flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Bjarke Ingels Group and Skanska to deliver 1550 on the Green, one of the most sustainable buildings in Texas

Office Buildings

Bjarke Ingels Group and Skanska to deliver 1550 on the Green, one of the most sustainable buildings in Texas

The 28-story downtown Houston office tower targets 60% reduced embodied carbon and provides 30% more fresh air than traditional office buildings.


By Novid Parsi, Contributing Editor | August 10, 2023
Bjarke Ingels Group and Skanska to deliver 1550 on the Green, one of the most sustainable buildings in Texas
Rendering courtesy BIG

In downtown Houston, Skanska USA’s 1550 on the Green, a 28-story, 375,000-sf office tower, aims to be one of Texas’ most sustainable buildings. The $225 million project has deployed various sustainable building materials, such as less carbon-intensive cement, to achieve 60% reduced embodied carbon.

Located next to Discovery Green, a 12-acre public park, 1550 on the Green is the first phase of Discovery West, a mixed-use project that will span three blocks.

Designed by Bjarke Ingels Group (BIG), the building’s curved shape, described as a side-core design, allows unobstructed daylight to enter the oversized windows. The curved design provides views of Discovery Green, more efficient floor plates, more natural light than traditional floor plates, and natural light in the elevator lobby and restrooms. The building also uses air-handling technology that provides 30% more fresh air than traditional office buildings.

Bjarke Ingels Group and Skanska to deliver 1550 on the Green, one of the most sustainable buildings in Texas
Rendering courtesy BIG

1550 on the Green offers touchless turnstiles and secure access points, as well as a building app for tenants. In addition to multiple levels of outdoor terraces with native plants, 1550 on the Green includes a bike storage room, a 7,000 sf spa-like fitness center, a 9,400 sf tenant-exclusive rooftop event space and conference center, and 7,000 sf of ground-level retail with over 5,000 sf of patio directly across from Discovery Green. Michael Hsu Office of Architecture designed the fitness center and other tenant amenity spaces.

1550 on the Green has been designed to achieve LEED Platinum certification. Completion is expected by the end of the year.

On the Building Team:    
Owner/developer: Skanska USA Commercial Development    
Design architect: Bjarke Ingels Group (BIG)    
Architect of record: Kendall Heaton    
Landscape architect: SWA Group    
Interior design architect: Michael Hsu Office of Architecture    
MEP engineer: Wylie Engineering    
Structural engineer: Walter P Moore    
General contractor: Skanska USA Building

Bjarke Ingels Group and Skanska to deliver 1550 on the Green, one of the most sustainable buildings in Texas
Rendering courtesy BIG
Bjarke Ingels Group and Skanska to deliver 1550 on the Green, one of the most sustainable buildings in Texas
Rendering courtesy BIG
Bjarke Ingels Group and Skanska to deliver 1550 on the Green, one of the most sustainable buildings in Texas
Photo courtesy Skanska USA
Bjarke Ingels Group and Skanska to deliver 1550 on the Green, one of the most sustainable buildings in Texas
Photo courtesy Skanska USA
Bjarke Ingels Group and Skanska to deliver 1550 on the Green, one of the most sustainable buildings in Texas
Photo courtesy Skanska USA

 

Related Stories

Office Buildings | Aug 4, 2021

‘Lighthouse’ office tower will be new headquarters for A2A in Milan

The tower, dubbed Torre Faro, reimagines the company’s office spaces to adapt to people’s ever-changing needs at work.

High-rise Construction | May 27, 2021

The anti-high rise: Seattle's The Net by NBBJ

In this exclusive video interview for HorizonTV, Ryan Mullenix, Design Partner with NBBJ, talks with BD+C's John Caulfield about a new building in Seattle called The Net that promotes wellness and connectivity. 

Mixed-Use | Apr 22, 2021

Jakarta’s first supertall tower tops out

The project will anchor the Thamrin Nine development.

High-rise Construction | Jan 20, 2021

Casablanca Finance City Tower becomes Morphosis’ first project in Africa

The tower is the first building completed in Casablanca Finance City.

Products and Materials | Sep 23, 2020

A new portable restroom is designed for mobility

Lendlease invented the H3 Wellness Hub, which can include natural lighting and UV bacteria control.

High-rise Construction | Mar 20, 2020

Edge, the Western Hemisphere’s highest outdoor skydeck opens

The attraction is part of 30 Hudson Yards.  

High-rise Construction | Nov 6, 2019

AS+GG releases design scheme for the South HeXi Yuzui Financial District and Tower

The firm won an international design competition for the project in 2018.

High-rise Construction | Oct 7, 2019

A giant shipwreck sculpture highlights the proposal for Prague’s tallest building

Sculptor David Černý and architect Tomáš Císař from the studio Black n´ Arch designed the project.

High-rise Construction | Oct 4, 2019

KPF-designed CITIC tower is Beijing’s tallest

The tower is the fourth tallest in China and the eighth tallest in the world.

boombox1
boombox2
native1

More In Category




Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021