Our inaugural “Multifamily Kitchen+Bath Amenities Survey” of multifamily developers, architects, contractors, and other professionals provides exclusive data – 111 charts and tables – on the state of K+B amenity usage in multifamily housing.
CLICK HERE FOR FREE REPORT (SHORT REGISTRATION REQUIRED)
Among the key findings:
Some products stand out as evergreens, based on their high response rates: dishwashers (used by 97% of respondents, including 89% “extensively”); Energy Star appliances (95% usage, including 83% “extensively”); and installed microwave ovens (used by 94%, including 84% “extensively”).
• Project teams had favorite K+B amenities that they use consistently in their work – but they were open to trying many new products, such as induction cooktops, for the first time as well.
• All 106 K+B products or specifications were employed by at least some respondents, although the adoption rate for some of these products or specification types was sometimes in the low single digits.
• Supply chain problems, notably for appliances and cabinets, had impacted project delivery.
• Some project teams installed specific K+B products for the first time; others said they intend to use various K+B products, like air filtration systems, that they had never used before in future projects.
Here's an example of one of the 106 K+B amenities featured in the report:
Participants in the survey included architects (45%), developers/property owners/property managers (25%), contractors (16%), interior designers (9%), product manufacturers (3%), and engineers (2%). They developed, designed, and constructed apartments (91%), senior living (54%), townhomes (51%), condominiums (39%), and student housing (33%).
REFRIGERATORS, CABINETS IN SHORT SUPPLY
One respondent described the supply chain mess this way: “As developers are attempting to nail down pricing early in the Design Phase … combined with logistic nightmares, getting the design team ahead of the curve and in line with the general contractor and pricing exercises is crucial.”
Appliances came up more often than any other product category. “We’ve been purchasing them early and storing [them] in our own warehouses or changing our spec to purchase models that are in stock/available,” said one respondent.
“It’s been difficult getting appliance packages with the same manufacturer,” said another respondent. “We’re needing to mix manufacturers and appliances.”
Refrigerators were the main culprit cited by respondents. “We’re finding whatever spec is available,” said one. “Need to order well in advance and be flexible,” advised another.
Cabinets were also headache cited by several respondents. “Unfortunately, [we’re] playing the waiting game,” moaned a cabinetless respondent. Another firm said it was using pantry cabinets in bathrooms instead of medicine cabinets.
One pleaded, “[We’re] trying to get locally sourced cabinets, made in the USA.”
The last word on “solving” the K+B amenity shortage problem: “Order way in advance,” advised a respondent.
MULTIFAMILY HOUSING TEAMS 'INTEND TO USE' NEW PRODUCTS
Project teams showed interest in trying new K+B products, styles, or features in the future, even with the usual caution about "experimenting" with anything new.
FIRST-TIME USERS TRIED A WIDE VARIETY OF K+B AMENITIES
Some brave souls had actually used one or more new K+B products, styles, or features for the first time:
CLICK HERE FOR FREE REPORT (SHORT REGISTRATION REQUIRED)
Related Stories
| Apr 22, 2013
Top 10 green building projects for 2013 [slideshow]
The AIA's Committee on the Environment selected its top ten examples of sustainable architecture and green design solutions that protect and enhance the environment.
| Apr 19, 2013
7 hip high-rise developments on the drawing board
Adrian Smith and Gordon Gill's whimsical Dancing Dragons tower in Seoul is among the compelling high-rise projects in the works across the globe.
| Apr 16, 2013
5 projects that profited from insulated metal panels
From an orchid-shaped visitor center to California’s largest public works project, each of these projects benefited from IMP technology.
| Apr 5, 2013
Bangkok gets a leaning tower, that may topple
A seven-story apartment tower under construction in Bangkok has started to tilt and is on the verge of toppling.
| Apr 3, 2013
5 award-winning modular buildings
The Modular Building Institute recently revealed the winners of its annual Awards of Distinction contest. There were 42 winners in all across six categories. Here are five projects that caught our eye.
| Mar 27, 2013
RSMeans cost comparisons: college labs, classrooms, residence halls, student unions
Construction market analysts from RSMeans offer construction costs per square foot for four building types across 25 metro markets.
| Mar 15, 2013
7 most endangered buildings in Chicago
The Chicago Preservation Society released its annual list of the buildings at high risk for demolition.