Our inaugural “Multifamily Kitchen+Bath Amenities Survey” of multifamily developers, architects, contractors, and other professionals provides exclusive data – 111 charts and tables – on the state of K+B amenity usage in multifamily housing.
CLICK HERE FOR FREE REPORT (SHORT REGISTRATION REQUIRED)
Among the key findings:
Some products stand out as evergreens, based on their high response rates: dishwashers (used by 97% of respondents, including 89% “extensively”); Energy Star appliances (95% usage, including 83% “extensively”); and installed microwave ovens (used by 94%, including 84% “extensively”).
• Project teams had favorite K+B amenities that they use consistently in their work – but they were open to trying many new products, such as induction cooktops, for the first time as well.
• All 106 K+B products or specifications were employed by at least some respondents, although the adoption rate for some of these products or specification types was sometimes in the low single digits.
• Supply chain problems, notably for appliances and cabinets, had impacted project delivery.
• Some project teams installed specific K+B products for the first time; others said they intend to use various K+B products, like air filtration systems, that they had never used before in future projects.
Here's an example of one of the 106 K+B amenities featured in the report:
Participants in the survey included architects (45%), developers/property owners/property managers (25%), contractors (16%), interior designers (9%), product manufacturers (3%), and engineers (2%). They developed, designed, and constructed apartments (91%), senior living (54%), townhomes (51%), condominiums (39%), and student housing (33%).
REFRIGERATORS, CABINETS IN SHORT SUPPLY
One respondent described the supply chain mess this way: “As developers are attempting to nail down pricing early in the Design Phase … combined with logistic nightmares, getting the design team ahead of the curve and in line with the general contractor and pricing exercises is crucial.”
Appliances came up more often than any other product category. “We’ve been purchasing them early and storing [them] in our own warehouses or changing our spec to purchase models that are in stock/available,” said one respondent.
“It’s been difficult getting appliance packages with the same manufacturer,” said another respondent. “We’re needing to mix manufacturers and appliances.”
Refrigerators were the main culprit cited by respondents. “We’re finding whatever spec is available,” said one. “Need to order well in advance and be flexible,” advised another.
Cabinets were also headache cited by several respondents. “Unfortunately, [we’re] playing the waiting game,” moaned a cabinetless respondent. Another firm said it was using pantry cabinets in bathrooms instead of medicine cabinets.
One pleaded, “[We’re] trying to get locally sourced cabinets, made in the USA.”
The last word on “solving” the K+B amenity shortage problem: “Order way in advance,” advised a respondent.
MULTIFAMILY HOUSING TEAMS 'INTEND TO USE' NEW PRODUCTS
Project teams showed interest in trying new K+B products, styles, or features in the future, even with the usual caution about "experimenting" with anything new.
FIRST-TIME USERS TRIED A WIDE VARIETY OF K+B AMENITIES
Some brave souls had actually used one or more new K+B products, styles, or features for the first time:
CLICK HERE FOR FREE REPORT (SHORT REGISTRATION REQUIRED)
Related Stories
| Nov 14, 2011
303 East 33rd Street building achieves LEED-NC
The 165,000 sf 12-story residential building is the first green development to be LEED certified in the Murray Hill neighborhood of Manhattan.
| Oct 17, 2011
Austin's newest urban apartment complex under construction
Complex sits on a four-acre waterfront site along Lady Bird Lake with spectacular city and lake views, and is slated to open spring 2013.
| Oct 12, 2011
FMI’s Construction Outlook: Third Quarter 2011 Report
Construction Market Forecast: The general economy is seeing mixed signs.
| Oct 6, 2011
GREENBUILD 2011: NEXT Living EcoSuite showcased
Tridel teams up with Cisco and Control4 to unveil the future of green condo living in Canada.
| Sep 29, 2011
Kohler supports 2011 Solar Decathlon competition teams
Modular Architecture > In a quest to create the ultimate ‘green’ house, 20 collegiate teams compete in Washington D.C. Mall.
| Sep 23, 2011
$5M pledge renewed for Habitat for Humanity
The five-year commitment, which will run through 2015, includes $5 million of donated interior and exterior locks and keys for homes built with Habitat for Humanity homeowner partners and volunteers.
| Sep 23, 2011
Under 40 Leadership Summit
Building Design+Construction’s Under 40 Leadership Summit takes place October 26-28, 2011 Hotel at the Monteleone in New Orleans. Discounted hotel rate deadline: October 2, 2011.
| Sep 20, 2011
Jeanne Gang wins MacArthur Fellowship
Jeanne Gang, a 2011 MacArthur Fellowship winner described by the foundation as "an architect challenging the aesthetic and technical possibilities of the art form in a wide range of structures."
| Sep 12, 2011
Living Buildings: Are AEC Firms up to the Challenge?
Modular Architecture > You’ve done a LEED Gold or two, maybe even a LEED Platinum. But are you and your firm ready to take on the Living Building Challenge? Think twice before you say yes.