For the rehabilitation of two of its senior housing properties dating to the 1960s and 1970s, the Morristown (N.J.) Housing Authority installed 608 single-, double-, and triple-unit windows supplied by national manufacturer Crystal Window & Door Systems.
The renovation work included extensive interior and exterior work, complete resurfacing of the brick façades, and the replacement of all windows in the pair of six-story buildings: the Wetmore, 31 Early Street, and the Petrone, 39 Early Street.
The two properties offer 200 apartments set aside exclusively for area seniors. Financing for the rehabilitation project was provided through a special public/private arrangement under the federal and New Jersey state Rental Assistance Demonstration program, which also includes privatization of the buildings’ ongoing operation and management.
MORE THAN 600 REPLACEMENT WINDOWS INSTALLED
Crystal supplied 459 Series 2000A aluminum double-hung windows in single- and master-frame double versions and 149 Series 2100 aluminum fixed windows in single- and master-frame triple units. The Series 2000A is a thermally broken aluminum tilt-in sash double-hung window. The 3¼-inch frame depth window features equal sightlines, a sloped sill, and a solid AAMA structural rating of CW-PG50.
Other features include an ergonomic curved, easy-use sash lift rail and anti-drift head clip lock, which automatically locks the top sash in the closed position, assuring safety, security, and a weathertight seal.
The Crystal 2000A is available as a single unit and, with a continuous master frame, double and triple units, some of which were used for the Morristown project.
For the Morristown project, Crystal also supplied the Series 2100 thermally broken aluminum fixed picture window. This 3¼-inch frame depth window is AAMA rated CW-PG60. The Series 2100 is also available as a single unit or as double and triple units using a continuous master frame.
To complement the building’s new modern façade, all the windows were finished in durable, environmentally sustainable AAMA 2604 simulated anodized silver powder coat paint.
In addition to the Series 2000A and 2100 windows, Crystal sourced, supplied, and factory installed in window frames 248 insulated panels in lieu of window glass. With each of the Series 2100 triple window units for the Petrone building, the center panel was left open to accept an HVAC unit and the two flankers were glazed with a ⅞-inch thermal insulated panel.
The Petrone building’s Series 2000A double-hung windows were mulled atop Series 2100 fixed windows glazed with a ⅞” thick insulated panel. The special insulated panels were supplied by A-Porcel, Bronx, N.Y., and featured a stucco exterior finish in AAMA 2604 simulated anodized silver powder coat paint to match the window frames.
For all the vision glass window units, ⅞-inch double-pane insulated glass units with Intercept warm-edge spacers were installed. For additional thermal efficiency and safety, Vitro Solarban SB60 tempered glass with argon gas was specified.
Crystal fabricated and provided installation accessories including window frame face flanges, stack mullions, and installation clips with snap trim.
WETMORE/PETRONE BUILDING TEAM
Owner: Morristown (N.J.) Housing Authority
Developer/Privatized property manager: Orbach Affordable Housing Solutions
Architect: KMA Design Studio
General contractor/Window installer: ETC Companies
ABOUT CRYSTAL WINDOW & DOOR SYSTEMS
Crystal Window & Door Systems is one of the top 30 manufacturers in North America of replacement and new construction vinyl and aluminum window and door products and high-end fenestration systems. Crystal offers a full product line, rapid order-to-delivery times, quality workmanship, innovative product features, outstanding value, and an experienced and knowledgeable staff. Headquartered in New York, the company operates a national network of factories, branches, subsidiaries and affiliates in California, Illinois, Missouri, Ohio, Pennsylvania, and its newest branch in Texas. For further information, call 718-961-7300.
Related Stories
| Dec 20, 2013
Can energy hogs still be considered efficient buildings? Yes, say engineers at Buro Happold
A new tool from the engineering firm Buro Happold takes into account both energy and economic performance of buildings for a true measure of efficiency.
| Dec 13, 2013
Safe and sound: 10 solutions for fire and life safety
From a dual fire-CO detector to an aspiration-sensing fire alarm, BD+C editors present a roundup of new fire and life safety products and technologies.
| Dec 10, 2013
16 great solutions for architects, engineers, and contractors
From a crowd-funded smart shovel to a why-didn’t-someone-do-this-sooner scheme for managing traffic in public restrooms, these ideas are noteworthy for creative problem-solving. Here are some of the most intriguing innovations the BD+C community has brought to our attention this year.
| Dec 4, 2013
First look: Dubai's winning bid for World Expo 2020 [slideshow]
Dubai has been chosen as the site of the 2020 World Expo. HOK led the design team that developed the master plan for the Expo, which is expected to draw more than 25 million visitors from October 2020 through April 2021.
| Nov 27, 2013
Exclusive survey: Revenues increased at nearly half of AEC firms in 2013
Forty-six percent of the respondents to an exclusive BD+C survey of AEC professionals reported that revenues had increased this year compared to 2012, with another 24.2% saying cash flow had stayed the same.
| Nov 27, 2013
Wonder walls: 13 choices for the building envelope
BD+C editors present a roundup of the latest technologies and applications in exterior wall systems, from a tapered metal wall installation in Oklahoma to a textured precast concrete solution in North Carolina.
| Nov 26, 2013
Construction costs rise for 22nd straight month in November
Construction costs in North America rose for the 22nd consecutive month in November as labor costs continued to increase, amid growing industry concern over the tight availability of skilled workers.
| Nov 25, 2013
Building Teams need to help owners avoid 'operational stray'
"Operational stray" occurs when a building’s MEP systems don’t work the way they should. Even the most well-designed and constructed building can stray from perfection—and that can cost the owner a ton in unnecessary utility costs. But help is on the way.
| Nov 19, 2013
Top 10 green building products for 2014
Assa Abloy's power-over-ethernet access-control locks and Schüco's retrofit façade system are among the products to make BuildingGreen Inc.'s annual Top-10 Green Building Products list.
| Nov 15, 2013
Greenbuild 2013 Report - BD+C Exclusive
The BD+C editorial team brings you this special report on the latest green building trends across nine key market sectors.