flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

California medical center breaks ground on behavioral health facility for both adults and children

Healthcare Facilities

California medical center breaks ground on behavioral health facility for both adults and children

Improved patient privacy, more outdoor access are key to HGA’s design for the 207,000-sf Child, Adolescent, and Adult Behavioral Health Services Center. 


By Novid Parsi, Contributing Editor  | March 25, 2023
California medical center breaks ground on behavioral health facility for both adults and children Rendering courtesy HGA
All renderings courtesy HGA

In San Jose, Calif., Santa Clara Valley Medical Center (SCVMC) has broken ground on a new behavioral health facility: the Child, Adolescent, and Adult Behavioral Health Services Center. The facility will open to patients in fall 2025.

Designed by HGA, the center will bring together under one roof Santa Clara County’s behavioral health offerings, including Emergency Psychiatric Services and Urgent Care. The new facility aims to fill a regional service gap as the first Santa Clara County-operated inpatient facility specifically for children and adolescents in need of behavioral health care, and it will have a separate floor for adults.

With the three-story, 207,000-sf behavioral health facility, SCVMC will expand its current adult behavioral health programs to include co-located outpatient and inpatient services for children and adolescents in an age-appropriate treatment environment.

Key spaces include a 77-bed inpatient behavioral health hospital that will serve adults and minors on different floors, separate outpatient urgent care for minors and adults, emergency psychiatric services with separate ambulance entry bays, treatment spaces for minors and adults, and a shared pharmacy. The facility also will have administrative offices, a new 700-car parking structure, and a pedestrian skyway bridge connecting to the existing emergency department.

Throughout the design phase, HGA met with multiple user groups three days per week. HGA researchers studied the impact of improved patient privacy and outdoor access on patient behavior and the need for restraint. The facility’s design prioritizes connections to nature with separate outdoor activity and recreation spaces for each inpatient unit and for Emergency Psychiatric Services.

On the Building Team:
Owner: County of Santa Clara Health System
Design architect: HGA, supported by The Cuningham Group (associate architect and medical planner)
Architect of record: HGA
MEP engineer: Arup
Structural engineer: Arup
General contractor/construction manager: Webcor, SBay Construction, and Thompson Builders

Santa Clara Valley Medical Center breaks ground on a behavioral health facility for both adults and children. Rendering courtesy HGA

Santa Clara Valley Medical Center breaks ground on a behavioral health facility for both adults and children. Rendering courtesy HGA

Santa Clara Valley Medical Center breaks ground on a behavioral health facility for both adults and children. Rendering courtesy HGA

Santa Clara Valley Medical Center breaks ground on a behavioral health facility for both adults and children. Rendering courtesy HGA

Santa Clara Valley Medical Center breaks ground on a behavioral health facility for both adults and children. Rendering courtesy HGA

Santa Clara Valley Medical Center breaks ground on a behavioral health facility for both adults and children. Rendering courtesy HGA

Santa Clara Valley Medical Center breaks ground on a behavioral health facility for both adults and children. Rendering courtesy HGA

Santa Clara Valley Medical Center breaks ground on a behavioral health facility for both adults and children. Rendering courtesy HGA

Santa Clara Valley Medical Center breaks ground on a behavioral health facility for both adults and children. Rendering courtesy HGA

Santa Clara Valley Medical Center breaks ground on Child, Adolescent, and Adult Behavioral Health Services Center, by HGA

Santa Clara Valley Medical Center breaks ground on Child, Adolescent, and Adult Behavioral Health Services Center, by HGA

Tags

Related Stories

Healthcare Facilities | Oct 28, 2024

New surgical tower is largest addition to UNC Health campus in Chapel Hill

Construction on UNC Health’s North Carolina Surgical Hospital, the largest addition to the Chapel Hill campus since it was built in 1952, was recently completed. The seven-story, 375,000-sf structure houses 26 operating rooms, four of which are hybrid size to accommodate additional equipment and technology for newly developed procedures. 

Healthcare Facilities | Oct 18, 2024

7 design lessons for future-proofing academic medical centers

HOK’s Paul Strohm and Scott Rawlings and Indiana University Health’s Jim Mladucky share strategies for planning and designing academic medical centers that remain impactful for generations to come.

Seismic Design | Oct 17, 2024

Calif. governor signs limited extension to hospital seismic retrofit mandate

Some California hospitals will have three additional years to comply with the state’s seismic retrofit mandate, after Gov. Gavin Newsom signed a bill extending the 2030 deadline.

Healthcare Facilities | Oct 9, 2024

How healthcare operations inform design

Amanda Fisher, Communications Specialist, shares how BWBR's personalized approach and specialized experience can make a meaningful impact to healthcare facilities.

Healthcare Facilities | Oct 8, 2024

Herzog & de Meuron completes Switzerland’s largest children’s hospital

The new University Children’s Hospital Zurich features 114 rooftop patient rooms designed like wooden cottages with their own roofs. The project also includes a research and teaching facility.

Hospital Design Trends | Sep 26, 2024

Hospital benchmarking survey shows sharp rise in hospital energy costs

Grumman|Butkus Associates, a firm of energy efficiency consultants and sustainable design engineers, recently released the results of its 2023 Hospital Energy and Water Benchmarking Survey, focusing on healthcare facilities’ resource usage trends and costs for calendar years 2021 and 2022.

Healthcare Facilities | Sep 19, 2024

New El Paso VA healthcare center includes 47 departments, brain and spinal cord injury treatment services

A new 492,000 sf Veterans Administration ambulatory care facility on the William Beaumont Army Medical Center campus near El Paso, Texas will include 47 medical departments and provide brain and spinal cord injury treatment services. A design-build team of Clark Construction, SmithGroup, and HKS is spearheading the project that recently broke ground with anticipated completion in 2028.

Healthcare Facilities | Sep 9, 2024

Exploring the cutting edge of neuroscience facility design

BWBR Communications Specialist Amanda Fisher shares the unique considerations and challenges of designing neuroscience facilities.

Curtain Wall | Aug 15, 2024

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

Sponsored | Healthcare Facilities | Aug 8, 2024

U.S. healthcare building sector trends and innovations for 2024-2025

As new medicines, treatment regimens, and clinical protocols radically alter the medical world, facilities and building environments in which they take form are similarly evolving rapidly. Innovations and trends related to products, materials, assemblies, and building systems for the U.S. healthcare building sector have opened new avenues for better care delivery. Discussions with leading healthcare architecture, engineering, and construction (AEC) firms and owners-operators offer insights into some of the most promising directions. This course is worth 1.0 AIA/HSW learning unit.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021