flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

British Columbia hospital features mass timber community hall

Mass Timber

British Columbia hospital features mass timber community hall

The facility was designed with extensive input from the indigenous community.


By Peter Fabris, Contributing Editor | June 17, 2024
British Columbia's Cowichan District Hospital replacement project features mass timber community hall, Rendering courtesy Parkin Architects
Rendering courtesy Parkin Architects

The Cowichan District Hospital Replacement Project in Duncan, British Columbia, features an expansive community hall featuring mass timber construction. The hall, designed to promote social interaction and connection to give patients, families, and staff a warm and welcoming environment, connects a Diagnostic and Treatment (“D&T”) Block and Inpatient Tower.

The 607,601-sf, seven-story facility was designed with extensive input from the local indigenous community. With meaningful participation from First Nations representatives, the design process is a “first step towards rebuilding trust that has been lost over many decades of mistreatment,” according to architecture firm Parkin. Results of the collaboration include 185 rooms that can accommodate traditional burning customs conducted for healing. These rooms have independently controlled smoke systems.

“In our conversations with the indigenous community members, one of the concerns raised was that patients have experienced discrimination which has led to mistrust and prevents many from accessing health care,” says Shane Czypyha, principal, Parkin Architects. “The triage desk was redesigned in a way that moves security to a less prominent location, creating a more accepting, inclusive environment that fosters healing, while maintaining safety.”

Mass timber for healthcare environments

The two-story community hall employs mass timber throughout, with large windows to maximize sunlight. The inclusion of mass timber required strategies to alleviate concerns around using exposed timber in an acute care hospital. Areas were categorized by risk with public and non-clinical areas such as the community hall, cafeteria, staff lounges, indigenous gathering space, conference rooms, and education centers identified as appropriate candidates for the inclusion of exposed mass timber. Clinical and patient care spaces, such as inpatient bedrooms, were excluded due to the high potential for cross contamination and nosocomial infection transmission.

Selected areas were further divided into high touch vs. low touch surfaces. In high touch or high traffic areas where impact from equipment or mobility aids was likely to occur, exposed timber was either removed, protected with standard acrylic wall barriers and embedded corner guards, or elevated above floor level on durable concrete base pedestals. Proposed sealants used to finish wood structure elements needed to withstand typical hospital grade disinfectants. Timber supports were lifted off the ground to facilitate easier cleaning of flooring, reduce difficult-to-clean seams that can accumulate dirt and debris, and keep wood elements away from direct contact with mop water or floor cleaning machines that could cause premature damage and wear to wood surfaces.

Cowichan is on track to become the first CaGBC Net-Zero Carbon Hospital in Canada, and British Columbia’s first fully electric hospital. The facility will include lounge areas, a coffee bistro, cafeteria, and outdoor patio. An acknowledgement wall recognizes the traditional territory of Cowichan Tribes and welcomes people in Hul’q’umi’num and other languages. Eighty percent of rooms will be single-patient occupancy with room for loved ones. Each floor has sun rooms to connect patients who cannot venture outside with the outdoors. Construction is scheduled to be completed in 2026.

Owner: Island Health Authority
Design architect: Parkin Architects & ZGF Architects
Architect of record: Parkin Architects
MEP engineers: H.H. Angus, Bush, Bohlman & Partners , Mulvey & Banani 
Structural engineer: Bush, Bohlman & Partners
General contractor/construction manager: EllisDon

British Columbia's Cowichan District Hospital replacement project features mass timber community hall
Rendering courtesy Parkin Architects
British Columbia's Cowichan District Hospital replacement project features mass timber community hall
Rendering courtesy Parkin Architects
British Columbia's Cowichan District Hospital replacement project features mass timber community hall
Rendering courtesy Parkin Architects
British Columbia's Cowichan District Hospital replacement project features mass timber community hall
Rendering courtesy Parkin Architects

Related Stories

Mass Timber | Jan 30, 2023

Net-positive, mass timber building will promote research on planetary well-being in Barcelona

ZGF Architects, along with Barcelona-based firms MIRAG and Double Twist, have designed a net-positive, mass timber center for research on planetary well-being. Located in Barcelona, the Mercat del Peix Research Center will bring together global experts in the experimental sciences, social sciences, and humanities to address challenges related to the future of the planet.

Mass Timber | Jan 27, 2023

How to set up your next mass timber construction project for success

XL Construction co-founder Dave Beck shares important preconstruction steps for designing and building mass timber buildings.

Mass Timber | Dec 1, 2022

Cross laminated timber market forecast to more than triple by end of decade

Cross laminated timber (CLT) is gaining acceptance as an eco-friendly building material, a trend that will propel its growth through the end of the 2020s. The CLT market is projected to more than triple from $1.11 billion in 2021 to $3.72 billion by 2030, according to a report from Polaris Market Research.

| Sep 13, 2022

California building codes now allow high-rise mass-timber buildings

California recently enacted new building codes that allow for high-rise mass-timber buildings to be constructed in the state.

Mass Timber | Aug 30, 2022

Mass timber construction in 2022: From fringe to mainstream

Two Timberlab executives discuss the market for mass timber construction and their company's marketing and manufacturing strategies. Sam Dicke, Business Development Manager, and Erica Spiritos, Director of Preconstruction, Timberlab, speak with BD+C's John Caulfield. 

| Aug 8, 2022

Mass timber and net zero design for higher education and lab buildings

When sourced from sustainably managed forests, the use of wood as a replacement for concrete and steel on larger scale construction projects has myriad economic and environmental benefits that have been thoroughly outlined in everything from academic journals to the pages of Newsweek.

Mass Timber | Jun 29, 2022

Mass timber competition: building to net-zero winning proposals

The 2022 Mass Timber Competition: Building to Net-Zero is a design competition to expand the use of mass timber in the United States by demonstrating its versatility across building types and its ability to reduce the carbon footprint of the built environment.

Mass Timber | Jun 2, 2022

Brooklyn is home to New York City’s first mass timber condo building

In the Brooklyn neighborhood of Park Slope, the newly completed Timber House is New York City’s first mass timber condominium building and its largest mass timber project (by height and square footage). 

Mass Timber | May 31, 2022

Tall mass timber buildings number 139 worldwide

An audit of tall mass timber buildings turned up 139 such structures around the world either complete, under construction, or proposed.

Mass Timber | Mar 8, 2022

Heavy timber office and boutique residential building breaks ground in Austin

T3 Eastside, a heavy timber office and boutique residential building, recently broke ground in Austin, Texas.

boombox1
boombox2
native1

More In Category


Sustainable Design and Construction

Northglenn, a Denver suburb, opens a net zero, all-electric city hall with a mass timber structure

Northglenn, Colo., a Denver suburb, has opened the new Northglenn City Hall—a net zero, fully electric building with a mass timber structure. The 32,600-sf, $33.7 million building houses 60 city staffers. Designed by Anderson Mason Dale Architects, Northglenn City Hall is set to become the first municipal building in Colorado, and one of the first in the country, to achieve the Core certification: a green building rating system overseen by the International Living Future Institute.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021