flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Agora Garden, a twisting, plant-filled tower in Taipei, will absorb 130 tons of carbon dioxide annually once completed

High-rise Construction

Agora Garden, a twisting, plant-filled tower in Taipei, will absorb 130 tons of carbon dioxide annually once completed

The building sits just a few blocks from the LEED-Platinum certified Taipei 101, the world’s eighth tallest building.


By David Malone, Associate Editor | December 2, 2016

Image courtesy of Vincent Callebaut Architectures

A twisted tower is a dramatic addition to any skyline and doesn’t require much else to catch the eye of anyone whose sightline it may come into. But a new twisted tower from Vincent Callebaut Architectures will add a metaphorical twist on top of the literal 90-degree twist its recently topped out Agora Garden skyscraper already has. The new building will be packed with plants, vegetable gardens, and trees on each of its 22 floors, turning it into, what the architect calls, a vertical farm.

Agora Garden is looking to become the embodiment of a vertical farm and will include vertically wide planted balconies of suspended orchards, organic vegetable gardens, aromatic gardens, and other medicinal gardens as a means of producing its own organic food.

In addition to allowing the building to produce some of its own food, the inclusion of all of this greenery means the building will be able to absorb up to 130 tons of carbon dioxide annually.

 

Image courtesy of Vincent Callebaut Architectures

 

According to the architect, the building will integrate the recycling of organic waste and used water, BIPV solar photovoltaic energy, rainwater recycling, and composting into its plans, as well. Vincent Callebaut Architectures’ website lists four main ecological objectives the building will accomplish:

 

  1. The reduction of the climatic global warming. 
  2. The protection of nature and biodiversity.
  3. The protection of the environment and the quality of life.
  4. The management of natural resources and waste. 

 

The building will include car parks, a swimming pool, a fitness center, and lobbies that will connect the indoor spaces with the surrounding outdoor spaces. The central core of the building will be a vertical twisted garden surrounded by sky entry foyers. The core itself does not pivot but is surrounded by a naturally lightened horizontal circulation loop welcoming the entry foyer dedicated to each unit. This “buffer loop” enables the main entrance to always be in the axis of each apartment despite the 4.5 degrees rotation story by story.

The tower has recently topped out and is expected to be completed in September 2017. For additional, detailed information on the project, click here.

 

Image courtesy of Vincent Callebaut Architectures

 

Image courtesy of Vincent Callebaut Architectures

 

Image courtesy of Vincent Callebaut Architectures

 

Image courtesy of Vincent Callebaut Architectures

 

Image courtesy of Vincent Callebaut Architectures

Related Stories

High-rise Construction | Aug 25, 2021

Summit One Vanderbilt immersive experience and observatory set to open

The project is located in the crown of One Vanderbilt.

Office Buildings | Aug 4, 2021

‘Lighthouse’ office tower will be new headquarters for A2A in Milan

The tower, dubbed Torre Faro, reimagines the company’s office spaces to adapt to people’s ever-changing needs at work.

High-rise Construction | May 27, 2021

The anti-high rise: Seattle's The Net by NBBJ

In this exclusive video interview for HorizonTV, Ryan Mullenix, Design Partner with NBBJ, talks with BD+C's John Caulfield about a new building in Seattle called The Net that promotes wellness and connectivity. 

Mixed-Use | Apr 22, 2021

Jakarta’s first supertall tower tops out

The project will anchor the Thamrin Nine development.

High-rise Construction | Jan 20, 2021

Casablanca Finance City Tower becomes Morphosis’ first project in Africa

The tower is the first building completed in Casablanca Finance City.

Products and Materials | Sep 23, 2020

A new portable restroom is designed for mobility

Lendlease invented the H3 Wellness Hub, which can include natural lighting and UV bacteria control.

High-rise Construction | Mar 20, 2020

Edge, the Western Hemisphere’s highest outdoor skydeck opens

The attraction is part of 30 Hudson Yards.  

High-rise Construction | Nov 6, 2019

AS+GG releases design scheme for the South HeXi Yuzui Financial District and Tower

The firm won an international design competition for the project in 2018.

High-rise Construction | Oct 7, 2019

A giant shipwreck sculpture highlights the proposal for Prague’s tallest building

Sculptor David Černý and architect Tomáš Císař from the studio Black n´ Arch designed the project.

High-rise Construction | Oct 4, 2019

KPF-designed CITIC tower is Beijing’s tallest

The tower is the fourth tallest in China and the eighth tallest in the world.

boombox1
boombox2
native1

More In Category




Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021