A 24-story, 100-meter mixed-use tower is set to rise in Quito, Ecuador, the greenest capital in South America.
The BIG-designed building, dubbed EPIQ, is located on the southern tip of La Carolina Park in the center of the city on a quarter-of-a-circle site across from the new Quito subway. The building was designed with rounded corners to allow for panoramic views of the city while minimizing impact from neighboring buildings to daylight exposure. This rounded corner design creates a facade that is a continuously wrapping envelope, meaning the building has no back side.
At EPIQ’s base a pedestrian through-block connection forms a new gateway to a nearby park and the recently completed subway. Also located at the base are offices, lobbies, retail, and a restaurant. The above floors house residential and amenity spaces.
See Also: New social campus for innovators, tech leaders covers a full city block
As the building rises, soft openings are carved into the building mass to create eight district blocks. These buildings within a building are all connected via large, communal green terraces at different elevations to create a vertical neighborhood. The terraces also allow daylight to permeate the entire building.
The building’s colors and patterns are reflective of the earth tones and herringbone pattern of the tiles seen throughout the streets of Quito’s Old City. The facade pattern is based on the scale of the individual apartments with red and pink hues that give each volume its own identity.
The project is currently in progress.
Related Stories
| Aug 11, 2010
Arup, SOM top BD+C's ranking of the country's largest mixed-use design firms
A ranking of the Top 75 Mixed-Use Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants
| Aug 11, 2010
10% of world's skyscraper construction on hold
Emporis, the largest provider of global building data worldwide, reported that 8.7% of all skyscrapers listed as "under construction" in its database had been put on hold. Most of these projects have been halted in the second half of 2008. According to Emporis statistics, the United States had been hit the worst: at the beginning of 2008, "Met 3" in Miami was the only U.S. skyscraper listed as being "on hold". In the second half of the year, 19 projects followed suit.
| Aug 11, 2010
Structure Tone, Turner among the nation's busiest reconstruction contractors, according to BD+C's Giants 300 report
A ranking of the Top 75 Reconstruction Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants
| Aug 11, 2010
Portland Cement Association offers blast resistant design guide for reinforced concrete structures
Developed for designers and engineers, "Blast Resistant Design Guide for Reinforced Concrete Structures" provides a practical treatment of the design of cast-in-place reinforced concrete structures to resist the effects of blast loads. It explains the principles of blast-resistant design, and how to determine the kind and degree of resistance a structure needs as well as how to specify the required materials and details.
| Aug 11, 2010
New website highlights government tax incentives for large commercial buildings
Energy Retrofit Group (ERG), the subsidiary of 40-year-old, award-winning Adache Group Architects, Inc., has announced the creation of their new energy conservation web site: www.energy-rg.com.
| Aug 11, 2010
Gensler, HOK, HDR among the nation's leading reconstruction design firms, according to BD+C's Giants 300 report
A ranking of the Top 100 Reconstruction Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants
| Aug 11, 2010
The Joule Hotel
Dallas, Texas
The Joule Hotel in Dallas, designed by local firm Coburn & Smith, was constructed in 1927 as the Dallas National Bank Building. Originally one of the finest examples of gothic revival architecture in Texas, it had had most of its gothic elements removed over the years after being converted into an office building and later abandoned. What was left had fallen into disrepair.
| Aug 11, 2010
AECOM, WATG top BD+C's ranking of the nation's 75 largest hotel design firms
A ranking of the Top 75 Hotel Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants