flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

AIA releases nine new contract documents

Architects

AIA releases nine new contract documents

Include six new forms for design-build projects.


By Peter Fabris, Contributing Editor | November 10, 2015
AIA releases nine new contract documents

Photo: Mark Kaletka/Creative Commons

The American Institute of Architects has released nine new contract documents.

They include a new owner/consultant agreement with two accompanying scope of service exhibits for land surveying and geotechnical engineering. Six new administrative forms for use on design-build projects are also available.

“Our customers expressed a need for a standard form of agreement owners could use to engage necessary consultants and leverage their expertise,” says Kenneth Cobleigh, Managing Director & Counsel, AIA Contract Documents. “The new C103 document addresses that need. These additions also cap off our design-build family of documents, which are preferred by the industry at large for commercial design-build projects.”

The C103–2015, Standard Form of Agreement Between Owner and Consultant without a Predefined Scope of Consultant’s Services, establishes expectations between an owner and consultant on a project. The agreement contains basic business terms related to copyrights and licenses, claims and disputes, termination or suspension, and compensation.

The new documents are currently available through the latest version of the AIA Contract Documents desktop software, as well as individually through AIA Documents-on-Demand and AIA Documents-on-Demand Plus.

Tags

Related Stories

| Jan 9, 2012

FGM Architects acquires SRBL Architects

The firm reviewed gaps in each of the markets and identified a need in the municipal market for stronger police facility design expertise as well as additional project management and design expertise for this market.

| Jan 9, 2012

Shawmut appoints Les Hiscoe COO and EVP

In his new role, Hiscoe will focus on developing the Company’s field services divisions; national business in retail, hospitality, gaming, and sports venues; Tri-State business in academic and healthcare; sales and marketing; and human resources

| Jan 9, 2012

Thornton Tomasetti acquires green consulting firm Fore Solutions

International engineering firm launches new building sustainability practice.

| Jan 9, 2012

METALCON International 2012 announced

METALCON 2012 is scheduled for Oct. 9-11 at the Donald E Stephens Convention Center, Hall A, Rosemont, Ill.

| Jan 9, 2012

Lutron appoints Pessina president

In his 35-year career with Lutron, Pessina has acquired broad experience in the engineering, quality assurance and manufacturing areas. 

| Jan 9, 2012

A new journey for KSS Architects co-founder

Kehrt's legacy of projects include Rutgers University's Biomedical Engineering Building, the renovation and expansion of Cornell University School of Hotel Administration, the recent new campus center at The Richard Stockton College of New Jersey and Princeton Township's Municipal Complex. 

| Jan 8, 2012

TCA releases The Construction of Tilt-Up

The newest publication from the TCA is the second in a planned trilogy of resources covering the architecture, engineering and construction of Tilt-Up

| Jan 8, 2012

WHR Architects promotes Joel Colwell, AIA, to principal

With over 30 years of experience, Colwell has managed large-scale, complex projects for major healthcare systems as well as challenging smaller renovations and additions — all with notable success.

| Jan 6, 2012

Doug Wignall named president of HDR Architecture

HDR Architecture, Inc. is known for its award-winning designs for urban environments, campuses and buildings in the healthcare, science and technology, civic, justice and higher education markets.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021