flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

7 must reads for the AEC industry today: April 7, 2020

Market Data

7 must reads for the AEC industry today: April 7, 2020

Leo A Daly's Hotel2Hospital prototype takes shape, while the number of delayed projects reaches 2,550 in the U.S. amid coronavirus pandemic.


By BD+C Editors | April 7, 2020
7 must reads for the AEC industry today: April 7, 2020
7 must reads for the AEC industry today: April 7, 2020

 

1. As cities scramble for hospital beds to treat COVID-19 patients, Leo A Daly offers a hotel-to-hospital solution (BD+C)
Leo A Daly is currently negotiating with several hoteliers about converting large portfolios of hotels into healthcare facilities that follow the firm’s Hotel2Hospital prototype, which would conform with design guidelines released last week to state governments by the U.S. Army Corps of Engineers, which relax some of the hospital safety standards.

2. New South Korean retail building looks like a molting insect (BD+C)
The building, Galleria’s sixth branch, has a very unique design to say the least. The facade combines multifaceted glass that appears to be breaking out from within opaque stone, as if the building was shedding its old skin and revealing the new.

3. How to convert college dorms to support the coronavirus crisis (NBBJ)
With the number of global coronavirus cases increasing each day, health centers are more burdened than ever before, witnessing severe bed shortages for critically-ill patients. At the same time, housing at many higher education institutions now stands mostly vacant — with hundreds of thousands of students home for social distancing and instruction now delivered online.

4. COVID-19's impact on the multifamily sector (BD+C)
COVID-19 is taking its toll on the U.S. vertical construction market. In a March 23-26 survey by the Associated General Contractors of America, 20% of the 659 respondents from "buildings contractors" reported projects being shut down or delayed by government officials, while 45% of those surveyed said an owner had instructed them to halt or cancel construction on a current or planned project.

5. Number of confirmed delayed projects reaches 2,550 in the U.S., 1,350 in Canada (ConstructConnect)
ConstructConnect's Delayed Project Tracker is updated daily. 

6. Climate-informed HVAC increases in relative humidity may fight pandemic viruses (SmithGroup)
Indoor relative humidity is a function of seasonal climate and building HVAC. The range of 40% to 60% RH may reduce contagion and help those who are infected.

7. Construction completed on first phase of Chicago's McCormick Place into Alternate Care Facility (Walsh Construction)
"Walsh Construction is leading the temporary conversion of a portion of the McCormick Place Convention Center into an Alternate Care Facility for novel coronavirus patients."


For more top stories from BD+C,  
sign up for the BD+C Daily 5 newsletter


 

Related Stories

Hotel Facilities | Jan 13, 2016

Hotel construction should remain strong through 2017

More than 100,000 rooms could be delivered this year alone.

Market Data | Jan 6, 2016

Census Bureau revises 10 years’ worth of construction spending figures

The largest revisions came in the last two years and were largely upward.

Market Data | Jan 5, 2016

Majority of AEC firms saw growth in 2015, remain optimistic for 2016: BD+C survey

By all indications, 2015 was another solid year for U.S. architecture, engineering, and construction firms.

Market Data | Jan 5, 2016

Nonresidential construction spending falters in November

Only 4 of 16 subsectors showed gains

Market Data | Dec 15, 2015

AIA: Architecture Billings Index hits another bump

Business conditions show continued strength in South and West regions.  

Market Data | Dec 7, 2015

2016 forecast: Continued growth expected for the construction industry

ABC forecasts growth in nonresidential construction spending of 7.4% in 2016 along with growth in employment and backlog.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021