flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Brown University’s Engineering Research Center increases the university’s School of Engineering lab space by 30%

University Buildings

Brown University’s Engineering Research Center increases the university’s School of Engineering lab space by 30%

KieranTimberlake designed the facility and Shawmut Design and Construction was the general contractor.


By David Malone, Associate Editor | July 5, 2018
Teaching Lab in Brown University's ERC

Photo: Warren Jagger Photography

The recently completed Engineering Research Center (ERC) at Brown University provides the school with 80,000 sf of space across three-floors. The building houses specialized research facilities for nanomaterials, photonics, and environmental science to help expand research in renewable energy and advanced materials.

Among the new $88-million facility’s spaces are an 8,000-sf cleanroom for nanomaterials, microelectronics, and photonics, an imaging suite, a bioimaging suite, 22 open-plan research labs, 116 dedicated workstations for graduate students, 20 lab modules, 10 conference/meeting spaces, and a café.

 

Exterior of Brown University's ERCPhoto: Warren Jagger Photography.

 

Also included are the Hazeltine Commons on the building’s first floor and Giancarlo Plaza, a green space outside the building’s front doors. These two spaces are designed to create an “intellectual community” for faculty and students from across the campus.

The ERC is is tracking LEED Gold Certification with an energy and performance goal of 25% better than minimum efficiency and performance criteria established in the Rhode Island-adopted International Energy Conservation Code. Among the building’s sustainable features are 60 glass reinforced concrete vertical fins to manage solar gain, four water-filling stations, and a façade made from 40% glass to capture natural daylight and lower energy costs.

 

The ERC's west entryPhoto: Warren Jagger Photography.

 

Shawmut Design and Construction used Integrated Project Delivery and Lean Construction delivery methods to finish the building months ahead of schedule. This is the first time a Brown University building was completed using these methods.

 

See Also: Virginia Commonwealth has at least three major expansion projects under construction

 

The ERC commonsPhoto: Warren Jagger Photography.

 

"Colorwall" located in ERC at Brown UniversityPhoto: Warren Jagger Photography.

Related Stories

Resiliency | Jun 24, 2021

Oceanographer John Englander talks resiliency and buildings [new on HorizonTV]

New on HorizonTV, oceanographer John Englander discusses his latest book, which warns that, regardless of resilience efforts, sea levels will rise by meters in the coming decades. Adaptation, he says, is the key to future building design and construction.

University Buildings | Jun 14, 2021

Radford University’s new $80.5 million Center for Adaptive Innovation and Creativity

Hord Coplan Macht designed the project in collaboration with William Rawn Associates.

Education Facilities | Jun 4, 2021

Three ProConnect events coming this fall: Sustainability (Nov 2-3), Education (Nov 16-17), Multifamily (Dec 12-14)

SGC Horizon ProConnect 2021 schedule for Education, Multifamily, Office, and Single Family events.

University Buildings | Jun 1, 2021

Georgia Southern’s new $60 million Engineering and Research Building completes

The facility will serve as the new epicenter for engineering excellence and innovation in southeast Georgia.

University Buildings | May 26, 2021

Harvard University Science and Engineering Complex completes

Behnisch Architekten designed the project.

boombox1
boombox2
native1

More In Category

Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021