A $60 million public-private investment is catalyzing the resurgence of 2.41 acres of public land along Coney Island’s boardwalk into a dynamic civic space called Seaside Park and Community Arts Center.
This project included the restoration of the landmark Childs Restaurant, which opened in 1923 but had fallen into decay. Its last tenant, a candy maker, vacated the property in the 1980s.
The restaurant, newly reopened under the name Kitchen 21, is positioned as a dining companion to the neighboring 5,000-seat Ford Amphitheater. To accommodate the theater’s 60x40-foot stage, the restaurant’s walls, roof, and floors were reinforced before removing over 10% of its first floor and 25% of its western wall.
The Building Team installed more than a dozen exterior doors, six of which weigh 15 tons each. When the doors roll up, the restaurant becomes a backstage area for the theater, and affords patrons a view of the stage, making Kitchen 21 a year-round performance space.
The reconstruction included an award-winning restoration of the distinctive Spanish Colonial terra cotta façade, with its maritime allusions, and the original rooftop timber pergola. The interior color palette draws its inspiration from materials original to the space: pale, sandy yellow bricks for the exterior walls, and terrazzo floors that blend greens, golds, and sandy tones, accented by brass strips.
This open, flexible dining/hospitality space introduces five dining concepts: a casual grab-and-go; a “test kitchen” with frequent menu changes; a clam bar with communal seating; a gastropub with an 85-foot bar and 32 beers on tap; and a rooftop bar with ocean views. Coney Island’s famous Parachute Jump tower is visible through the windows of the main bar.
Legends Hospitality, which manages Yankee Stadium’s dining options, runs Kitchen 21 for owner/developer iStar.
Project Summary
Gold Award Winner
Building Team: EwingCole (submitting firm, interior design) Gerner Kronick + Valcarcel (architect) iStar (owner) WSP USA (SE) CFS Engineering (MEP) Chapel Street Consultants (GC) Newbanks (CM).
Details: 14,000 sf (restaurant), 6,000 sf (roof). Construction cost: $6.7 million (includes kitchen costs). Construction time: May 2015 to May 2017. Delivery method: Schematic design/bid/design-assist/build.
See all of the 2017 Reconstruction Award winners here
Related Stories
Reconstruction Awards | Nov 12, 2018
Cincinnati Music Hall: Saving a cultural anchor
Cincinnati uses ‘skillful triage’ to bring its endangered Music Hall up to date.
Reconstruction Awards | Dec 1, 2017
Rescue mission: Historic movie palace is now the centerpiece of Baltimore’s burgeoning arts hub
In restoring the theater, the design team employed what it calls a “rescued ruin” preservation approach.
Reconstruction Awards | Dec 1, 2017
Gothic revival: The nation’s first residential college is meticulously restored
This project involved the renovation and restoration of the 57,000-sf hall, and the construction of a 4,200-sf addition.
Reconstruction Awards | Dec 1, 2017
Rockefeller remake: Iconic New York tower is modernized for its next life
To make way for new ground-floor retail and a more dramatic entrance and lobby, the team removed four columns at the ground floor.
Reconstruction Awards | Nov 30, 2017
BD+C's 2017 Reconstruction Award Winners
Provo City Center Temple, the Union Trust Building, and the General Motors Factory One are just a few of the projects recognized as 2017 Reconstruction Award winners.
Reconstruction Awards | Nov 29, 2017
College credit: Historic rehab saves 50% on energy costs
The project team conducted surveys of students, faculty, and staff to get their input.
Reconstruction Awards | Nov 29, 2017
Amazing grace: Renovation turns a church into elegant condos
The windows became The Sanctuary’s chief sales edge.
Reconstruction Awards | Nov 28, 2017
Broadway melody: Glass walls set just the right tone for a historic lobby in Lower Manhattan
The adaptation of the 45,000-sf neoclassical lobby at 195 Broadway created three retail spaces and a public walkway.
Reconstruction Awards | Nov 27, 2017
Higher education: The rebirth of a Washington, D.C., high school
The project team, led by architect Perkins Eastman, restored the original cupola.
Reconstruction Awards | Nov 27, 2017
Bank statement: A project team saves a historic bank, yielding 100% leaseup for the developer
The project team had to fix poor renovations made in the ’50s.