The new North Residential Commons on the University of Chicago campus is more than just a place for students to eat and sleep when they aren’t in class or studying. The 400,000-sf residence hall offers students a place to live that blurs the lines between a campus and a community.
Plazas, gardens, walkways, and courtyards connect four separate buildings that range from one to 15 floors. A single-story dining hall, equipped with floor-to-ceiling windows for abundant natural light, overlooks a central quad.
Eight “houses” accommodate 800 undergraduate students. Each house has its own hub, a three-story common area where students can gather, study, and relax. Also included are classrooms, music practice rooms, and 10,000 sf of ground-level retail space. A reading room resides on the top floor and offers views of the city and Lake Michigan.
An example of one of the three-story hubs. These hubs can be used by the students for anything ranging from studying to relaxing. Tom Harris Photography.
The Building Team used BIM to simplify the project’s complex geometry. Through the use of the model, the team was able to determine that the original knife-shaped edges of the exterior precast panels needed minor adjustments. The edges were susceptible to chipping, so the top edge of the panels was changed to a more blunt-shaped edge.
The building was designed to reflect the university’s distinctive housing system, where students of all years live and work together to achieve a higher level of social and academic success.
“More effective than the design was the extraordinary effort to meet the owner’s and users’ needs,” said Building Team Awards judge Peter Isaac, Vice President with Brailsford & Dunlavey, and a BD+C 2016 40 Under 40 honoree. “It is clear the Building Team worked in close coordination with the University of Chicago.”
Building Team – Submitting firm, general contractor Mortenson Construction Owner University of Chicago Architect Studio Gang Architects Structural engineer Magnusson Klemencic Associates Mechanical engineer dbHMS
General Information – Size 394,020 sf Cost $161 million Construction time July 2014 to September 2016 Delivery method Design-build
Related Stories
Building Team Awards | Jun 24, 2019
14 projects earn BD+C's 2019 Building Team Awards
The McDonald's Headquarters, the Rancho Los Amigos National Rehabilitation Center, and Pacific Visions at the Aquarium of the Pacific are three of the projects awarded with BD+C's 2019 Building Team Awards.
Building Team Awards | Jun 21, 2019
Up, up and away: Dutch hospitality chain completes the world's tallest modular hotel
Honorable mention: At 21 stories (15 of them modular), it is the world’s tallest modular hotel.
Building Team Awards | Jun 20, 2019
PPP gets the job done: Three-party deal saves time and money for client
Bronze Award: Weitz, acting as developer and design-builder, leased the land and borrowed the money for the project.
Building Team Awards | Jun 20, 2019
Making waves: The façade of Pacific Visions suggests the movement of water, day and night
Bronze Award: The new wing holds an exhibition space, a state-of-the-art 300-seat theater with a 32-foot-tall, 180-degree arc, 130-foot-long projection wall.
Building Team Awards | Jun 19, 2019
Unsung heroes: Two hurricanes couldn't stop this project team
Bronze Award: St. Lucie County’s population exploded to the point where the hospital needed lots more space.
Building Team Awards | Jun 19, 2019
Crime fighter: San Diego County's new forensic facility helps battle crime in three ways
Silver Award: The 158,000-sf addition collocates three crime-fighting functions.
Building Team Awards | Jun 18, 2019
All that urban jazz: Mixed-use center lends a zing to downtown Washington's skyline
Bureaucratic architecture, be damned!
Building Team Awards | Jun 18, 2019
Eyesore no more: People come together to expand a much-needed daycare center
Silver Award: Two problems quickly emerged: high concentrations of arsenic in the soil, and stormwater runoff into nearby wetlands and neighboring properties.
Building Team Awards | Jun 17, 2019
Campus renewal: Community effort saves a crucial healthcare resource
Silver Award: Taylor Design (architect) and SmithGroup (AOR) led an integrated design-build team anchored by McCarthy Building Companies (GC).
Building Team Awards | Jun 13, 2019
In the spotlight: Kinder High School for the Performing and Visual Arts shines a new beacon on Houston’s downtown
Gold Award: Kinder High School, which can accommodate 750 9th through 12th graders, is one of only three public schools in the U.S. that offer programs for both visual and performing arts.