The Firehouse Shelter, an outreach program of the Cooperative Downtown Ministries, provides an emergency shelter, a day shelter, meals, clothing closets, and addiction and literacy programs to up to 100 homeless men in Birmingham, Ala.
At its founding, in 1983, the shelter was housed in an old fire station. Over time, as the firehouse began to crumble, demand for services soared, and maintenance costs shot up, it became clear to the ministries that they needed a new, larger building.
It took two years to raise the nearly $5.7 million to build the new structure. The city contributed $1 million; the bulk of the money came from individuals and local charitable foundations.
The crossed structural steel beams of the chapel provide an uplifting setting for meditation and prayer.
During that time, a design-build team led by Dunn Building Company met with the shelter’s staff to understand the most critical operational aspects of a facility for the homeless. The kitchen staff offered ideas on how to set up the food storage, food prep, and serving areas. Security personnel explained why certain areas of the building needed to be locked down at various times.
Shelter coordinators described the special needs of overnight guests. This led to the development of a three-tiered system of living quarters where guests can move up in privacy, based on how actively they participate in the shelter’s social programs.
Two factors emerged as paramount: durability/low maintenance, and a desire to create an inviting, non-institutional feeling. CMU, polished concrete, and epoxy-coated concrete were used on the walls and floors to ensure these elements would be highly durable, washable, and still have eye appeal. All finishes were selected with durability and cleanability in mind. The shelter area was equipped with hose bibs built into the walls so that living areas and heavily trafficked spaces could be easily washed down. Each bedding space has floor drains.
A walk-in plumbing chase between the main shower area and main toilet area provides ready access to pipes and fixtures that are most likely to need service. Restrooms were designed with durability and serviceability in mind.
The team worked diligently to select furniture, flooring, and equipment that would serve the needs of the shelter occupants, provide durability, look good, and fit within the $202/sf construction framework.
To create an aesthetically pleasing, cost-effective facility, Poole & Company Architects and structural engineer MBA Engineers designed a pre-engineered structure clad in horizontal ribbed insulated metal panels, enhanced by vertical trim between the panels and fire engine red trim at the windows and storefronts.
Just as Dunn Building Company broke ground, down came the rains—17 days of downpours in the first 35 days on site. Rather than try to recondition the wet, fatty clay soil, the contractor replaced it with a more suitable sandy clay. That effort took time and money, but the contractor had no choice, and the project still came in on time and within the budget.
The new Firehouse Shelter, with twice the beds (100) of the old facility, opened on February 18, giving renewed hope to Birmingham’s homeless.
The three-tier system of housing enables guests to go from open sleeping quarters, to semi- private quarters, to graduated bedding, based on their level of participation in the facility’s addiction, GED/literacy, employment, and faith-based programs. The shelter also has limited emergency accommodations for up to two families.
Judges’ Comments
Juror Josh Greenfield, praised the project team for providing an outdoor courtyard/place of respite, plenty of natural light, and a meditation space (the chapel). Judges also noted that the constructors had to work within a building site that touched the property line on three sides, leaving little room for laying down materials and maneuvering equipment. Deliveries had to be received and unloaded in the street; materials had to be stored out of the way of construction activities, requiring precise coordination with all trade contractors on site.
Submitting firm/General contractor: Dunn Building Company
Owner: The Firehouse Shelter
Architect: Poole & Company Architects
Structural Engineer: MBA Engineers
Mechanical/plumbing engineer: RJ Mechanical
Electrical engineer: Wadsworth Electric/Hyde Engineering
Size: 28,000 sf
Construction cost: $5,659,000
Construction time: January 2019 to February 2020
Delivery method: Design-build
Photo credit: Edward Badham / EB Visual Productions
Related Stories
Building Team Awards | Jun 8, 2017
Narrow site, broad vision: LA Metro Light Rail Operations & Maintenance Facility
Gold Award: A slender building site had direct implications for the design of this light-rail facility.
Building Team Awards | Jun 8, 2017
Missing link: Denver International Airport and Transit Center
Gold Award: A new mixed-use transit center fulfills Denver’s 28-year plan to improve access to the nation’s fifth-busiest airport.
Building Team Awards | Jun 7, 2017
Rising above adversity: National Museum of African American History and Culture
Gold Award: The Smithsonian Institution’s newest museum is a story of historical and construction resolve.
Building Team Awards | Jun 7, 2017
Justice league: United States courthouse
Gold Award: The Building Team for L.A.’s newest courthouse went way beyond what was expected.
Building Team Awards | Jun 7, 2017
Blurring the lines: University of Chicago North Residential Commons
Gold Award: The University of Chicago’s new Residential Commons is part campus, part community.
Building Team Awards | Jun 7, 2017
Rebuilding to heal: Sandy Hook Elementary School
Gold Award: Community involvement was paramount as Newtown, Conn., replaced the school where a mass shooting occurred.
Building Team Awards | Jun 6, 2017
Nerves of steel: 150 North Riverside
Platinum Award: It took guts for a developer and its Building Team to take on a site others had shunned for most of a century.
Building Team Awards | Jun 1, 2016
Multifamily tower and office building revitalize Philadelphia cathedral
The Philadelphia Episcopal Cathedral capitalizes on hot property to help fund much needed upgrades and programs.
Building Team Awards | Jun 1, 2016
Central utility power plant takes center stage at UC San Diego Jacobs Medical Center
An undulating roof, floor-to-ceiling glass, and façade scheme give visual appeal to a plant that serves the 10-story medical center.
Building Team Awards | May 31, 2016
Gonzaga's new student center is a bustling social hub
Retail mall features, comfortable furniture, and floor-to-ceiling glass add vibrancy to the new John J. Hemmingson Center.