flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

AECOM and Ferrovial to design vertiport infrastructure in Florida

Transit Facilities

AECOM and Ferrovial to design vertiport infrastructure in Florida

The vertiports will enable eVTOL Aviation, connecting Florida’s major cities.


By David Malone, Associate Editor | February 18, 2021
Aecome and Ferrovial's eVTOL infrastructure design

Courtesy AECOM

AECOM and Ferrovial have partnered to design a network of vertiports that will connect strategic locations in major Florida cities. Vertiports are a key component in enabling innovation in electric vertical take off and landing (eVTOL) aircraft by providing the necessary infrastructure for landing, recharging, and departure.

The vertiporm infrastructure emphasizes sustainability and efficiency by taking advantage of sunlight and natural elements. Noise abatement materials and surfaces are a key feature of the airfield design in order to further reduce the already ultra-low noise emissions from eVTOL jets. The veriport terminal buildings will provide a user-friendly passenger experience by enabling touches processes, quick journeys, and a comfortable environment.

"It is important for us that the design of the vertiport infrastructure reflects the innovative nature of the eVTOL crafts while creating a warm, welcoming environment,” said Elisabeth Bernitt, Senior Vice President and Managing Principal with AECOM’s Buildings + Places business, in a release. “By incorporating flexible and modular elements our partners will be able to scale the vertiports with growth, permitting an efficient space that allows for future innovation while emphasizing the passenger experience.”

The Ferrovial and AECOM-designed vertiporm infrastructure will help enable a high-speed, environmentally friendly, affordable alternative transport system that will connect Florida’s cities in new, sustainable, and more convenient ways.

Related Stories

| May 13, 2014

19 industry groups team to promote resilient planning and building materials

The industry associations, with more than 700,000 members generating almost $1 trillion in GDP, have issued a joint statement on resilience, pushing design and building solutions for disaster mitigation.

| May 11, 2014

Final call for entries: 2014 Giants 300 survey

BD+C's 2014 Giants 300 survey forms are due Wednesday, May 21. Survey results will be published in our July 2014 issue. The annual Giants 300 Report ranks the top AEC firms in commercial construction, by revenue.

| May 1, 2014

Super BIM: 7 award-winning BIM/VDC-driven projects

Thom Mayne's Perot Museum of Nature and Science and Anaheim's new intermodal center are among the 2014 AIA TAP BIM Award winners. 

| Apr 29, 2014

USGBC launches real-time green building data dashboard

The online data visualization resource highlights green building data for each state and Washington, D.C.

Smart Buildings | Apr 28, 2014

Cities Alive: Arup report examines latest trends in urban green spaces

From vertical farming to glowing trees (yes, glowing trees), Arup engineers imagine the future of green infrastructure in cities across the world.

| Apr 9, 2014

Steel decks: 11 tips for their proper use | BD+C

Building Teams have been using steel decks with proven success for 75 years. Building Design+Construction consulted with technical experts from the Steel Deck Institute and the deck manufacturing industry for their advice on how best to use steel decking.

| Apr 2, 2014

8 tips for avoiding thermal bridges in window applications

Aligning thermal breaks and applying air barriers are among the top design and installation tricks recommended by building enclosure experts.

| Mar 26, 2014

Free transit for everyone! Then again, maybe not

An interesting experiment is taking place in Tallinn, the capital of Estonia, where, for the last year or so, its 430,000 residents have been able to ride the city’s transit lines practically for free. City officials hope to pump up ridership by 20%, cut carbon emissions, and give low-income Tallinnites greater access to job opportunities. But is it working?

| Mar 26, 2014

Callison launches sustainable design tool with 84 proven strategies

Hybrid ventilation, nighttime cooling, and fuel cell technology are among the dozens of sustainable design techniques profiled by Callison on its new website, Matrix.Callison.com. 

| Mar 20, 2014

Common EIFS failures, and how to prevent them

Poor workmanship, impact damage, building movement, and incompatible or unsound substrate are among the major culprits of EIFS problems. 

boombox1
boombox2
native1

More In Category

Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.



Transit Facilities

Top 25 Transit Facility Construction Firms for 2023

The Walsh Group, Clark Group, Hensel Phelps, Skanska USA, and Hill International top BD+C's ranking of the nation's largest transit facility general contractors and construction management (CM) firms for 2023, as reported in the 2023 Giants 400 Report. Note: This ranking includes construction revenue for work related to bus terminals, rail terminals, and transit stations.


Transit Facilities

Top 40 Transit Facility Engineering Firms for 2023

AECOM, Jacobs, EXP, WSP, and Arup head BD+C's ranking of the nation's largest transit facility engineering and engineering/architecture (EA) firms for 2023, as reported in the 2023 Giants 400 Report. Note: This ranking includes design revenue for work related to bus terminals, rail terminals, and transit stations.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021