flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Brown University’s Engineering Research Center increases the university’s School of Engineering lab space by 30%

University Buildings

Brown University’s Engineering Research Center increases the university’s School of Engineering lab space by 30%

KieranTimberlake designed the facility and Shawmut Design and Construction was the general contractor.


By David Malone, Associate Editor | July 5, 2018
Teaching Lab in Brown University's ERC

Photo: Warren Jagger Photography

The recently completed Engineering Research Center (ERC) at Brown University provides the school with 80,000 sf of space across three-floors. The building houses specialized research facilities for nanomaterials, photonics, and environmental science to help expand research in renewable energy and advanced materials.

Among the new $88-million facility’s spaces are an 8,000-sf cleanroom for nanomaterials, microelectronics, and photonics, an imaging suite, a bioimaging suite, 22 open-plan research labs, 116 dedicated workstations for graduate students, 20 lab modules, 10 conference/meeting spaces, and a café.

 

Exterior of Brown University's ERCPhoto: Warren Jagger Photography.

 

Also included are the Hazeltine Commons on the building’s first floor and Giancarlo Plaza, a green space outside the building’s front doors. These two spaces are designed to create an “intellectual community” for faculty and students from across the campus.

The ERC is is tracking LEED Gold Certification with an energy and performance goal of 25% better than minimum efficiency and performance criteria established in the Rhode Island-adopted International Energy Conservation Code. Among the building’s sustainable features are 60 glass reinforced concrete vertical fins to manage solar gain, four water-filling stations, and a façade made from 40% glass to capture natural daylight and lower energy costs.

 

The ERC's west entryPhoto: Warren Jagger Photography.

 

Shawmut Design and Construction used Integrated Project Delivery and Lean Construction delivery methods to finish the building months ahead of schedule. This is the first time a Brown University building was completed using these methods.

 

See Also: Virginia Commonwealth has at least three major expansion projects under construction

 

The ERC commonsPhoto: Warren Jagger Photography.

 

"Colorwall" located in ERC at Brown UniversityPhoto: Warren Jagger Photography.

Related Stories

University Buildings | Mar 17, 2021

UIC’s Computer Design Center will help meet the demands of a growing student body

LMN Architects in collaboration with Booth Hansen is designing the project.

University Buildings | Feb 26, 2021

Dartmouth College’s new faculty and graduate student center completes

Leers Weinzapfel Associates designed the project.

Market Data | Feb 24, 2021

2021 won’t be a growth year for construction spending, says latest JLL forecast

Predicts second-half improvement toward normalization next year.

Multifamily Housing | Jan 8, 2021

Student housing development in the time of COVID-19

Despite the coronavirus pandemic, many college and university residences were completed in time for classes, live or virtual. Here are 14 of the best.

boombox1
boombox2
native1

More In Category

Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021