While browsing through some magazines on a recent flight, I read a cautionary tale about one of the first BIM-related lawsuits. The parties involved in this university building project kept their identities private, but it’s been reported that they settled out of court for millions of dollars. The crux of the issue centered on the lack of communication between the Architect, Mechanical, Electrical and Plumbing Engineer and the Contractor.
The story goes that the Architect and the MEP Engineer used BIM to design the placement of the HVAC system into the ceiling plenum. In order for this design to fit it required a very specific sequence for installation. Not having communicated this information to the contractor, he installed as normal, ran out of space and was unable to finish his part of the project. The contractor sued the Owner, the Owner sued the Architect and the Architect’s insurer sued the MEP Engineer.Â
As we begin to see how beneficial BIM can be in facilitating meaningful collaboration, especially during the design phase of a project, we also see the potential pitfalls. As powerful as BIM can be to save time and money in needless reworks during the building process, it’s still only as good as our ability to communicate critical data to all stakeholders, prior to construction.
Where do you weigh in? Do you see a benefit to having contractors brought in early to further flush out the design discussions in BIM or do you prefer the old notification method downstream? Either way, it brings back memories of the CYA lesson I learned early on... paper trail or electronic trail, just make sure you’ve got a trail to cover your... well, you know how the saying goes.Â
More from Author
Sasha Reed | Dec 15, 2017
Future vs. current state of construction innovation: How will we make the leap?
Looking beyond today’s constraints to the possibility of what “could be” is a key characteristic of those defining and delivering innovation to design and building firms across the globe.
Sasha Reed | Sep 19, 2017
BIM vs VDC…how the US and the UK differ in approaching digital project delivery
In this four-part series, Bluebeam VP Sasha Reed sat down with industry experts to examine the need for defining and understanding digital workflows and data management throughout the design and construction project lifecycle.
Sasha Reed | Jul 19, 2017
Introducing StrXur by Bluebeam
Our goal is to present unique perspectives you may not be able to find anywhere else. Â
Sasha Reed | Jul 13, 2017
Defining the future by mastering the art of change
From my perspective, what separates organizations thriving in the digital revolution from those who are not boils down to one thing: leadership.
Sasha Reed | Mar 15, 2017
Incentivizing change: Show me the money
Who is succeeding, and on what terms? And what will it take for everyone to experience the benefits of that success?
Sasha Reed | Oct 4, 2016
The talent shortage: Will the training the AEC industry desperately needs arrive in time?
As the construction industry bounces back from the Great Recession, an entirely new class of tech-savvy construction professionals has been created, and the supply of these highly skilled, tech-proficient pros has been quickly exhausted.Â
Sasha Reed | Jul 11, 2016
Construction Disruption at AECX: Technology, hackathons and the promise of change in LA
The lead up to AECX featured a discussion providing insight into the current state of the AEC technological revolution by exploring opportunities, challenges and choices AEC pros face. Â
Sasha Reed | Jun 23, 2016
Implementing Change: The Five Biggest Mistakes to Avoid
Two truths from the jobsite: 1) The best part about uncovering a problem is discovering its solution, and 2) The worst part about discovering the solution is implementing it.Â
Sasha Reed | Jun 9, 2016
With all these sharks in the water… (No Predictions Here...Part 2)
Rather than fighting to control the proliferation of apps, perhaps we should be training our eyes to look for signs of long-term viability among all the fins in the water