When it comes to extreme weather, only one other capital city across the globe (Ulaanbaatar, Mongolia) faces harsher winter conditions than Astana, Kazakhstan. Astana’s average annual temperature is 38 F, with long, dry, bitterly cold winters that regularly reach −22 F to −31 F between November and March. During the summer months, it’s not unusual for temperatures to soar above 90 F, making for wild seasonal temperature swings.
Astana’s extreme conditions, combined with the region’s fairly remote location, placed numerous obstacles in front of the Building Team for the Talan Towers development. This 1.36 million-sf mixed-use project brings several “firsts” to this budding capital city, including its first Class A office space and its first luxury hotel, the Astana – The Ritz-Carlton.
The development comprises a 30-story office tower and a 26-story residential and hotel tower, linked by a three-story podium containing retail outlets. Three restaurants, an events center, and a spa and fitness center round out the programming.
To ensure that the building’s façade would stand up to the harsh conditions, including average wind speeds of about 10 mph, the exterior design models were tested in wind tunnels by German wind engineering firm Wacker Ingenieure. The curtain wall façade was fitted with floor-to-ceiling, triple-glazed units engineered to keep the cold and solar heat transmission at bay, while allowing natural light to flood the interior. The interior spaces are adorned with warm materials—marble, wood, gold motif—that contrast with the cold weather outside.
Finding qualified contractors and suppliers was a major concern for the project team, since local expertise was in short supply. Turner assembled a team of mostly global consultants from diverse geographical regions—Australia, Austria, Finland, Germany, Italy, Jordan, Latvia, Serbia, South Korea, U.S., U.K., and the United Arab Emirates—who co-located in Astana for the duration of the project. Daily “war room” meetings, weekly “look-ahead” programs, and monthly workshops helped to keep the project on schedule.
As Astana’s first luxury mixed-use development, Talan Towers features interior spaces adorned with opulent materials and detailing, including custom marble and gold motif. Verny Capital / Astana Property Management.
Building Team — Submitting firm, construction manager Turner International Owners Verny Capital, Astana Property Management Architect Skidmore, Owings & Merrill Architect of record Light House Kazakhstan Interior architects CallisonRTKL UK (retail), Perkins+Will UK (offices, common areas), Richmond (hotel) MEP, structural engineer Design Grup General contractor Renaissance Construction CJSC
General Information — Size 1.36 million sf Construction cost Confidential at client’s request Construction time September 2013 to December 2017 Delivery method Design-bid-build, with CM
RETURN TO THE 2018 BUILDING TEAM AWARDS LANDING PAGE
Related Stories
Building Team Awards | Jun 12, 2019
Delectable design: A traditional French pastry was the concept behind the Krause Gateway Center
Gold Award: Krause Gateway Center’s striking design takes its cue from the traditional French dessert mille feuille.
Building Team Awards | Jun 11, 2019
Learning by doing: Students took an active role in the design of the Bay Area's d.tech high school
Gold Award: D.tech had been occupying temporary spaces that were hardly suited for design thinking.
Building Team Awards | Jun 10, 2019
Technology showcase: PTC's new digs combine lively workspaces with exhibits for its products and platforms
Gold Award: PTC began its fitout even as 121 Seaport was still under construction.
Building Team Awards | Jun 7, 2019
Fast delivery: Construction of McDonald's global headquarters was completed in under seven months
Gold Award: The building has a remarkably diverse array of spaces that include “work neighborhoods.”
Building Team Awards | Jun 7, 2019
Unifying force: A place where a million Tulsans can connect, one by one
Platinum Award: Gathering Place is a 66½-acre public park and playground serving the nearly one million residents of greater Tulsa, Okla.
Building Team Awards | May 24, 2018
Green machine: Janet Durgin Guild and Commons at Sonoma Academy
Honorable Mention: A college prep school gets an uber-green maker space and cooking lab.
Building Team Awards | May 24, 2018
Good neighbor: Wentz Science Center at North Central College
Bronze Award: A conscientious Building Team takes steps to minimize the impact of this large-scale science center project in a historic neighborhood.
Building Team Awards | May 23, 2018
13 projects earn BD+C's 2018 Building Team Awards
Iowa’s game-changing correctional institution and Chicago’s daring hotel and sports development are among 13 projects to earn honors in BD+C’s 2018 Building Team Awards.
Building Team Awards | May 22, 2018
High-tech haven: The Spark at Washington State University
Silver Award: A ‘teaching in the round’ classroom highlights this innovation hub at Washington State University’s Pullman campus.
Building Team Awards | May 22, 2018
LA's game changer: Wilshire Grand Center
Silver Award: This billion-dollar mixed-use tower will alter the Los Angeles skyline in more ways.