1. Vinyl Flooring
Parterre
Project: Pointe Place, Dover, N.H. Problem: A durable flooring product was needed to withstand the rigors of multifamily living. Solution: 50,000 sf of Parterre’s Winter Oak and Evening Oak wood-look vinyl flooring options were used in the kitchens, living areas, entry ways, closets, and laundry rooms of each unit. On the team: Summit Land Development (developer).
Insulation and roofing
Atlas Roofing
Project: Veterans Community Project, Kansas City, Mo. Problem: VCP, a community of tiny homes to help combat veteran homelessness, needed an affordable insulation and roofing approach that would ensure long-term cost-efficiency. Solution: Atlas Roofing donated Atlas EnergyShield, ACFoam CrossVent, Pinnacle Pristine with Scotchgard, and ThermalStar X-Grade to the project. The products helped VCP tiny homes achieve thermal performance of the building envelope to save money and increase energy efficiency. On the team: AG3 Architects (architect).
3. Acoustic Panels
Kirei
Project: Rowayton Elementary School, Norwalk, Conn. Problem: The school’s new full-time cafeteria needed an acoustic solution that could double as a key design element. Solution: Custom-cut acoustic panels from Kirei were incorporated into the cafeteria’s nautical theme. A whale made from seven individual pieces of EchoPanel, acoustic clouds, and custom-cut pieces (also made from EchoPanel) meant to mimic waves embrace the new cafeteria’s design while improving the cafeteria’s acoustics. The acoustic whale is about 40 feet long and 11 feet tall. On the team: Antinozzi Associates (architect).
4. Metal Building
Star Building Systems
Project: Templeton Rye Distillery, Templeton, Iowa. Problem: A new Templeton distillery was needed to meet high demand. Solution: Multiple metal building systems were used to create the design of a tall central tower section that houses the distillation equipment with the lower rooflines spreading around it. The central section is made up of two metal building systems, a tall one with a smaller one on top of it to create the point of the tower. The walls were then closed with Metl-Span insulated metal panels provided by Star. On the team: Simonson & Associates Architects (architect), Iron Steel Co. (wall and roof panel installation), Edge Commercial (GC).
5. architectural glass
J.E. Berkowitz
Courtesy Tom Crane.
Project: Terminal F, Philadelphia International Airport. Problem: One of airport’s busiest terminals underwent a massive modernization to accommodate increased traffic. Solution: J.E. Berkowitz fabricated more than 7,000 sf of glass for the project. This included 141 Winduo insulating glass units in 125 shapes and sizes for the new baggage claim building, and an Invisiwall point-supported glass canopy spanning the building’s outside pick-up zone. JEB also fabricated an Invisiwall point-supported glass wall with 2,400 sf of Fusion laminated glass. On the team: The Sheward Partnership (architect).
6. Lighting Controls
ETC
Project: Ocean5, Middleton, Wis. Problem: The multipurpose facility’s bowling alley required lighting controls that would simplify the complex lighting display. Solution: ETC’s Paradigm, Echo, and Mosaic controls were installed. Mosaic runs shows on LEDs that light mesh paneling behind each lane and DMX-controlled fixtures within the pinsetters. The shows are triggered by inputs on the Paradigm Touchscreens. Echo daylight and occupancy sensors are used to adjust lights to the appropriate levels.
Related Stories
| Sep 12, 2011
Putting a stamp on USPS's first green roof
The Morgan Building roof totals 150,000-sf. In addition to a vegetated green roof, other roof areas were upgraded and included 55,000-sf of reflective concrete pavers and ballast, which were also placed over a Sarnafil waterproofing membrane, and 40,000-sf of EnergySmart Roof—a reflective, energy-efficient vinyl roofing system from Sika Sarnafil.
| Sep 9, 2011
Kauffman Center for the Performing Arts in Kansas City opens this month
Theatre Projects played the lead role in theatre design and planning as well as in engineering the customized theatre equipment. BNIM in Kansas City served as the executive architect.
| Aug 19, 2011
Enhanced acoustical design
Ambient noise levels in some facility types are trending up and becoming a barrier to clear communication between building occupants.
| Jul 22, 2011
The Right Platform for IPD
Workstations for successful integrated project delivery, a white paper by Dell and BD+C.
| Jul 22, 2011
Air barrier systems: Your guide to optimal performance
Expert advice on how to control wasteful air leakage in the building envelope.