flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Arizona Army National Guard Readiness Center awarded LEED Silver

Arizona Army National Guard Readiness Center awarded LEED Silver

LEED certification of the AZ ARNG Readiness Center was based on a number of green design and construction features SAIC implemented that positively impacted the project and the broader community.


By Posted by Tim Gregorski, Senior Editor | May 23, 2012
Interior lighting system designs that reduce night sky light pollution and suppo
Interior lighting system designs that reduce night sky light pollution and support the nocturnal ecosystem.

The Arizona Army National Guard (AZ ARNG) Readiness Center in Florence, Ariz., has been awarded LEED Silver certification, as established by the U.S. Green Building Council (USGBC) and verified by the Green Building Certification Institute (GBCI). Science Applications International Corporation (SAIC), through its wholly owned subsidiary SAIC Energy, Environment & Infrastructure, LLC, provided design and contract administration services for the facility, including sustainable design and LEED administration services.

LEED certification of the AZ ARNG Readiness Center was based on a number of green design and construction features SAIC implemented that positively impacted the project and the broader community. These features included:

  • Preferred parking stalls for low-emitting and fuel-efficient vehicles and covered parking for motorcycles to encourage use of alternative means of transportation.
  • Exterior and interior lighting system designs that reduce night sky light pollution and support the nocturnal ecosystem.
  • Mechanical systems that reduce energy costs by 29%, thus saving money for AZ ARNG while lessening the building’s impact on greenhouse gas emissions.
  • Low-flow plumbing fixtures that result in a 40% reduction in water usage, saving money and contributing to a more secure water future.
  • Solar heated water system that reduces energy costs for hot water.
  • Sustainable materials that contained 30% recycled content--more than 20% of which was harvested and manufactured within 500 miles of the project site.
  • Wood products used in the project harvested from Forest Stewardship Council certified forests.
  • More than 85% of construction and demolition waste diverted from landfill to be either recycled or salvaged for reuse.
  • Interior finish materials, paint coatings, sealants, and adhesives that meet low-volatile organic compound standards. +  

Related Stories

| Jun 19, 2014

First Look: 10 Design unveils new luxury apartments plan in Dubai

The Seventh Heaven complex features a stepped form that will offer stunning views of the Dubai skyline.

| Jun 19, 2014

First look: JDS Architects' roller-coaster-like design for Istanbul waterfront development

The development's wavy and groovy design promises unobstructed views of the Marmara Sea for every unit.

| Jun 19, 2014

NCARB study: Architects getting licensed at younger age

A new report from NCARB shows that the median age of people at initial licensure is at a 10 year low.

| Jun 19, 2014

Singapore's 'Tree House' vertical gardens break Guinness World Record

The high-rise development will have a 24,638-sf vertical garden, breaking a Guinness World Record.

| Jun 18, 2014

Design tips for Alzheimer care facilities

A new white paper from the Alzheimer’s Foundation of America and Perkins Eastman details best design practices for residential care settings for individuals living with Alzheimer’s disease. 

| Jun 18, 2014

BSB Design Reinforces Client-Focus Legacy With Recent Changes

His 26-plus year history with BSB Design paired with his client relations skills and operational and organizational acumen make Swift well-suited to perpetuate the legacy of founder Jack Bloodgood: That everyone deserves to live in a home designed by an architect.

| Jun 18, 2014

Largest Passive House structure in the U.S. to be built in Oregon

Orchards at Orenco, a 57-unit affordable housing complex in Hillsboro, Oregon, is the first of a three-phase, three-building complex.

| Jun 18, 2014

SOM's twisting tower wins design competition for Sweden's tallest skyscraper

The skyscraper, which will reach 230 meters and is named Polstjärnan, or "The Pole Star," is to be built in Gothenburg, Sweden. 

| Jun 18, 2014

Study shows walkable urbanism has positive economic impact

Walkable communities have a higher GDP, greater wealth, and higher percentages of college grads, according to a new study by George Washington University.

| Jun 18, 2014

Ware Malcomb names Sorensen Engineering Regional Manager

New hire will oversee firm's civil engineering practice in Los Angeles, San Diego, and Irvine.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021