flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Architects propose sustainable ‘vertical city’ in the Sahara

High-rise Construction

Architects propose sustainable ‘vertical city’ in the Sahara

Designers aim to make the 1,476-foot tower sustainable, relying on rainwater collection, solar power, and geothermal energy.


By BD+C Staff | April 22, 2015
Architects propose sustainable ‘vertical city’ in Sahara

Agriculture will be planted in a central tower inside the main structure, so that produce is protected from the harsh desert conditions. Renderings courtesy OXO Architectes

Building in the Sahara seems to be in the minds of many French architects lately. Aside from Parisian practice XTU Architects’ sand-and-bubble building method for shelters in one of the world’s most inhospitable landscapes, OXO Architectes and Nicolas Laisné Associés—both also from the greater Paris area—revealed their own proposal for the Sahara, a futuristic mixed-use tower called The City Sand Tower, Gizmag reports.

Relying on rainwater collection, solar power, and geothermal energy, the designers aim to make this so-called “vertical city” a sustainable one. The project description says that the building will be 1,476 feet with a total floor space of 192 acres.

According to renderings released by OXO Architectes, agriculture will be planted in a central tower inside the main structure, so that produce is protected from the harsh desert conditions.

Around 22% of the structure’s space will be allocated to office space, 17.5% for hotel space, 15% for housing, and the remaining available space for a shopping center, sports area, museum, spa, dining locations, and conference rooms. The cherry on top is a meteorological observatory and a heliport.

The firms said they imagine the project to start construction in 2025, with construction phased over 50 years, Gizmag reports.

Read the full story at Gizmag.

 

Related Stories

| Apr 6, 2012

Flat tower green building concept the un-skycraper

A team of French designers unveil the “Flat Tower” design, a second place winner in the 2011 eVolo skyscraper competition.

| Apr 4, 2012

Bald joins the Harmon glazing team

Bald has 13 years of experience in the glazing industry, coming to Harmon from Trainor where he was the regional manager of the Mid-Atlantic region.

| Apr 2, 2012

Mitsubishi unveils ultra-high-speed elevator for Shanghai skyscraper

The operation of the elevator is scheduled to begin in 2014.

| Mar 27, 2012

Bank of America Plaza becomes Atlanta's priciest repo

Repo will help reset market prices for real estate, and the eventual new owner will likely set rental rates at a new or near the bottom and improve the facilities to lure tenants.

| Mar 26, 2012

McCarthy tops off Math and Science Building at San Diego Mesa College

Designed by Architects | Delawie Wilkes Rodrigues Barker, the new San Diego Mesa College Math and Science Building will provide new educational space for students pursuing degree and certificate programs in biology, chemistry, physical sciences and mathematics.

| Mar 16, 2012

Temporary fix to CityCenter's Harmon would cost $2 million, contractor says

By contrast, CityCenter half-owner and developer MGM Resorts International determined last year that the Harmon would collapse in a strong quake and can't be fixed in an economical way. It favors implosion at a cost of $30 million.

| Mar 14, 2012

Hearing to decide fate of unfinished Harmon in Las Vegas under way

The testimony began with CityCenter consulting engineer Chukwuma Ekwueme methodically showing photo after photo of parts of the Harmon, where he and his team had chipped away the concrete pillars and beams to examine the steel reinforcing bars inside.

| Mar 14, 2012

Plans for San Francisco's tallest building revamped

The glassy white high-rise would be 60 stories and 1,070 feet tall with an entrance at First and Mission streets.

| Mar 13, 2012

China's high-speed building boom

A 30-story hotel in Changsha went up in two weeks. Some question the safety in that, but the builder defends its methods.

| Mar 12, 2012

Improving the performance of existing commercial buildings: the chemistry of sustainable construction

Retrofitting our existing commercial buildings is one of the key steps to overcoming the economic and environmental challenges we face.

boombox1
boombox2
native1

More In Category




Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021