flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

7 must reads for the AEC industry today: September 15, 2020

Market Data

7 must reads for the AEC industry today: September 15, 2020

Energy efficiency considerations for operating buildings during a pandemic and is there really a glass box paradox?


By BD+C Editors | September 15, 2020


1. Latest addition to Fermilab campus about to begin construction (BD+C) 
"That team’s concept scales back the building to two floors, and includes more lab space. What emerges are “hybrid labs” that, essentially, remove the walls separating labs and offices for the purposes of colocation and collaboration."

2. Is there really a glass box paradox? (The Durst Organization) 
"First and foremost, OBP is a building designed for people. Productivity, wellness, and providing optimal conditions for work to occur, were all drivers of the design of the building. The mechanical systems and envelope were designed to efficiently support those goals. The authors provide some good ideas for how to modify a façade to make it more energy efficient."

3. McShane Construction begins work on Gilbert, Ariz., multifamily development (BD+C) 
"Springs at Cooley Station will feature 276 apartment units spread across 14 acres and 10 garden-style buildings. The wood-frame buildings will rise two and three stories and feature a stucco and brick exterior."

4. Energy efficiency considerations for operating buildings amid a pandemic (SSR) 
"During these times building owners and operators should remain focused on verifying their building systems are functioning properly and maintenance routines are kept on schedule."

5. What concessions are office landlords offering to hold onto tenants as demand falters? (National Real Estate Investor)
"Recent reports have shown office landlords have been more willing to offer tenants additional perks to get them to commit."

6. What contractors should be telling owners about shifting to offsite construction (Construction Dive)
"Some construction companies are in a unique position as long-time, trusted partners to a developer, but even contractors that are relatively new to a relationship might want to direct the owner toward a method of building that can deliver quality, consistency and time and cost benefits — sometimes. How should you start that conversation with the owner, and what are the most important aspects of going modular to cover? Here are the key points to convey to owners."

7. Miami company introduces 'virtual coworking' (Bisnow)
"A number of coworking operators are experimenting with their formats. CommonDesk is offering virtual memberships for $75 to $150 that offer access to Slack channels and virtual happy hours and lunch-and-learn events. WeWork is piloting a program in New York that allows people to book workspaces by the hour or day. It's also allowing members to work out of any location, rather than a fixed location, for no additional cost."

 

Related Stories

Hotel Facilities | Jul 28, 2022

As travel returns, U.S. hotel construction pipeline growth follows

According to the recently released United States Construction Pipeline Trend Report from Lodging Econometrics (LE), the total U.S. construction pipeline stands at 5,220 projects/621,268 rooms at the close of 2022’s second quarter, up 9% Year-Over-Year (YOY) by projects and 4% YOY by rooms.

Codes and Standards | Jul 22, 2022

Hurricane-resistant construction may be greatly undervalued

  New research led by an MIT graduate student at the school’s Concrete Sustainability Hub suggests that the value of buildings constructed to resist wind damage in hurricanes may be significantly underestimated.

Market Data | Jul 21, 2022

Architecture Billings Index continues to stabilize but remains healthy

Architecture firms reported increasing demand for design services in June, according to a new report today from The American Institute of Architects (AIA).

Market Data | Jul 21, 2022

Despite deteriorating economic conditions, nonresidential construction spending projected to increase through 2023

Construction spending on buildings is projected to increase just over nine percent this year and another six percent in 2023, according to a new report from the American Institute of Architects (AIA). 

Building Team | Jul 18, 2022

Understanding the growing design-build market

FMI’s new analysis of the design-build market forecast for the next fives years shows that this delivery method will continue to grow, despite challenges from the COVID-19 pandemic.

Market Data | Jul 1, 2022

Nonresidential construction spending slightly dips in May, says ABC

National nonresidential construction spending was down by 0.6% in May, according to an Associated Builders and Contractors analysis of data published today by the U.S. Census Bureau.

Market Data | Jun 30, 2022

Yardi Matrix releases new national rent growth forecast

Rents in most American cities continue to rise slightly each month, but are not duplicating the rapid escalation rates exhibited in 2021.

Market Data | Jun 22, 2022

Architecture Billings Index slows but remains strong

Architecture firms reported increasing demand for design services in May, according to a new report today from The American Institute of Architects (AIA).

Building Team | Jun 17, 2022

Data analytics in design and construction: from confusion to clarity and the data-driven future

Data helps virtual design and construction (VDC) teams predict project risks and navigate change, which is especially vital in today’s fluctuating construction environment.

Market Data | Jun 15, 2022

ABC’s construction backlog rises in May; contractor confidence falters

Associated Builders and Contractors reports today that its Construction Backlog Indicator increased to nine months in May from 8.8 months in April, according to an ABC member survey conducted May 17 to June 3. The reading is up one month from May 2021.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021