When HOK took on the role of primary design consultant for the Anaheim Regional Transportation Intermodal Center (ARTIC), the firm knew that the existing soil conditions would make it virtually impossible to building a conventional structure on the site. Doing so would have required extensive foundation and site work that would have busted the budget.
With its partner Parsons Brinckerhoff, the design team prime consultant for the city of Anaheim, HOK came up with a “pillow” system based on ETFE, a copolymer of ethylene and tetrafluoroethylene, to create a lightweight arching diagrid structure. First, however, the team had to supply extensive information and analysis of the material to local fire, building code, and safety authorities to gain approval for the use of ETFE.
ARTIC is now the largest ETFE project in North American. It uses more than 200,000 sf of the membrane system in its primary shell. Specifying ETFE also created the added benefit of providing UV protection within a column-free, extensively daylit environment to travelers and visitors to the transit hub.
The 67,880-sf, LEED Platinum facility brings together 10 modes of transportation, among them the Orange County Transportation Authority, Metrolink, Amtrak, local shuttles and bus systems, and tour buses, not to mention the cyclists and pedestrians.
The Building Team made sure the facility could eventually be connected with California’s planned high-speed rail system.
The city of Anaheim’s bold commitment to this project has made this intermodal facility the new “Gateway to Orange County.”
PROJECT SUMMARY
HONORABLE MENTION
Anaheim Regional Transportation Intermodal Center
Anaheim, Calif.
BUILDING TEAM
Submitting firm: HOK (primary project designer)
Owner: City of Anaheim
Design team prime consultant: Parsons Brinckerhoff
Structural engineer: Thornton Tomasetti
MEP engineer: Buro Happold
Construction manager STV Group
General contractor: Clark Construction Group
GENERAL INFORMATION
Project size: 67,880 sf
Construction cost: $185 million
Construction time: September 2012 to December 2014
Delivery method: Design-bid-build
Related Stories
Building Team Awards | Jun 8, 2017
Team win: Clemson University Allen N. Reeves Football Operations Complex
Silver Award: Clemson gets a new football operations palace, thanks to its building partners’ ability to improvise.
Building Team Awards | Jun 8, 2017
Narrow site, broad vision: LA Metro Light Rail Operations & Maintenance Facility
Gold Award: A slender building site had direct implications for the design of this light-rail facility.
Building Team Awards | Jun 8, 2017
Missing link: Denver International Airport and Transit Center
Gold Award: A new mixed-use transit center fulfills Denver’s 28-year plan to improve access to the nation’s fifth-busiest airport.
Building Team Awards | Jun 7, 2017
Rising above adversity: National Museum of African American History and Culture
Gold Award: The Smithsonian Institution’s newest museum is a story of historical and construction resolve.
Building Team Awards | Jun 7, 2017
Justice league: United States courthouse
Gold Award: The Building Team for L.A.’s newest courthouse went way beyond what was expected.
Building Team Awards | Jun 7, 2017
Blurring the lines: University of Chicago North Residential Commons
Gold Award: The University of Chicago’s new Residential Commons is part campus, part community.
Building Team Awards | Jun 7, 2017
Rebuilding to heal: Sandy Hook Elementary School
Gold Award: Community involvement was paramount as Newtown, Conn., replaced the school where a mass shooting occurred.
Building Team Awards | Jun 6, 2017
Nerves of steel: 150 North Riverside
Platinum Award: It took guts for a developer and its Building Team to take on a site others had shunned for most of a century.
Building Team Awards | Jun 1, 2016
Multifamily tower and office building revitalize Philadelphia cathedral
The Philadelphia Episcopal Cathedral capitalizes on hot property to help fund much needed upgrades and programs.
Building Team Awards | Jun 1, 2016
Central utility power plant takes center stage at UC San Diego Jacobs Medical Center
An undulating roof, floor-to-ceiling glass, and façade scheme give visual appeal to a plant that serves the 10-story medical center.