At approximately 280,000-sf, The Smile, a new mixed-use development design by Bjarke Ingles Group, bridges Harlem’s active 125th Street corridor and the quieter 126th Street.
The project will combine a nursing school on the street level with residential apartment units above. One-third of the apartments will be affordable units. The project’s T-shaped footprint will offer a diverse set of unit sizes and layouts while also strengthening the connection with neighboring buildings. The southern cantilevered portion of the building will appear to hover over the existing commercial building on 125h Street, creating a dynamic component in the evolving uptown streetscape.
Interior spaces comprise raw architectural materials such as wood, exposed concrete, and exposed steel trusses. Entrances are tiled with splashes of colored concrete that draws inspiration from the neighborhood’s murals.
Building amenities include a fitness center, a media room, relaxation spas, social lounges, and workspaces that overlook a three-story gallery. Located on the roof will be whirlpool spas, a swimming pool, and roof decks surrounded by landscaped features that provide space for social activities and gatherings.
The building’s facade gently slopes inwards as it rises, softening the hard linear street edge. This design allows the building massing to comply with the city’s zoning envelope while also enabling the residential street to have more direct sunlight. The interlocking checkerboard facade panel system allows for floor-to-ceiling windows in each residential unit.
Related Stories
| Aug 11, 2010
Arup, SOM top BD+C's ranking of the country's largest mixed-use design firms
A ranking of the Top 75 Mixed-Use Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants
| Aug 11, 2010
10% of world's skyscraper construction on hold
Emporis, the largest provider of global building data worldwide, reported that 8.7% of all skyscrapers listed as "under construction" in its database had been put on hold. Most of these projects have been halted in the second half of 2008. According to Emporis statistics, the United States had been hit the worst: at the beginning of 2008, "Met 3" in Miami was the only U.S. skyscraper listed as being "on hold". In the second half of the year, 19 projects followed suit.
| Aug 11, 2010
Structure Tone, Turner among the nation's busiest reconstruction contractors, according to BD+C's Giants 300 report
A ranking of the Top 75 Reconstruction Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants
| Aug 11, 2010
Portland Cement Association offers blast resistant design guide for reinforced concrete structures
Developed for designers and engineers, "Blast Resistant Design Guide for Reinforced Concrete Structures" provides a practical treatment of the design of cast-in-place reinforced concrete structures to resist the effects of blast loads. It explains the principles of blast-resistant design, and how to determine the kind and degree of resistance a structure needs as well as how to specify the required materials and details.
| Aug 11, 2010
New website highlights government tax incentives for large commercial buildings
Energy Retrofit Group (ERG), the subsidiary of 40-year-old, award-winning Adache Group Architects, Inc., has announced the creation of their new energy conservation web site: www.energy-rg.com.
| Aug 11, 2010
Gensler, HOK, HDR among the nation's leading reconstruction design firms, according to BD+C's Giants 300 report
A ranking of the Top 100 Reconstruction Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants
| Aug 11, 2010
The Joule Hotel
Dallas, Texas
The Joule Hotel in Dallas, designed by local firm Coburn & Smith, was constructed in 1927 as the Dallas National Bank Building. Originally one of the finest examples of gothic revival architecture in Texas, it had had most of its gothic elements removed over the years after being converted into an office building and later abandoned. What was left had fallen into disrepair.
| Aug 11, 2010
AECOM, WATG top BD+C's ranking of the nation's 75 largest hotel design firms
A ranking of the Top 75 Hotel Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants