Walmart has completed one of the largest free-standing, 3D-printed commercial structures in the US. Alquist 3D printed the almost 8,000-sf, 20-foot-high addition to a Walmart store in Athens, Tenn.
The expansion, which will be used for online pickup and delivery, is the first time Walmart has applied 3D printing technology at this scale. CPH designed the structure, with FMGI as the general contractor.
“This is the first such facility of its kind and it’s just incredible that it is a reality. This is going to play a major role in the advancement of 3DCP [3D concrete printing] technology,” Zachary Mannheimer, founder and chairman, Alquist 3D, said in a press statement.
After considering several companies in the field of innovative construction technology, Walmart selected Alquist 3D for two main reasons: its expertise in delivering complex projects and its ability to partner with industry leaders such as SIKA, a specialty chemicals company, and RIC Technology, a provider of construction robotics. These partnerships gave Alquist the knowledge and resources needed to meet the project’s challenges.
Video courtesy Alquist 3D
“Walmart is always looking to innovate and leverage developing technologies, and we looked at several new building methods and companies for this project,” said Mike Neill, vice president of new construction, Walmart. “Alquist presented the best ability to work with due to their deep knowledge of 3D materials, robotics, and desire to take on an ambitious and unique project.”
Walmart’s use of 3D construction printing aligns with its broader aims of becoming more environmentally friendly, leveraging cutting-edge technology to attract customers, and accelerating the construction process.
The Alquist 3D team’s lessons learned from the project include the importance of managing material temperatures during summer, achieving faster print times, and successfully constructing vertical structures up to 20 feet—a first for the company. Alquist 3D will use the experience gained here on future projects, such as residential and commercial construction.
“The knowledge gained on this project will accelerate our work on residential units to fulfill the mission of Alquist,” said Patrick Callahan, CEO, Alquist 3D. “In order to improve, we tackled the most challenging project we could find and completed it with excellence.”
Alquist and Walmart plan to work on a second project in the near future.
Related Stories
3D Printing | Aug 29, 2018
Dubai plans to 3D print 25% of every new building by 2025
The Dubai Future Foundation recently announced the Dubai 3D Printing Strategy.
Accelerate Live! | Jun 24, 2018
Watch all 19 Accelerate Live! talks on demand
BD+C’s second annual Accelerate Live! AEC innovation conference (May 10, 2018, Chicago) featured talks on AI for construction scheduling, regenerative design, the micro-buildings movement, post-occupancy evaluation, predictive visual data analytics, digital fabrication, and more. Take in all 19 talks on demand.
| Jun 11, 2018
Accelerate Live! talk: How advanced digital fabrication techniques are driving design innovation
In this 15-minute talk at BD+C’s Accelerate Live! conference (May 10, 2018, Chicago), SOM’s Lucas Tryggestad and Kyle Vansice present the firm’s 3D-printed building project and explore how digital fabrication is pushing design innovation.
| May 30, 2018
Accelerate Live! talk: Seven technologies that restore glory to the master builder
In this 15-minute talk at BD+C’s Accelerate Live! conference (May 10, 2018, Chicago), AEC technophile Rohit Arora outlines emerging innovations that are poised to transform how we design and build structures in the near future.
3D Printing | Nov 21, 2017
Europe’s first 3D-printed building has been completed
Construction ran a few weeks behind schedule, but the 3D printing wasn’t to blame.
Codes and Standards | Aug 8, 2017
3D printing industry working to implement standards for products, processes
Additive Manufacturing Standardization Collective (AMSC) will develop industry-wide additive manufacturing standards and specifications.
Accelerate Live! | Jul 6, 2017
Watch all 20 Accelerate Live! talks on demand
BD+C’s inaugural AEC innovation conference, Accelerate Live! (May 11, Chicago), featured talks on machine learning, AI, gaming in construction, maker culture, and health-generating buildings.
Building Team Awards | Jun 14, 2017
3D-printed office: Office of the Future
Dubai kicks off 3D-printing tech initiative with a novel office project.
3D Printing | Jun 14, 2017
This is the world’s first building completely 3D printed onsite
The building is a lab for research on drones and 3D printing technology.
| Jun 13, 2017
Accelerate Live! talk: Incubating innovation through R&D and product development, Jonatan Schumacher, Thornton Tomasetti
Thornton Tomasetti’s Jonatan Schumacher presents the firm’s business model for developing, incubating, and delivering cutting-edge tools and solutions for the firm, and the greater AEC market.