5 ways virtual modeling can improve facilities management

5 ways virtual modeling can improve facilities management


Skanska | January 12, 2014
For Good Samaritan Hospital, Skanska and the project team created a single enhanced interface for facilities management, streamlining the day-to-day building management process.

Building information modeling (BIM) has become standard practice for design and construction, but often little attention is paid to what happens to model data post-construction.

At Skanska, we’re engaging with our clients to think about ways we can use BIM data to help improve the entire lifecycle of a building, not just its construction. For a facility owner, that’s where BIM can have the most long-lasting benefits. Below are five ways virtual modeling can improve facilities management:

1. Improved space management. By understanding the details of how space is used, facility professionals can reduce vacancy and ultimately achieve major reductions in real estate expenses. Including room and area information in BIM models is the foundation for good space management, aiding in the collection of data as well as any renovation work.

At George Washington University in Washington, D.C., Skanska is creating protocols for the management and storage of such data so that it is consistent for historical and future work.  GW will use these new processes to be more efficient at operating and maintaining its campuses.

2. Streamlined maintenance. A key challenge in developing a maintenance program is entering into databases the product and asset information required for preventive maintenance. Storing this data in BIM models – and potentially downloading it into the facility management system –  can eliminate months of effort to accurately populate maintenance systems while providing better performance.

Read more posts from Skanska's Constructive Thinking Blog at blog.usa.skanska.com.

With BIM, a maintenance engineer is able to access maintenance information by clicking on the object in the model. Or even better, the system would know when maintenance is required, and would send an alert. 

For the Good Samaritan Hospital in Payallup, Wash., Skanska helped to integrate a BIM model with ArtrA software, which allowed the facilities management  team to navigate through the 3-D as-built drawings. This saved time planning preventive maintenance, as the integrated model has pre-mapped viewpoints, easy access to operations and maintenance documents, drawings and training videos, all accessible through a single interface.

3. Efficient use of energy. By streamlining the maintenance process through BIM, this allows equipment to be more properly maintained to the optimal environmental conditions, avoiding the waste associated with increased operating costs for facilities not operating as intended.

On the Tier III, LEED Gold data center for eBay in South Jordan, Utah, Skanska supplied the client with a detailed as-built BIM model and integrated it with the facility’s building maintenance and automation systems. The model is now used as a comprehensive portal to obtain information and statistics for every piece of equipment in the data center, including temperatures, flux and pressures for mechanical systems, as well as power consumption and utilization for electrical and IT equipment. Such granular data is crucial to continuous improvement of the data center’s performance and energy efficiency

4. Economical retrofits and renovations. Better information about existing conditions helps reduce the cost and complexity of renovation and retrofit projects, as well as aids in avoiding costly mistakes associated with changes that don’t comply with code requirements

5. Enhanced lifecycle management. Some building design professionals are embedding data on life expectancy and replacement costs in BIM models, thereby helping an owner understand benefits of investing in materials and systems that may cost more initially but have a better payback over the life of the building. There is also the ability to track depreciation of assets to fully recognize financial and tax benefits, all of which can be managed through data obtained from BIM.

As BIM grows in popularity, it’s the responsibility of the design and construction industry to recognize this  technology’s full potential for the lifecycle of a building. An example of that is the BIM protocol plan we’re developing for George Washington University, a plan that’s creating new standards and approaches in facilities management.

With this, the protocols our team is developing – which are to be included in future university design and construction contracts – will address such elements as how the model is set up and how that model is shared between architects and construction managers, and later how an integrated model is delivered. We’re creating a living document for the campus. This is the next step for virtual model integration and an important development in thinking holistically about our industry’s role in the lifecycle of a building.

About the Author
Jennifer Macks is a Vice President with Skanska USA 

More from Author

Skanska | Sep 26, 2024

5 lessons in water mitigation for mass timber projects

Sustainability leaders from Skanska, RDH, and Polygon share five tips for successful water mitigation in mass timber construction.

Skanska | May 6, 2024

The benefits of biophilic design in the built environment

Biophilic design in the built environment supports the health and wellbeing of individuals, as they spend most of their time indoors.

Skanska | Dec 4, 2023

4 key innovations and construction trends across airport design

Here are some of the key trends Skanska is seeing in the aviation sector, from congestion solutions to sustainability.

Skanska | Jun 29, 2023

K-12 school construction: 5 ways strong community relations can lead to success

When constructing a K-12 school, building positive relationships with the community—including students, parents, school staff and residents—is critical to the success of the project. Here are five ways Skanska puts the community first when building K-12 schools in the Pacific Northwest.

Skanska | Mar 14, 2023

Skanska tests robots to keep construction sites clean

What if we could increase consistency and efficiency with housekeeping by automating this process with a robot? Introducing: Spot.

Skanska | Jan 27, 2023

Key takeaways from Autodesk University 2022

Autodesk laid out its long-term vision to drive digital collaboration through cloud-based solutions and emphasized the importance of connecting people, processes and data.

Skanska | Dec 5, 2022

5 ways sustainability professionals can help reduce construction's carbon footprint

Mark Chen, Sustainability Manager at Skanska, has found five specific ways to help the construction industry reduce its carbon footprint.

Skanska | Jul 5, 2022

Tour the new Patricia Reser Center for the Arts in Oregon

This month, the community of Beaverton, Oregon, welcomed a new haven for artistic expression with the opening of Patricia Reser Center for the Arts (The Reser).

Skanska | Jun 22, 2018

What owners should know before choosing the design-build project delivery method

Outside of drawing up a well-written contract, owners often overlook a key attribute that can significantly impact the success of a design-build project, writes Skanska’s Julie Hyson.

Skanska | Dec 7, 2017

Busting the myths: What the “S-word” can mean for construction and development

Sustainability, it’s a trendy term. The problem, however, is that it’s being used in so many different ways that people don’t even know what it means anymore.

boombox1
boombox2
native1

More In Category

Healthcare Facilities

Future proofing hospitals

By improving the physical layout of hospitals and medical facilities, we can enhance and increase safety mechanisms, improve care, and help reduce the exposure to medical errors, writes Skanska USA's Andrew Quirk.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021