Having access to the right workspace is important, regardless of location. A comfortable, efficient and attractive workspace can make all the difference for workers. For Hydro One Networks, an electricity transmission and distribution company based in Ontario, establishing well-equipped field offices in various remote locations was essential to success.
Hydro One’s distribution system is the largest in Ontario, spanning approximately 75 percent of the province. Responsible for serving approximately 1.4 million people in Ontario’s rural areas and municipalities, the company required space for field offices situated throughout the province. These field offices—which functioned as generating stations, distribution line project locations and forestry project sites—were needed immediately.
Hydro One selected Williams Scotsman as its partner for this endeavor based on previous successful collaboration on similar projects. Initially, a total of 25 custom-built wheeled units were supplied to various locations, totaling 9,970 sf of space. As we’ve discussed previously, modular design is extremely flexible and adaptable, allowing these types of offices to be designed to meet the demands of Hydro One employees in the field. These newly built custom units were metal-sided and equipped with security packages on both the doors and windows to offer an additional layer of safety. Double doors were constructed at the rear to easily store equipment as needed. Durable aluminum steps were also included with the custom offices, eliminating the need to build a set of stairs onsite.
Within one month of contact, Williams Scotsman delivered and installed the field offices throughout Ontario for Hydro One Networks. As of 2013, Williams Scotsman has supplied almost 75 of these custom units to Hydro One, providing comfortable and safe workspaces for employees’ daily use throughout the province.
One of the benefits of modular solutions is the quick turnaround time, allowing companies to continue working without diminishing productivity. By quickly establishing new field offices, Hydro One was able to ensure delivery of electricity to millions of residents throughout Canada.
Have you seen an interesting custom office in the field? Leave a comment or share an image so we can see it in action.
More from Author
Williams Scotsman | Mar 30, 2015
Spring cleaning tips for modular space
Modular structure manufacturer Williams Scotsman shares seven things to do to prep modular units for the spring.
Williams Scotsman | Mar 16, 2015
Modular Space Showcase: Helping BP take command in the Gulf of Mexico
Immediate emergency response to minimize and remedy environmental damage called for temporary, modular spaces.
Williams Scotsman | Mar 9, 2015
Drilling Deeper: Eagle Ford Shale moving up despite oil prices going down
Like many other energy hotbends throughout the continent, demand for modular structures isn't decreasing with oil prices
Williams Scotsman | Mar 3, 2015
Modular construction brings affordable housing to many New Yorkers
After city officials waived certain zoning and density regulations, modular microunits smaller than 400 square feet are springing up in New York.
Williams Scotsman | Feb 23, 2015
Modular Space Showcase: Sales center brings curb appeal
The Welcome Center received rave reviews from the customer as well as community residents and potential buyers.
Williams Scotsman | Feb 17, 2015
When lava flow in Hawaii threatens a public school district, officials turn to modular
Hawaii Modular Space, a Williams Scotsman company, designed temporary classroom space for the Pahoa and Keeau schools that would become displaced due to ongoing lava flow in Pahoa, Hawaii.
Williams Scotsman | Feb 5, 2015
3D printing has people in the building and construction industry talking
How can 3D printing affect the building design and construction industry?
Williams Scotsman | Feb 2, 2015
Modular Space Showcase: Getting down to business in Alberta’s oil sands
If you work in the energy sector you’ve heard of Alberta’s oil sands. Located in Western Canada, Alberta is a province with an abundance of natural resources. Oil sands are located in three major areas of northeast Alberta spanning hundreds of thousands of miles.
Williams Scotsman | Jan 19, 2015
Resolve to go green this year
Not every company can top Forbes magazine’s Most Sustainable Companies list, but we can all resolve to try to do more to protect the environment in 2015.
Williams Scotsman | Jan 5, 2015
Modular for a cause: Giving refugees much-needed space
Two years ago, the global flat-pack furniture giant IKEA tasked its philanthropic arm—the IKEA Foundation—with an important initiative. The goal was to design adequate modular shelters for people in refugee camps throughout the world. With a nearly $5 million investment, the foundation partnered with the United Nations Refugee Agency to develop and deliver secure and energy-efficient modular shelters to children and families in refugee camps around the world.