Brown University in Providence, R.I., earlier this month celebrated the virtual topping off of a 96,000-sf wellness center and 162-bed residence hall that, when they open for the fall semester in 2021, will be inside the first new building in Brown’s housing portfolio in 30 years.
The facility is designed to meet LEED v4 Silver standards using Fitwel and WELL certification systems as guidelines. The building will bring together several services for student mental and physical wellbeing, including Health Services, Counseling and Psychological Services, Brown Emergency Medical Services, and BWell, the university’s health promotion program.
The project is part of a strategic sourcing program between Brown University and the construction management firm Shawmut Design and Construction, which is completing this building in partnership with the architecture firm William Rawn Associates. Brown states on its website that the building is a prototype implementation of the vision and principles underlying the university’s Undergraduate Housing Master Plan update (2018).
STEEL-MASS TIMBER STRUCTURE
This photo shows the exterior construction progress that includes a cross-laminated timber deck. Image: Shawmut
The building features a hybrid system of steel framing and cross-laminated timber that will lower the structure’s carbon footprint. The building’s approach to sustainability make it “a one-of-a-kind residential and academic experience that will be a model for holistic student learning and engagement,” said Ron Simoneau, Shawmut’s executive vice president of Education, in a prepared statement.
This project’s Building Team includes LeMessurier Consultants (SE), Vanasse Hangen Brustline (CE), Stephen Stimon Associates (landscape), Accentech (acoustics), Jensen Hughes (code/fire alarm/fire protection), The Green Engineer (sustainability), Adelman and Lelek Engineering (energy modeling), GZA Environmental (Geotech), Environmental Systems (HVAC), Sterling Engineering (EE), and Harry Grodsky & Co. (PE).
The residence hall, on the upper floors of the building, will include a mix of single bedrooms and four-person suites. The health services will be co-located on the lower floors along with the student-led EMS department. (The building will have five floors on its south side, where the ambulance bay is located, and four floors on its north side. The site slopes 12.5 ft from south to north.)
COVID-19 RISK MITIGATION PROTOCOLS
A rendering of Brown University's new Wellness Center and residence hall, which will be ready for the 2021 fall semester. Image: William Rawn Associates
The building will have natural wood ceilings and a visible wood deck. All building systems are electric, and mechanical systems will have energy recovery technology, aligning with Brown’s pledge to reduce campus greenhouse gas emissions to net-zero by 2040.
On this project, Shawmut has rolled out new procedures to minimize the potential risk from the coronavirus. These include protocols such as Shawmut Vitals, a custom technology platform that allows team members to self-certify daily health screenings by scanning a job-specific QR code and completing a health survey. Workers have their temperatures before being allowed onsite and are issued personal protection equipment.
A spokesperson for Shawmut tells BD+C that the Building Team was still reviewing possible adjustments to the building’s design that would abet infection control. The building already incorporates a “ramped up” air ventilation and filtration system with the wellness center integration, this spokesperson says.
Neither Brown University nor Shawmut disclosed the cost of this building.
Related Stories
Market Data | Aug 1, 2023
Nonresidential construction spending increases slightly in June
National nonresidential construction spending increased 0.1% in June, according to an Associated Builders and Contractors analysis of data published today by the U.S. Census Bureau. Spending is up 18% over the past 12 months. On a seasonally adjusted annualized basis, nonresidential spending totaled $1.07 trillion in June.
Market Data | Jul 24, 2023
Leading economists call for 2% increase in building construction spending in 2024
Following a 19.7% surge in spending for commercial, institutional, and industrial buildings in 2023, leading construction industry economists expect spending growth to come back to earth in 2024, according to the July 2023 AIA Consensus Construction Forecast Panel.
Mass Timber | Jul 11, 2023
5 solutions to acoustic issues in mass timber buildings
For all its advantages, mass timber also has a less-heralded quality: its acoustic challenges. Exposed wood ceilings and floors have led to issues with excessive noise. Mass timber experts offer practical solutions to the top five acoustic issues in mass timber buildings.
Adaptive Reuse | Jul 6, 2023
The responsibility of adapting historic university buildings
Shepley Bulfinch's David Whitehill, AIA, believes the adaptive reuse of historic university buildings is not a matter of sentimentality but of practicality, progress, and preservation.
University Buildings | Jun 26, 2023
Univ. of Calif. Riverside’s plant research facility enables year-round plant growth
The University of California, Riverside’s new plant research facility, a state-of-the-art greenhouse with best-in-class research and climate control technologies, recently held its grand opening. Construction of the two-story, 30,000 sf facility was completed in 2021. It then went through two years of preparation and testing.
University Buildings | Jun 26, 2023
Addition by subtraction: The value of open space on higher education campuses
Creating a meaningful academic and student life experience on university and college campuses does not always mean adding a new building. A new or resurrected campus quad, recreational fields, gardens, and other greenspaces can tie a campus together, writes Sean Rosebrugh, AIA, LEED AP, HMC Architects' Higher Education Practice Leader.
Engineers | Jun 14, 2023
The high cost of low maintenance
Walter P Moore’s Javier Balma, PhD, PE, SE, and Webb Wright, PE, identify the primary causes of engineering failures, define proactive versus reactive maintenance, recognize the reasons for deferred maintenance, and identify the financial and safety risks related to deferred maintenance.
University Buildings | Jun 14, 2023
Calif. State University’s new ‘library-plus’ building bridges upper and lower campuses
A three-story “library-plus” building at California State University, East Bay (CSUEB) that ties together the upper and lower campuses was recently completed. The 100,977-sf facility, known as the Collaborative Opportunities for Research & Engagement (“CORE”) Building, is one of the busiest libraries in the CSU system. The previous library served 1.2 million visitors annually.
Higher Education | Jun 14, 2023
Designing higher education facilities without knowing the end users
A team of architects with Page offers five important factors to consider when designing spaces for multiple—and potentially changing—stakeholders.
University Buildings | Jun 9, 2023
Cornell’s new information science building will foster dynamic exchange of ideas and quiet, focused research
Construction recently began on Cornell University’s new 135,000-sf building for the Cornell Ann S. Bowers College of Computing and Information Science (Cornell Bowers CIS). The structure will bring together the departments of Computer Science, Information Science, and Statistics and Data Science for the first time in one complex.