A $60 million public-private investment is catalyzing the resurgence of 2.41 acres of public land along Coney Island’s boardwalk into a dynamic civic space called Seaside Park and Community Arts Center.
This project included the restoration of the landmark Childs Restaurant, which opened in 1923 but had fallen into decay. Its last tenant, a candy maker, vacated the property in the 1980s.
The restaurant, newly reopened under the name Kitchen 21, is positioned as a dining companion to the neighboring 5,000-seat Ford Amphitheater. To accommodate the theater’s 60x40-foot stage, the restaurant’s walls, roof, and floors were reinforced before removing over 10% of its first floor and 25% of its western wall.
The Building Team installed more than a dozen exterior doors, six of which weigh 15 tons each. When the doors roll up, the restaurant becomes a backstage area for the theater, and affords patrons a view of the stage, making Kitchen 21 a year-round performance space.
The reconstruction included an award-winning restoration of the distinctive Spanish Colonial terra cotta façade, with its maritime allusions, and the original rooftop timber pergola. The interior color palette draws its inspiration from materials original to the space: pale, sandy yellow bricks for the exterior walls, and terrazzo floors that blend greens, golds, and sandy tones, accented by brass strips.
This open, flexible dining/hospitality space introduces five dining concepts: a casual grab-and-go; a “test kitchen” with frequent menu changes; a clam bar with communal seating; a gastropub with an 85-foot bar and 32 beers on tap; and a rooftop bar with ocean views. Coney Island’s famous Parachute Jump tower is visible through the windows of the main bar.
Legends Hospitality, which manages Yankee Stadium’s dining options, runs Kitchen 21 for owner/developer iStar.
Project Summary
Gold Award Winner
Building Team: EwingCole (submitting firm, interior design) Gerner Kronick + Valcarcel (architect) iStar (owner) WSP USA (SE) CFS Engineering (MEP) Chapel Street Consultants (GC) Newbanks (CM).
Details: 14,000 sf (restaurant), 6,000 sf (roof). Construction cost: $6.7 million (includes kitchen costs). Construction time: May 2015 to May 2017. Delivery method: Schematic design/bid/design-assist/build.
See all of the 2017 Reconstruction Award winners here
Related Stories
Reconstruction Awards | Nov 26, 2019
Sweetest sounds: Metropolitan Opera House
An early 20th-century opera house now hosts concerts from Disney Acapella to Weezer.
Reconstruction Awards | Nov 25, 2019
The University of Chicago Harris School at the Keller Center
Project team goes all out for LEED Platinum and the Living Building Challenge.
Reconstruction Awards | Nov 22, 2019
Let there be light: Union Station Great Hall
What’s the cure for a leaky skylight? Another skylight built above it, of course.
Reconstruction Awards | Nov 21, 2019
Temporary quarters: Senate of Canada Building
Canada’s Senate gets an interim home in what was once the capital’s main train station.
Reconstruction Awards | Nov 19, 2019
Springfield Technical Community College: Goodbye to 'the shuffle'
College unites student services under one roof.
Reconstruction Awards | Nov 18, 2019
The Paint Factory: Not just a new coat of paint
An enlightened A/E firm is spurring redevelopment in an old industrial section of Little Rock.
Reconstruction Awards | Nov 15, 2019
Back on track: Union Terminal renovation and restoration
Painstaking care went into restoring Cincinnati’s train terminal/museum complex.
Reconstruction Awards | Nov 14, 2019
Museum at the Gateway Arch: Subterranean sensation
The project team used its creativity to overcome floods and other obstacles to construction.
Reconstruction Awards | Nov 13, 2019
Zachry Engineering Education Complex: Rethinking engineering education
Texas A&M’s engineering school builds for future growth.
Reconstruction Awards | Nov 12, 2019
Linode Headquarters: High-tech + historic
New headquarters mixes old and new to help this fast-growth company attract top talent.