When it comes to extreme weather, only one other capital city across the globe (Ulaanbaatar, Mongolia) faces harsher winter conditions than Astana, Kazakhstan. Astana’s average annual temperature is 38 F, with long, dry, bitterly cold winters that regularly reach −22 F to −31 F between November and March. During the summer months, it’s not unusual for temperatures to soar above 90 F, making for wild seasonal temperature swings.
Astana’s extreme conditions, combined with the region’s fairly remote location, placed numerous obstacles in front of the Building Team for the Talan Towers development. This 1.36 million-sf mixed-use project brings several “firsts” to this budding capital city, including its first Class A office space and its first luxury hotel, the Astana – The Ritz-Carlton.
The development comprises a 30-story office tower and a 26-story residential and hotel tower, linked by a three-story podium containing retail outlets. Three restaurants, an events center, and a spa and fitness center round out the programming.
To ensure that the building’s façade would stand up to the harsh conditions, including average wind speeds of about 10 mph, the exterior design models were tested in wind tunnels by German wind engineering firm Wacker Ingenieure. The curtain wall façade was fitted with floor-to-ceiling, triple-glazed units engineered to keep the cold and solar heat transmission at bay, while allowing natural light to flood the interior. The interior spaces are adorned with warm materials—marble, wood, gold motif—that contrast with the cold weather outside.
Finding qualified contractors and suppliers was a major concern for the project team, since local expertise was in short supply. Turner assembled a team of mostly global consultants from diverse geographical regions—Australia, Austria, Finland, Germany, Italy, Jordan, Latvia, Serbia, South Korea, U.S., U.K., and the United Arab Emirates—who co-located in Astana for the duration of the project. Daily “war room” meetings, weekly “look-ahead” programs, and monthly workshops helped to keep the project on schedule.
As Astana’s first luxury mixed-use development, Talan Towers features interior spaces adorned with opulent materials and detailing, including custom marble and gold motif. Verny Capital / Astana Property Management.
Building Team — Submitting firm, construction manager Turner International Owners Verny Capital, Astana Property Management Architect Skidmore, Owings & Merrill Architect of record Light House Kazakhstan Interior architects CallisonRTKL UK (retail), Perkins+Will UK (offices, common areas), Richmond (hotel) MEP, structural engineer Design Grup General contractor Renaissance Construction CJSC
General Information — Size 1.36 million sf Construction cost Confidential at client’s request Construction time September 2013 to December 2017 Delivery method Design-bid-build, with CM
RETURN TO THE 2018 BUILDING TEAM AWARDS LANDING PAGE
Related Stories
| Aug 29, 2022
Montana becomes first U.S. state to approve 3D printing in construction
Montana is the first U.S. state to give broad regulatory approval for 3D printing in building construction.
Architects | Apr 22, 2022
Top 10 green building projects for 2022
The American Institute of Architects' Committee on the Environment (COTE) has announced its COTE Top Ten Awards for significant achievements in advancing climate action.
Concrete Technology | Apr 19, 2022
SGH’s Applied Science & Research Center achieves ISO 17025 accreditation for concrete testing procedures
Simpson Gumpertz & Heger’s (SGH) Applied Science & Research Center recently received ISO/IEC17025 accreditation from the American Association for Laboratory Accreditation (A2LA) for several concrete testing methods.
2021 Building Team Awards | Jan 14, 2022
First public-private partnership project in Veterans Administration history saves $34 million in costs
LEO A DALY and McCarthy Building Companies head the project team for the Omaha VA Ambulatory Care Center in BD+C’s 2021 Building Team Awards.
Building Team Awards | Dec 8, 2021
A performing arts center celebrates a legendary rocker and his birthplace
Buddy Holly Hall in Texas receives BD+C’s Silver Building Team Award.
Building Team Awards | Dec 7, 2021
A rapid response to a health emergency
Baptist Hospital of Miami’s 233-bed Hope Tower receives BD+C’s Bronze Building Team Award
Building Team Awards | Dec 3, 2021
Putting science on display, thanks to a design-build approach
UC Riverside’s Plant Growth Environments Facility receives BD+C’s Bronze Building Team Award.
Building Team Awards | Dec 2, 2021
An academic ‘precinct’ brings arts and sciences together
Wofford College’s Chandler Center for Environmental Studies receives BD+C’s Silver Building Team Award.
Building Team Awards | Dec 1, 2021
Denver sets the bar for water reclamation and reuse
A new administration building for the city’s water utility company scores Platinum in BD+C’s 2021 Building Team Awards.
2021 Building Team Awards | Nov 17, 2021
Caltech's new neuroscience building unites scientists, engineers to master the human brain
The Tianqiao and Chrissy Chen Institute for Neuroscience at the California Institute of Technology in Pasadena wins a Gold Award in BD+C's 2021 Building Team Awards.