Construction on The MahaNakhon Tower, Bangkok’s tallest building, may have recently been completed, but for anyone looking at the massive skyscraper, they may be left wondering, has that building finished downloading?
A unique façade of spiraling cube-shaped balconies provides the building with its eye-catching look, one that brings a pixelated aesthetic into the real world. The 1,030-foot building is the work of Büro Ole Scheeren, an international architecture firm with offices in Hong Kong, Beijing, Bangkok, and Berlin.
The building’s design, according to architect Ole Scheeren, is meant to reflect the city in which it resides. In an interview with CNN, Scheeren says, “MahaNakhon is a vision of a tower that is very much about process, about becoming, about developing." And the building certainly captures that idea, as, even in its completed form, it seems unfinished and still in the building process, as if you will blink and upon opening your eyes, the jagged building will have completed its rendering process and appear crisp and clear on the Bangkok skyline.
Oddly enough, however, it is the fictional version of the “completed” MahaNakhon Tower that would appear out of place. Currently, the building fits right in with the other futuristic and architecturally unique buildings comprised in the Bangkok skyline (such as one meant to resemble a robot and another meant to mimic the appearance of an elephant).
The mixed-use building includes retail space, a hotel, and 200 condo units that are under the management of Ritz-Carlton Residences.
Photo courtesy of Kyle Hasegawa, Wikimedia Creative Commons
Related Stories
| Feb 13, 2013
'Vegetative tower' apartments to revive NYC site
A Manhattan site formerly slated for development with a "tower of cubes"—a now-defunct project by Santiago Calatrava—will be revived with a 998-foot, 300,000-sf apartment building by Morali Architects.
| Jul 9, 2012
Modular Construction Delivers Model for New York Housing in Record Time
A 65-unit supportive housing facility in Brooklyn, N.Y., was completed in record time using modular construction with six stories set in just 12 days.
| Jul 2, 2012
San Francisco lays claim to the greenest building in North America
The 13-floor building can hold around 900 people, but consumes 60% less water and 32% less energy than most buildings of its kind.
| Jun 13, 2012
Thornton Tomasetti founding principals receive CTBUH Fazlur R. Khan Lifetime Achievement Medal
This is the first time the CTBUH Board of Trustees has awarded the prize to two individuals jointly.
| Jun 8, 2012
Thornton Tomasetti/Fore Solutions provides consulting for renovation at Tufts School of Dental Medicine
Project receives LEED Gold certification.
| Jun 6, 2012
KPF designs tower for Yongsan IBD
The master plan, created by Studio Daniel Libeskind, is a dynamic urban environment containing contributions from 19 different architects practicing in diverse locations around the globe.
| Jun 6, 2012
SOM urges Chicago tenants to partner with landlords to cut energy use
Tenants can exceed building energy challenge targets recently announced by Mayor Emanuel.
| Jun 1, 2012
New BD+C University Course on Insulated Metal Panels available
By completing this course, you earn 1.0 HSW/SD AIA Learning Units.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.