

Goody Clancy awarded Ohio State residential project

The project, which is focused on developing a vibrant on-campus community of learning for OSU undergraduates.

| Dec 1, 2011

Nauset Construction breaks ground on Massachusetts health care center

The $20 million project is scheduled to be completed by December 2012. 

| Dec 1, 2011

Ground broken on first LEED Platinum designed school house built by volunteers

Phoenix public school receives the generous gift of a state-of-the-art building for student and community use.

| Dec 1, 2011

VLK Architects’ office receives LEED certification

The West 7th development, which houses the firm’s office, was designed to be LEED for Core & Shell, which gave VLK the head start on finishing out the area for LEED Silver Certification CI.

| Nov 29, 2011

First EPD awarded to exterior roof and wall products manufacturer

EPD is a standardized, internationally recognized tool for providing information on a product’s environmental impact. 

| Nov 29, 2011

Suffolk Construction breaks ground on Boston residential tower

Millennium Place III is a $220 million, 256-unit development that will occupy a full city block in Boston’s Downtown Crossing.

| Nov 29, 2011

Report finds credit crunch accounts for 20% of nation’s stalled projects

Persistent financing crunch continues to plague design and construction sector.

| Nov 29, 2011

SB Architects completes Mission Hills Volcanic Mineral Springs and Spa in China

Mission Hills Volcanic Mineral Springs and Spa is home to the largest natural springs reserve in the region, and measures 950,000 sf.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021