flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Artesa at Menifee Town Center provides urban-style living in a small-town setting

Multifamily Housing

Artesa at Menifee Town Center provides urban-style living in a small-town setting

MBK Rental Living is the project’s developer.


By David Malone, Managing Editor | July 19, 2021
Artesa exterior
Artesa exterior

Artesa at Menifee Town Center, a Spanish mission-style apartment community in Menifee, Calif., is a new 15-acre community that includes 37 two- and three-story walk-up apartment buildings.

The community features one-, two-, and three-bedroom options across eight open-concept floor plans ranging from approximately 820 sf to 1,322 sf. Apartment units include interior finishes such as modern cabinetry, quartz countertops, stainless-steel GE appliances, full-size washers and dryers, wood-style flooring, and private garages.

 

Artesa living room

 

Amenities include a resort-style pool and spa, a large entertaining clubhouse with a full kitchen and a sports TV wall for community events, two fitness centers, common-area WiFi access, a barbecue area, an outdoor California lounge with dual fireplaces, a playground, package lockers, and a dog wash and park.

 

Artesa at Menifee amenities

 

Artesa is located within walking distance to numerous shopping, dining, and entertainment options located at the 172-acre Menifee Town Center. The development is also close to Menifee Lakes Plaza, the City of Menifee Civic Center, Mt. San Jacinto College, and Menifee Lakes Country Club and Golf Course.

The project partners for Artesa at Menifee Town Center include R.D. Olson Construction, SummA Architecture, Gouvis Engineering, Alliance Residential Company and Sitescapes.

 

Artesa Fitness center

 

Artesa pool

Related Stories

Multifamily Housing | May 19, 2017

Above + Beyond: condo tower built atop parking structure

How designers figured out a way to nestle an 18-story condo tower on top of an existing parking structure in Hawaii.

Multifamily Housing | May 17, 2017

Swedish Tower’s 15th floor is reserved for a panoramic garden

C.F. Møller’s design was selected as the winner of a competition organized by Riksbyggen in Västerås.

Mixed-Use | May 17, 2017

The Lincoln Common development has begun construction in Chicago’s Lincoln Park

The mixed-use project will provide new apartments, condos, a senior living facility, and retail space.

High-rise Construction | May 15, 2017

Construction begins on 47-story luxury tower in Chicago’s South Loop

The glass tower is being built at 1326 S. Michigan Avenue.

Multifamily Housing | May 10, 2017

May 2017 National Apartment Report

Median one-bedroom rent rose to $1,012  in April, the highest it has been since January.

Multifamily Housing | May 10, 2017

Triple Treat: Developer transforms mid-rise into unique live-work lofts

Novus Residences’ revolutionary e-lofts concept offers tenants a tempting trio of options—‘live,’ ‘live-work,’ or ‘work’—all on the same floor.

Multifamily Housing | May 3, 2017

Silicon Valley’s high-tech oasis

An award-winning rental complex takes its design cues from its historic location in Silicon Valley.

Multifamily Housing | May 2, 2017

Multifamily housing: 7 exciting, inspiring innovations [AIA Course]

This AIA CES course features seven novel approaches developers and Building Teams are taking to respond to competitive pressures and build more quickly and with more attractive offerings.

Multifamily Housing | Apr 26, 2017

Multifamily amenity trends: The latest in package delivery centers

Package delivery centers provide order and security for the mountains of parcels piling up at apartment and condominium communities.

Multifamily Housing | Apr 26, 2017

Huh? A subway car on the roof?

Chicago’s newest multifamily development features an iconic CTA car on its amenity deck. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021