flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Birmingham's haven for the homeless

Building Team Awards

Birmingham's haven for the homeless

A coalition of ministries raised millions to build a new home for homeless men in Alabama’s largest city. The Firehouse Shelter wins Honorable Mention in the 2020 Building Team Awards.


By Robert Cassidy, Executive Editor | November 3, 2020
Firehouse Shelter exterior at dusk

Birmingham’s Firehouse Shelter opened in February. In addition to living spaces, the shelter has medical exam rooms, a restful courtyard, a chapel, a classroom/training area, and case management offices where social workers can consult privately with residents. All photos: Edward Badham / EB Visual Productions

The Firehouse Shelter, an outreach program of the Cooperative Downtown Ministries, provides an emergency shelter, a day shelter, meals, clothing closets, and addiction and literacy programs to up to 100 homeless men in Birmingham, Ala.

At its founding, in 1983, the shelter was housed in an old fire station. Over time, as the firehouse began to crumble, demand for services soared, and maintenance costs shot up, it became clear to the ministries that they needed a new, larger building.

It took two years to raise the nearly $5.7 million to build the new structure. The city contributed $1 million; the bulk of the money came from individuals and local charitable foundations.

 

Firehouse Shelter ChapelThe crossed structural steel beams of the chapel provide an uplifting setting for meditation and prayer.

 

During that time, a design-build team led by Dunn Building Company met with the shelter’s staff to understand the most critical operational aspects of a facility for the homeless. The kitchen staff offered ideas on how to set up the food storage, food prep, and serving areas. Security personnel explained why certain areas of the building needed to be locked down at various times.

Shelter coordinators described the special needs of overnight guests. This led to the development of a three-tiered system of living quarters where guests can move up in privacy, based on how actively they participate in the shelter’s social programs.

Two factors emerged as paramount: durability/low maintenance, and a desire to create an inviting, non-institutional feeling. CMU, polished concrete, and epoxy-coated concrete were used on the walls and floors to ensure these elements would be highly durable, washable, and still have eye appeal. All finishes were selected with durability and cleanability in mind. The shelter area was equipped with hose bibs built into the walls so that living areas and heavily trafficked spaces could be easily washed down. Each bedding space has floor drains.

 

Firehouse Shelter shower roomA walk-in plumbing chase between the main shower area and main toilet area provides ready access to pipes and fixtures that are most likely to need service. Restrooms were designed with durability and serviceability in mind.

 

The team worked diligently to select furniture, flooring, and equipment that would serve the needs of the shelter occupants, provide durability, look good, and fit within the $202/sf construction framework.

To create an aesthetically pleasing, cost-effective facility, Poole & Company Architects and structural engineer MBA Engineers designed a pre-engineered structure clad in horizontal ribbed insulated metal panels, enhanced by vertical trim between the panels and fire engine red trim at the windows and storefronts.

Just as Dunn Building Company broke ground, down came the rains—17 days of downpours in the first 35 days on site. Rather than try to recondition the wet, fatty clay soil, the contractor replaced it with a more suitable sandy clay. That effort took time and money, but the contractor had no choice, and the project still came in on time and within the budget.

The new Firehouse Shelter, with twice the beds (100) of the old facility, opened on February 18, giving renewed hope to Birmingham’s homeless.

 

The three-tier system of housing enables guests to go from open sleeping quarters, to semi- private quarters, to graduated bedding, based on their level of participation in the facility’s addiction, GED/literacy, employment, and faith-based programs. The shelter also has limited emergency accommodations for up to two families.

 

Judges’ Comments
Juror Josh Greenfield, praised the project team for providing an outdoor courtyard/place of respite, plenty of natural light, and a meditation space (the chapel). Judges also noted that the constructors had to work within a building site that touched the property line on three sides, leaving little room for laying down materials and maneuvering equipment. Deliveries had to be received and unloaded in the street; materials had to be stored out of the way of construction activities, requiring precise coordination with all trade contractors on site.

 

Submitting firm/General contractor: Dunn Building Company

Owner: The Firehouse Shelter 

Architect: Poole & Company Architects 

Structural Engineer: MBA Engineers 

Mechanical/plumbing engineer: RJ Mechanical 

Electrical engineer: Wadsworth Electric/Hyde Engineering

Size: 28,000 sf 

Construction cost: $5,659,000 

Construction time: January 2019 to February 2020 

Delivery method: Design-build

Photo credit: Edward Badham / EB Visual Productions 

Related Stories

Building Team Awards | Jun 11, 2019

Learning by doing: Students took an active role in the design of the Bay Area's d.tech high school

Gold Award: D.tech had been occupying temporary spaces that were hardly suited for design thinking.

Building Team Awards | Jun 10, 2019

Technology showcase: PTC's new digs combine lively workspaces with exhibits for its products and platforms

Gold Award: PTC began its fitout even as 121 Seaport was still under construction.

Building Team Awards | Jun 7, 2019

Fast delivery: Construction of McDonald's global headquarters was completed in under seven months

Gold Award: The building has a remarkably diverse array of spaces that include “work neighborhoods.”

Building Team Awards | Jun 7, 2019

Unifying force: A place where a million Tulsans can connect, one by one

Platinum Award: Gathering Place is a 66½-acre public park and playground serving the nearly one million residents of greater Tulsa, Okla.

Building Team Awards | May 24, 2018

Green machine: Janet Durgin Guild and Commons at Sonoma Academy

Honorable Mention: A college prep school gets an uber-green maker space and cooking lab.

Building Team Awards | May 24, 2018

Good neighbor: Wentz Science Center at North Central College

Bronze Award: A conscientious Building Team takes steps to minimize the impact of this large-scale science center project in a historic neighborhood.

Building Team Awards | May 23, 2018

13 projects earn BD+C's 2018 Building Team Awards

Iowa’s game-changing correctional institution and Chicago’s daring hotel and sports development are among 13 projects to earn honors in BD+C’s 2018 Building Team Awards.

Building Team Awards | May 23, 2018

Engineered for extremes: Talan Towers

Bronze Award: Astana’s shimmering mixed-use towers are made to stand up to the region’s harsh, long winters.

Building Team Awards | May 22, 2018

High-tech haven: The Spark at Washington State University

Silver Award: A ‘teaching in the round’ classroom highlights this innovation hub at Washington State University’s Pullman campus.

Building Team Awards | May 22, 2018

LA's game changer: Wilshire Grand Center

Silver Award: This billion-dollar mixed-use tower will alter the Los Angeles skyline in more ways.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021