flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Bjarke Ingels-designed KING Toronto releases its final set of luxury penthouses

Building Team

Bjarke Ingels-designed KING Toronto releases its final set of luxury penthouses

Two years ago, the mixed-use development, now under construction, sold a penthouse for a record-breaking $16 million.


By Novid Parsi, Contributing Editor | May 18, 2022
KING Toronto penthouses ext
KING Toronto forms a new architectural typology for downtown Toronto, regarded as one of the most iconic builds in the city’s recent history. Courtesy KING Toronto.

In April 2020, a penthouse at KING Toronto sold for $16 million, the highest condo sale in Toronto that year or the year after. In recent weeks, developers Westbank and Allied released KING Toronto’s final set of penthouses.

On Toronto’s King Street West, KING Toronto, a mixed-use development now under construction, stacks terraced units into four “mountain peaks” that overlook a central courtyard. Each unit faces out at a 45-degree angle, creating an undulating appearance that contrasts with typical flat building facades. Designed by Bjarke Ingels Group (BIG) and inspired by Moshe Safdie’s Habitat ’67 and Pierre Chareau’s Maison de Verre, KING Toronto offers downtown Toronto a distinctly different architectural style.

KING Toronto’s six penthouses sit atop its four peaks. The name of each penthouse reflects the custom designs by BIG. Treehouse features an indoor mature planted tree, for instance, while Bibliothèque has a two-floor library. The final two penthouses are the Glass House and the Sanctuary.

The Glass House is a 3-bedroom, 3.5-bath unit with 2,919 interior square feet and 640 exterior square feet. A gray marble fireplace forms the centerpiece of the main double-height living room. Dark steel elements include a staircase and floor-to-ceiling wine storage. The Glass House also includes a library, in addition to a series of terraces and balconies.

The Sanctuary is a 3-bedroom, 2.5-bath unit with 2,026 interior square feet and 516 exterior square feet. It keeps with the modern industrial theme of its neighbor, the Glass House. Likewise light-filled and open, the Sanctuary also has multiple glass-block walls and features a floating fireplace in blackened steel and a staircase of deep black oak.

When complete, KING Toronto will include 440 residential homes and 150,000 square feet of workspace and retail. 

Building Team:

Architect of record: Diamond Schmitt

Mechanical engineer: Reinbold Engineering Group

Electrical engineer: Nemetz (S/A) & Associates Ltd.

Structural engineer: RJC Engineers

General contractor/construction manager: EllisDon

KING penthouse indoor pool
The penthouse purchaser worked with BIG’s design team to create a custom home that included an indoor pool. Courtesy KING Toronto.
KING Penthouse int 2
Courtesy KING Toronto.
KING Toronto Dining Interior
Courtesy KING Toronto
KING Toronto Penthouse Hot Tub
Courtesy KING Toronto.

 

Related Stories

Sponsored | | Jun 18, 2015

How to earn respect as a leader

Employees will give you minimum effort if the only reason they respect you is for your authority

Building Materials | Jun 12, 2015

Construction materials prices up in May, down year-over-year

Prices for inputs to construction industries rose by 1.1% in May—the largest month-over-month increase in more than two years.

Office Buildings | Jun 12, 2015

Houston's energy sector keeps office construction humming

Colliers International projects continued expansion this year in its quarterly report on national office market. 

Office Buildings | Jun 11, 2015

Pop-up tree-office opens in London borough of Hackney

London's Hackney borough welcomed a new kind of workspace to Hoxton Square—the TreexOffice.

Office Buildings | Jun 9, 2015

Hines planning $300 million office tower for Denver skyline

Designed by Pickard Chilton, the 640,000-sf tower is geared for large-scale tenants, with features like floor-to-ceiling glass, a 5,000-sf fitness center, a tenant lounge, and a series of outdoor terraces. 

Sponsored | Building Team | Jun 9, 2015

Is your firm social enough?

The overwhelming majority of A/E/C firms are engaged in social media. But to what end? 

Contractors | Jun 8, 2015

ABC: 49 states report decline in construction unemployment rate

Five Plain States reported the lowest unemployment rates for construction workers in April. 

Sponsored | Metals | Jun 4, 2015

How big of a building do I need?

Here is some advice on how metal buildings can be a solution for space shortages

Sponsored | Building Team | Jun 3, 2015

Succession planning starts with developing your leaders

Two-thirds of U.S. companies still admit that they have no formal succession plan in place, a 2014 survey conducted by the National Association of Corporate Directors found.

Building Team | Jun 3, 2015

Irvin E. Richter of Hill International receives Lifetime Achievement Award from CMAA's Mid-Atlantic Chapter

The award was given in recognition of his dedication, innovation and leadership in the area of project management and construction claims services

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021